Sök:

Sökresultat:

4842 Uppsatser om Building project - Sida 13 av 323

Information bibliotek företag En utvärdering av EU-projektet "ITF på biblioteken i östra Värmland"

This report is the result of an evaluation of a project, conducted by five regional libraries. Through a training course the project should inspire small and medium sized enterprises to use modern information technology and Internet when searching for information. To evaluate the project, qualitative interviews were conducted with five librarians and quantitative questionnaires were distributed to all the course participants. The evaluation shows that the project goals were met, apart from the number of course participants, which was much lower than anticipated. It also shows that the project resulted in an increase in information technology and competence at the libraries, and that the course participants profit from their increased knowledge in their daily work..

Från 2D till BIM i ett trähusföretag : Transition from 2D-CAD to BIM in a timber frame home company

A prefabricated timber frame house previously built by Villafabriken AB has been modeled in Autodesk Revit Architectural, a 3D-program based on BIM-technology. This has been done tosee if it?s possible to produce the publications that Villafabriken demands from the designengineer?s work, and examine which possible extra values that may arise compared to traditional 2D-CAD drawing.BIM is short for Building Information Modeling. Everything is stored in a single database and a change in the project file is automatically updated across the project. BIM provides more than just drawings since information from the model can be retrieved in various ways such as lists and quantity schedules.It was possible to produce the publications that Villafabriken demanded using Revit, but BIM doesn?t only mean a new way of drawing, it also require a change in the company?s process were the information from the model is being used..

Mer hyresrätter åt folket! En studie om Hallands hyresbostadsmarknad. : - Att skapa lönsamhet för hyresrätter

A variety of demands have to be considered in the design of a new opera house in Galärvarvet. All possible viewpoints are important to be aware of, as is the need for the new building to be a contrast to the already existing opera house in Stockholm. The restricted site also makes a multitude of demands on the building's design.By rationalizing the layout and structure and also by making the footprint smaller, the complex building of over 30 000 square meters can be fitted and blended into the existing physical context. Unlike the existing opera house in Stockholm, the new opera house shows the rationality and the advanced technology that lies behind the scenes and becomes the character of the entire building. Through the dynamic façade, the new opera can convey any character it so desires, just like scenes do through different settings.

Byggnadsminnesförklaring : ett långsiktig hållbart skydd?

There are currently 2160 buildings in Sweden that are protected by law with the designation as a cultural heritage building, which is the strongest protection that can be obtained for a building of cultural historic significance. The purpose of this thesis is to research how strong and sustainable the protection of such a designation is and how you can motivate a revocation. Furthermore, this thesis aims to give an overall insight into all cases where there has been a revocation.To achieve the protection of a designation as a cultural heritage building, the object has to be of outstanding interest on account of its cultural historic value. In the first part, this thesis gives a short historic background of the cultural heritage law and its terms, like outstanding interest and cultural historic value. The County Administrative Board's documents about revocation are the main source for this research.There have been 24 cases of revocation and the frequency of such cases has increased in the past ten years.

Att närma sig Boden :

approaching Boden deals with the approaching of a city, both in a physical sense ? along the road ? and in a spiritual sense ? in mind. The physical encounter with a city is represented by the experience of the road and its surroundings, while the spiritual encounter is represented by the idea of the city that we already have, or will get, in our minds. We have in this degree project approached Boden through a thoroughly analysis of both the entrance roads and the city itself. In this degree project we are looking for ways of how to create characteristic and interesting entrance roads to a city, with Boden as an example. This demands knowledge about the problems involving entrance roads as well as the distinctive features of the city.

Skolbioprojektet i Kungsbacka - en etablerad verksamhet?

This thesis is an attempt to study if the school cinema project in Kungsbacka is an establishedactivity. Qualitative interviews have been performed with the cinema owner, the projectleader and a politician of the municipality, about their views on the project. Teachers andpupils have also been interviewed. In the case of an established activity, the thesis also attemptsto answer what causes have contributed to such an establishment.The study shows that the school cinema project is an established activity in Kungsbacka andthat all parties involved are satisfied with it. The project has guaranteed the cinema's existence.According to the thesis, the reasons for the establishment are that govemment funds enabiedthe project to initiate.

Energiåtgång under tillverkning och produktion av byggnadskomponenter

This diploma work addresses the question of how much energy is spent whenmanufacturing the components of a building as well as of how much energy is used inthe production of a building. The object of the studies is BioCentrum at the SwedishUniversity of Agricultural Sciences in Ultuna just outside the city of Uppsala. The aimof the work was to investigate how much energy was consumed when manufacturingand production in relation to the management, how many years the production wasrepresented. It was also a study in how mature the construction industry is to answerhow much energy was consumed in manufacturing.In order to get these answers a question form was developed and sent to thesuppliers to BioCentrum. In this form they were to respond to the quantity suppliedto BioCentrum and the amount of energy was spent when manufacturing thecomponents.

Energi och klimatanalys O-huset på Campus i Halmstad

AbstractThe indoor environment affects the human performance. Noise pollution, poor lightning and coloring are some of the factors that affect our work performance. The human is also affected by the air change and temperature, these factors are in most buildings possible to adjust and through this make economic savings. To find out about the indoor environment in the O-building a questionnaire was handed out, measurements/surveys and an interview was also made. 108 questionnaires where handed out to employees and students.

Förutsättningar för att utnyttja solceller i Sala-Heby relaterat till ekonomiska stöd

There have been several projects with solar installations in Sweden, and Sala-Heby Energi (SHE) wanted to create a solar plant. The question answered in this thesis is whether it is economically viable to create such a source of sustainable, renewable energy. The plant would be built with the help of the financial effort from 120 customers. This economic union would sell the electricity to the SHE, for SEK 4.50 per kWh up to a certain level over a period of 10 years. It would be a long term commitment to environmentally friendly electricity, using solar cells which convert sunlight directly into electricity.In year 2009 there was introduced a new state aid for photovoltaic systems, to create an increased and continuing interest in solar cells.

Hotell- Stockholms skärgård

The hotel is located on Skatholmen in the archipelago of Stockholm, Värmdö county. The hotel building has an open structure characterized by hospitality and the nature outside. The rooms have stunning views of the island landscape and lush forest. With biodiversity and valuable nature in mind, the building has been designed with a structure that should not be too intrusive in the surrounding landscape. The building is meant to blend into the dark silhouette of the island and to give a light footprint on the topography of the landscape.The use of well-chosen materials and similar design, both in plan and facade, creates a consistent building despite the building's somewhat playful expression.

Indoor Energy Academy : Implemetering- och kompetensutvecklingsprogramför nyanställda hos Indoor Energy

Indoor Energy is a company that works in the energy sector. It works through itsthree subsidiaries Indoor Energy Services, Indoor Energy Control and Indoor EnergyConsultants. Because of their comprehensive experience and offering of broad rangeof services they can contribute to integrated extensive solutions for their customers.Indoor Energy Control works with building management through control andregulation. This work is realigned by programmers and project managers. Working inthis area is complex and places a great demand on both technical innovation andprofessional project management.Due to the complexity of the work Indoor Energy Control has a hard time to get thenew employees to be independent in their work as a programmer.

Åtgärdsförslag och känslighetsanalys vid energieffektivisering ur ett fuktsäkert perspektiv : En fallstudie på timmerhuset Sofiedals herrgård

This thesis investigated the possibilities to resume cultivation of an old manor house built of timber and what this would mean from an energy and moisture perspective. The building in this case study is named Sofiedals mansion and was built in 1858 in Valbo 11 kilometers west of Gävle.The structure of the house was documented and used as a starting-point for carrying out calculations focused on energy and moisture aspects. With the help of a number of computer programs and a conducted air tightness test, the buildings energy consumption were calculated and compared with the current building regulations.In addition, the building was analyzed considering energy retrofitting and what it meant for moisture problems. The energy retrofitting consisted of additional insulation, decreasing the buildings permeability through air sealing; window and door replacements. When a building is equipped with natural ventilation it is difficult to know its precise performance and how an energy retrofitting affects it.

Somnus Hushåll

A product and design development of a household device which shall dry food waste has beencarried out in collaboration with Smedlund Miljösystem AB.This project has been implemented through several brainstorms and a questionnaire study.A great insight of how it is to work in a project in real work life has this project been givenme. This is a slightly less straight road to a conclusion than in the academic world that I amused to..

Effektiviseringspotential inom projekt

The work is performed at Forsmark Group AB as a final step in the Bachelor ofScience program in nuclear engineering at the University of Uppsala in 2013.The work is part of an ongoing process of streamlining project system model FKA.Streamlining the project model is an important aspect that affects all largecompanies that somehow have a project governing body when there is muchfinancial resources to save. Although the quality of the projects is positivelyaffected by efficiencyThe aim is to find possible common weaknesses and strengths of the project systemby interviewing a number of project managers, and using the systems in placeexamine the model.As part of the work also includes examining what project managers have to adjust tothe newly implemented system VPMM, and other newly introduced elements thathave been added to improve the efficiency in the futureProject System is a complex system that is influenced by many different parametersand participating individuals' attitude and personality. But then small changes in themodel could have major economic consequences.The thesis has generated results that show common weaknesses among the variousprojects and their project managers' general opinions about the project model. It alsopresents some possible solutions based on own thoughts and those interviewedobjects suggestions and comments..

Energikrav i upphandling av bygg- och anläggningsprojekt

The building and plant sectors represent a large part of Sweden?s energy use. Putting energy requirements in public procurement as a tool for reducing energy consumption in the building and plant sectors is therefor an opportunity that operators can take advantage of. The aim of this thesis was to map the energy requirements in procurement that operators in the public sector use today in building and plant projects. The analysis was made with respect to if the energy requirements corresponded to the parts with large energy use in building and plant projects and also in which way energy requirements in procurement are written in the contract.

<- Föregående sida 13 Nästa sida ->