Anläggning av traditionellt VA-schakt

En fallstudie i logistik och byggstyrning


A growing issue in the construction industry is how production can become moreefficient by using logistical solutions. Companies can minimize the cost of a project byreducing the time to perform the work.The purpose of this report was to examine the logistics related to pipe trenches forSIAAB. The report's focus has been on solving problems and planning that wouldfacilitate the work of the project Vaksala-Lunda Etapp 3.The case study consists of interviews with SIAAB's employees and an observationwhere the progress of a traditional pipe trench has been documented using checklists.Questions to the report?s case study come from the theoretical part, which is basedon literature on construction management and logistics in general. The observationlasted five weeks and the biggest time-consuming events that affected the pipe trenchduring this time, has received most attention. Last part of the report is a compilationof the authors' own thoughts and opinions.The production was difficult in this case because the earlier stages of the project wereweak. The extent of SIAAB's planning could have been higher, but this wascomplicated when employees were tied to previous projects.

Författare

William Alcazar Erik Hammargren

Lärosäte och institution

Uppsala universitet/Byggteknik

Nivå:

"Uppsats för yrkesexamina på grundnivå". Självständigt arbete (examensarbete)om minst 15 högskolepoäng utfört för att erhålla yrkesexamen på grundnivå.

Läs mer..