Kostnadsuppföljning avproduktionskalkyler
Calculations are an important part of planning around a construction project. From concept to completion of the project calculation is a tool to try to predict the actual cost. During the production stage in particular, deviations occur which makes the actual cost different from the calculations.This thesis is done in collaboration with JM Residential Stockholm. The study includes a cost follow-up in which a comparison was made between the calculated production cost and actual cost for the five projects. The aim of the study was to observe the most common reasons that a project deviates from the calculated production cost and then summing these causes in a number of categories.
Duschhållare
This report will discuss principle, primary and finally manufacturing structure. We were asked to produce a 3D milling to processing the prototype material that is used on the University of Halmstad. From conceptual drawings to produce components for this project have we together with a number of company take developed the right components for this project. We have calculated and analyzed the construction to get the best result for it purpose. Unfortunately have the process to produce the 3D milling has been stopped because of deficient budget and time.
Villkor under garantitid i entreprenadförsäkring, en jämförande studie.
In Sweden there is no legal regulation for the obligations and responsibilities between the contracting parties within the construction, civil engineering and installation sector. To clarify uncertainties regarding the liability, actors from theses sectors have agreed upon a voluntary regulation, called the General Conditions of Contract.When insurance companies want to enter the Swedish construction insurance market, they face a regulatory framework that not only regulates the construction market, it also imposes requirements on terms and conditions that must be included in the construction insurance. These terms are perceived as ambiguities and create difficulties and inhibit the ability for these insurance companies to offer competitive insurances. One of the terms that create these difficulties is the guarantee period, which is period of time starting from handing over the construction project to the employer, during this period the contractor still has the responsibility for the construction project. The guarantee period regulated by the General Condition of Contracts differs from the international use of the term both in length and in content.
Strategiska partnerskap mellan banker och byggföretag. ? En studie av Stockholms aktörer.
This study is an initial attempt to investigate the relationship between banks and developers in Stockholm and its regions. It gives a good impression about the field of construction and project developments in terms of the finance and the negotiations associated with these types of projects. Main actors of the Stockholm?s construction financing market were of major interest for this study. On this regard, the relationships and ramifications of this group were investigated by using a qualitative and quantitative research method.
Mätutrustning för ytjämnhet
This report will discuss principle, primary and finally manufacturing structure. We were asked to produce a 3D milling to processing the prototype material that is used on the University of Halmstad. From conceptual drawings to produce components for this project have we together with a number of company take developed the right components for this project. We have calculated and analyzed the construction to get the best result for it purpose. Unfortunately have the process to produce the 3D milling has been stopped because of deficient budget and time.
Parametrisering av lyftok
This report will discuss principle, primary and finally manufacturing structure. We were asked to produce a 3D milling to processing the prototype material that is used on the University of Halmstad. From conceptual drawings to produce components for this project have we together with a number of company take developed the right components for this project. We have calculated and analyzed the construction to get the best result for it purpose. Unfortunately have the process to produce the 3D milling has been stopped because of deficient budget and time.
FNA-klassad lastbilspåbyggnad
This report will discuss principle, primary and finally manufacturing structure. We were asked to produce a 3D milling to processing the prototype material that is used on the University of Halmstad. From conceptual drawings to produce components for this project have we together with a number of company take developed the right components for this project. We have calculated and analyzed the construction to get the best result for it purpose. Unfortunately have the process to produce the 3D milling has been stopped because of deficient budget and time.
Skjuvhållfasthet och deformationsegenskaper för Uppsalalera med CRS och standardödometer
Shear Strength and Deformation Characteristics of Uppsala Clay with CRS and Standard OedometerTyra Morell Bonin & Magdalena MählerTo see how much a clay compact under different pressure one can use several different methods and in this project, two methods were used, the Standard Oedometer and a CRS apparatus. A Standard Oedometer is a full-time manual device and the CRS apparatus is a modern electric and automatic device. The aim of the project was to see similarities and differences between the two methods and examine which method that were most reliable. This has been done with repeated laboratory tests and afterward evaluations. With this information one can get a picture of how the clay will behave and how it will deform in nature.
Kommunikations- besluts- och informationsflöden i byggprocessen
Construction projects are organized in different shapes and disturbances in the information flow in these processes can lead to problems, such as delays and/or a lower quality. Therefore, a well-functioning interaction between actors and a well thought out-communication at an early stage is of crucial importance. The main question is "How does the communication of decision and information flow in the building process and what barriers and opportunities can be observed?". This diploma work has been written with guidance from Bjerking AB and to answer this question, a collection of empirical data conducted via semi-structured interviews.
Hang n' GO : Cykelhållaren som alltid finns tillgänglig
This report will discuss principle, primary and finally manufacturing structure. We were asked to produce a 3D milling to processing the prototype material that is used on the University of Halmstad. From conceptual drawings to produce components for this project have we together with a number of company take developed the right components for this project. We have calculated and analyzed the construction to get the best result for it purpose. Unfortunately have the process to produce the 3D milling has been stopped because of deficient budget and time.
3D Fräs
This report will discuss principle, primary and finally manufacturing structure. We were asked to produce a 3D milling to processing the prototype material that is used on the University of Halmstad. From conceptual drawings to produce components for this project have we together with a number of company take developed the right components for this project. We have calculated and analyzed the construction to get the best result for it purpose. Unfortunately have the process to produce the 3D milling has been stopped because of deficient budget and time.
Konstruktion och design av arbetsplats - för kablagemontör
This degree project has been performed with Mega Teknik AB in Landskrona. The project has resulted in a workplace for the cable installers of Mega Teknik. The workplace contains a workbench and a cart.The first stage in this project was to make an analysis of the current workplace to identify the needs the installers had.The different principle construction proposals of how the workbench would look like and which functions it would have was made during brainstorming, in groups and alone. These proposals were compared against each other using a functional analysis that has been put up to get the principle construction that fulfilled most points in this analysis.The proposal chose for further work was a cart and a bench with a module intends, the table got a formulation that creates a better reach for the installers.This proposal was generated in Catia V5 to get a better overview of the suggested proposal.During the primary structure phase drawings over all the products were made and the components were chosen. Calculations were made and the product got the dimension required.
PlusTak
Today´s roofing of dwelling houses is a very time consuming procedure, which includes a lot of different steps on the construction site. Not only does it cost a lot of money, but often do problems with rot and mold occur in the attics of houses today. The use of prefabricated modules has seen a great breakthrough in the field of construction of dwelling houses; at least when it comes to foundations and walls, where this type of approach makes the construction process way more efficient. What no one previous has succeeded to develop is a corresponding system for roofs that meets the demands of a dwelling house. Accordingly the goal of PlusTak has been to come up with a proper module system for roofing of dwelling houses, where the roofing is completed to meet the demands of the Scandinavian market. During the project a lot of effort has been put into customer contacts and the usability of the product, as well in the manufacturing process as on the construction site. This development has gone hand in hand with several practical tests and tryouts.
Automatisk viktkontroll av glascontainer
This degree project has been carried out in cooperation with Gedevelop in Helsingborg.Gedevelop has developed a camera that can calculate the weight of a liquid glass mass.Because of the density and viscosity changes in the glass, the weight information issometimes incorrect given. Glass industry is today addressing the problem by an operatorperforming a manual weighing of a few bottles which, in turn, calibrates the camera system.The project aimed to develop an automated system to control the weighing of glass bottles forglass industries. This system must be so flexible that it can be easily mounted on plants withdifferent production equipment around the world.The project includes design and construction of equipment that meets the requirementsformulated together with Gedevelop. Work has been done both in Halmstad and Helsingborgand has included both calculations and review of the theory to understand the forces thatinfluence the design of different construction parts. A prototype was produced that meets theoperating requirements for the design and can be used in testing features.
Anläggning av traditionellt VA-schakt : En fallstudie i logistik och byggstyrning
A growing issue in the construction industry is how production can become moreefficient by using logistical solutions. Companies can minimize the cost of a project byreducing the time to perform the work.The purpose of this report was to examine the logistics related to pipe trenches forSIAAB. The report's focus has been on solving problems and planning that wouldfacilitate the work of the project Vaksala-Lunda Etapp 3.The case study consists of interviews with SIAAB's employees and an observationwhere the progress of a traditional pipe trench has been documented using checklists.Questions to the report?s case study come from the theoretical part, which is basedon literature on construction management and logistics in general. The observationlasted five weeks and the biggest time-consuming events that affected the pipe trenchduring this time, has received most attention.