2308 Uppsatser om Concrete construction - Sida 15 av 154
Projektorganiseringen som drivkraft och hinder för industriell förnyelse i byggindustrin : en fallstudie av Skandionkliniken
Understanding how innovation and renewal occurs in an industry is important for how to manage technical development for individual companies. It is also important for creating a beneficial industrial context for renewal, from both a political and an industrial perspective, in which new solutions can arise and spread through the involvement of several actors of the industry. How innovation and renewal occurs in the construction industry in Sweden is however viewed differently. One challenge that has been pointed to is that most of the work performed in the construction industry is organized in projects, which in turn should affect how innovation and renewal can be achieved. The aim of this thesis is to provide an understanding of how the project organizing in the industry affects innovation and renewal. This is executed through a case study of the construction of Skandionkliniken, a proton therapy clinic, and by using an industrial network theory that challenges the traditional view of how innovation is achieved.
Kontroll för ökad kvalitet - mallar för kontrollplan-PBL, egenkontroll samt riskanalys
There are problems with poor quality, poor scheduling and poor working climate in the Swedish construction industry. Many parts have been involved, trying to solve the problem.This spring a new planning and building-law becomes final. In this law, the requirements set on the controls are greater. Hopefully this will lead to fewer construction errors. The requirements set on the working environment have also increased, forcing consultants and contractors to focus on safe workplaces.For each project requiring a building permit, an inspection plan has to been drawn.
Hus på väg : En kostnadsstudie över flyttning av tre enfamiljshus
This thesis treats Building Information Modeling, BIM, in the production stage. Brieflydescribed BIM is virtual model of a building object where all information about theobject is gathered. All the involved operators in the construction project have access tothe model and can gather or share information about the project. There are several waysto apply BIM in the production stage. This thesis primarily deals with visualization of theobject, preparation and planning, the ability to take amounts from the model andcoordination and clash control.The basic issue was highlighted by Byggdialog AB.
Kartläggning och visualisering av riggkonstruktionsprocessen : Fallstudie från Scania
Mapping a process enables a greater understanding of the work, and is standard to evaluate and improve a process. This thesis is conducted at Test Bed Mechanical Design at Scania in Södertälje. Test Bed Construction is a complex process, characterized by a large amount of creative work, technical challenges and coordination between different people and different organizational functions.The aim of the thesis was to identify the Test Bed Construction Process and to develop a visual model of the workflow that also served as support for the engineers in their daily work. During the mapping process, comparisons were made with previous research in lean product development to identify process improvement.A literature review on process mapping and process visualisation resulted in a method for process mapping. The study showed that research on process visualisation is neither structured nor well defined.
Småhusproduktion : Utvecklingsmöjligheter hos JM AB
The Swedish building contractor JMRegion Öst would like to to investigatethe possibilities of developing andstreamlining the production of singlefamilyhouses. JM are producing singlefamilyhouses with prefabricated framesat a rate of about two houses per week.During construction, the different tasksare performed by JM?s own productionstaff but also by varioussubcontractors.When examining the schedules of recentlyproduced projects, it appears that allthe houses are more or less completedeight weeks before the customer moves into the house. During those eight weeksseveral operations are conducted such asinspections, installation of appliancesand cleaning procedures. The inspectionperiod constitutes between 25 and 35% ofthe complete construction period.By conducting interviews, it has beendiscovered that this final phase is anessential security buffer for delays anderrors that often occur.
Internationell Upphandling av Byggmaterial : En studie över materialimportens potentiella tillämpning hos medelstora och stora byggentreprenörer
High housing- and construction costs is a fact in Sweden today. Prices on building materials more rapidly than producer price index for industrial goods. Prices tend to rise during market boom but does not adapt during diminishing demand. The effects of fading demand can rather be deduced through discounts and quotations. During 1992-1998 when the Swedish construction sector found it self in severe crisis the prices of construction materials kept rising more rapidly than PPI for industrial merchandise.
Laborativ matematik : - Fem pedagogers syn på laborativ matematik
The students are usually eager to develop their mathematical learning. However, the Skolverket can see that this eagerness passes in the early years of school. A study shows that a varied mathematical education creates enthusiasm to learn, which can decrease the negative view of mathematics.The purpose of this study is to see how five pedagogues use laboratory mathematics, their approaches to laboratory mathematics as well as to find out their role in the laboratory education. The result of the study is based on interviews with the pedagogues, who are all teachers for students in year F-3. All of the pedagogues work in a laboratory way, but to different extents.The study shows that the pedagogues aim to make the mathematics as concrete and everyday as possible.
BIM i produktionsskedet
This thesis treats Building Information Modeling, BIM, in the production stage. Brieflydescribed BIM is virtual model of a building object where all information about theobject is gathered. All the involved operators in the construction project have access tothe model and can gather or share information about the project. There are several waysto apply BIM in the production stage. This thesis primarily deals with visualization of theobject, preparation and planning, the ability to take amounts from the model andcoordination and clash control.The basic issue was highlighted by Byggdialog AB.
Reflekterande eller reproducerande matematik : en jämförande studie mellan två undervisningsmetoder i matematik, det laborativa och det traditionella
In each classroom there is a teacher with good intentions wanting what´s best for their pupils. But grades and tests in mathematics from 2009 in Sweden shows there is a crack between the subject being taught and the learning child. The purpose with this research is to find an understanding from a teaching and learning perspective of which teaching method is more suitable for teaching and learning mathematics by doing a comparison between two methods. The main question is:What are the advantages and disadvantages of the traditional and the laboratory method of teaching, supported by the two keywords teaching method and learning?This C-paper is based on a qualitative research aiming to gather an in-depth understanding of human behavior.
Informationsutbyte från BIM-modeller : Från BIM-modell till format hanterbara av förvaltning- och GIS-system
BIM has been a trend in recent years when it comes to design and construction ofnew buildings. However, there has been less talk about what happens to BIM modelsafter the construction phase.This issue has been raised at the Forsmark construction documentation department.This thesis aims to look at how the information in a BIM model can be transferred tofacility management and GIS systems and thus add value, even after the constructionphase.Questions raises how such an exchange might look like and whether it is reliable.How should a claim be brought to planners for such an exchange to work.This thesis tested some of the most common methods for this kind of exchange ofinformation from BIM models to facility management and GIS. It was formats like IFC,Fi2xml and a database connectivity that was analyzed by a computer simulation of amodel provided by Forsmark. The model consisted of an existing office building atForsmark, modeled in Autodesk Revit.The results indicate that the formats tested require a precise plotting of the models.The loss of information that came to light in the simulation could be attributed tofailure modeling in Revit. Even such things as naming of areas must be consistent.
Hjullyft
The graduation essay has been carried out in co-operation with Kalmar Industries in Lidhult, Sweden. The purpose of our essay was to develop a complete construction solution on a hoist that could lift a laying wheel, lift it up and then turn it 90 degrees. After that the wheel shall be placed in a special holder.The background of the essay is a record of reports of damage wheels when they been incorrect lifted with a forklift. The hoist shall be used together with the same forklifts that manage the wheels today. Together with our instructor at Kalmar Industries we developed a requirement specification and from that we got free hands.However this was not the main task from the beginning, then a simular hoist should be develop but used directly in the assembly workshop without using a forklift.We started to find principle solutions that later was evaluated against the requirement specification.
Kartläggning av energianvändning under byggfasen vid nyproduktion av flerbostadshus
The energy consumption in the sectors of residential and public buildings is 40 % of the total energy consumption in Sweden. The main part, 85 %, of the energy use in these sectors is for operation of the buildings. The rest is used in the building process. When energy-efficiency measures are taken the energy use during the operation time decreases and the fraction of energy consumption during the building time increases. This project is carried out in cooperation with JM AB and concerns the energy use during the building time of production of blocks of flats at the building site.The main part of the electricity that is used during the production of apartment buildings goes into the heating of portacabins and illumination of the building during the construction phase.
Komfortsanalys med hänsyn till vibrationer orsakade av människoaktiviteter. : Ett modernt dimensioneringsproblem för huskonstruktörer
Comfort analyses regarding human induced vibrationsIt is not too common among civil engineers in Sweden to perform comfort analyses considering the vibrations caused by human activities. In addition, the Swedish standards lack requirements to be used for comfort analyses in design of floor-systems. The demand for large spans in combination with slender slabs, is today a reason to investigate the floor-system constructions, in order to prevent disturbing vibrations and oscillations.The purpose of this thesis is to create a guide for how a comfort analysis, considering vibrations, should be implemented. Göran Svedenbjörk who is an expert in structural dynamics has been interviewed where he presents his latest project Värtaterminalen and answers some questions about vibrations due to human activities.Floor-systems, consisting of concrete slabs supported by steel or concrete beams, have been investigated with simulations in the finite element program Abaqus. In the simulations, the influence of various factors on the natural frequency of floor-systems and the acceleration level caused by dynamic loads, is studied.
Erfarenhetsåterföring :
This thesis has been done in collaboration with Peab Stockholm Building 3, which is a region within the Peab Sverige AB. The report is based on a survey and studies of Peab business management systems and production literature. For general information gathering has literature from well-known sources collected in libraries and through the Internet. It shows through the work that Peab has routines for experience feedback in the construction process, but that these procedures work in a small scale and the practical work experience feedback does not work at all. This is also something the construction industry in general also perceived as problematic. The questions in the report are of a wide scale and concerns construction errors cost, how the employees perceive that the company takes advantage of the skills and the mental stress in production line. The goal is to find how Peab Stockholm Building 3 will work on the experience feedback to allow for better productivity. In conclusion, the report author tries to demonstrate what can lead to increased productivity and improved work experience..
Effekter av nya PBL : En studie av processen från handläggning av bygglovsansökan till slutbesked
It has now passed two years since the new site- and construction law, PBL, went into force. It replaced the previous PBL applicable since 1987, and it involves relatively large changes in many different areas of the construction sector. The ambitions of the new law are for instance to simplify and clarify the legal text, increase efficiency in the permitting processes and improve the quality of construction. To achieve this, a variety of changes was made. Some of the most important are: inserted deadline in the processing of building applications, extended assessment of building applications, revised rules about controlplan and quality manager, a certificate is required to start and end the project, an additional meeting is inserted and the construction management of the municipalities will have to do a mandatory visit at the work scene.