Sökresultat:
9520 Uppsatser om Building process - Sida 8 av 635
Bergvärme och solenergi i flerbostadshus : En förstudie över Kv. Uppfarten
The society strives for sustainable development, in the construction industry it is expressed through sustainable building. Energy and LCC analyzes increases the ability to make conscious decisions in the process. A problem in the construction industry is that energy and LCC analysis is not used to the desired extent, as they are perceived as complicated and time consuming. The report aims to achieve a more sustainable building through increased use of energy and LCC analyzes.The goal is to show how BIM can be used to improve the efficiency of the energy and LCC analyzes.The study was conducted with a literature review and a case study to answer which information that is required in a BIM model to perform energy and LCC analyzes. The study also shows which software can be used in BIM based energy and LCC analyzes and how the analyzes can be carried out efficiently.The result shows that effective analyzes may be performed if the BIM-model contains the relevant information for making analyzes.
Högt hus i Chongqing/Kina - ett bostadsprojekt
This is a project showing a proposal on how a high-rise building gains qualities similar to middle rise houses of 7-9 stories. The closed, isolated and often anonymous life in the high building opens up through gardens. The resident meet the outdoor environment on the balcony, or has direct access to a garden.Instead of moving in a closed core, the resident will meet the climate and outdoor conditions as soon as he or she leaves the apartment.The project consists of two parts, where the first is presenting a building proposal, the second is expanding the knowledge through background research. The topics are history concerning the skyscraper and the skyscraper globally, closing up with the situation in China..
Åtgärdsförslag och känslighetsanalys vid energieffektivisering ur ett fuktsäkert perspektiv : En fallstudie på timmerhuset Sofiedals herrgård
This thesis investigated the possibilities to resume cultivation of an old manor house built of timber and what this would mean from an energy and moisture perspective. The building in this case study is named Sofiedals mansion and was built in 1858 in Valbo 11 kilometers west of Gävle.The structure of the house was documented and used as a starting-point for carrying out calculations focused on energy and moisture aspects. With the help of a number of computer programs and a conducted air tightness test, the buildings energy consumption were calculated and compared with the current building regulations.In addition, the building was analyzed considering energy retrofitting and what it meant for moisture problems. The energy retrofitting consisted of additional insulation, decreasing the buildings permeability through air sealing; window and door replacements. When a building is equipped with natural ventilation it is difficult to know its precise performance and how an energy retrofitting affects it.
Café/Restaurang på Uddevalla Skeppsviken
This report deals with activities that from a CSR perspective are considered to create a shared value for a medium-sized construction company in Sweden. The CSR definition used in the report is the European Commission?s since it reflects the valuecreating aspects of CSR, in contrast to the traditional philanthropic aspect of CSR.Companies in the building construction industry have difficulties identifying activities that create value in society and in the company. The aim with the project is to, from a CSR perspective, identify and evaluate value creating activities in a building construction company. The activities will be evaluated with respect to competitiveness and how they can be implemented into an organization.
Slusseneländet
Stockholm is constantly growing and changing. Despite this, for various reasons, it is difficult to execute large building projects. With starting-point in decision making theories we have tried to investigate these difficulties. More specifically we have chosen to study why it has not been possible to rebuilt Slussen in Stockholm. To help us structure our study we have based our research on another large comparable building project, the Globen City project.
Energikrav i upphandling av bygg- och anläggningsprojekt
The building and plant sectors represent a large part of Sweden?s energy use. Putting energy requirements in public procurement as a tool for reducing energy consumption in the building and plant sectors is therefor an opportunity that operators can take advantage of. The aim of this thesis was to map the energy requirements in procurement that operators in the public sector use today in building and plant projects. The analysis was made with respect to if the energy requirements corresponded to the parts with large energy use in building and plant projects and also in which way energy requirements in procurement are written in the contract.
Värdefull eller värdelös? - Kulturhistorisk värdering och färjestationen i Helsingborg
This essay in historical archaeology deals with cultural-historical values of buildings and inthis case the old train- and ferrystation in Helsingborg. The building has from the day of itsopening in 1898 been exposed to threats of demolition since its original purpose was as atemporary building with intension of being replaced within a couple of years. After havingseen two World Wars, eventhough Sweden never participated, and the ferrytraffic with its upsand downs the station was an important part of Helsingborg. All the ferrytraffic over the straitto Denmark was handeled by the old train- and ferrystation untill 1955, when a competativeferrycompany was built close to the old station. After a hundred years of service the oldstation was closed down when a new station was built i Helsingborg in 1991 with theintension of gathering all travelers in one building.
Kontroll för ökad kvalitet - mallar för kontrollplan-PBL, egenkontroll samt riskanalys
There are problems with poor quality, poor scheduling and poor working climate in the Swedish construction industry. Many parts have been involved, trying to solve the problem.This spring a new planning and building-law becomes final. In this law, the requirements set on the controls are greater. Hopefully this will lead to fewer construction errors. The requirements set on the working environment have also increased, forcing consultants and contractors to focus on safe workplaces.For each project requiring a building permit, an inspection plan has to been drawn.
Lastkupan på stallet i Österäng - ett rekonstruktionsförfarande
Uppsats för avläggande av filosofie kandidatexamen i Kulturvård, Bygghantverk, 27 hp, 2010.
Förbättring av Egenvärmehus : En fallstudie av ett flerbostadshus, Kv. Fyrtornet
Energy efficiency has become a very topical issue that has been discussed throughout the European Union for preventing negative environmental impacts that have been associated with the consumption of energy. In the residential sector have mainly municipalities set strict requirements for the reduction of energy consumption while the renewable energy has been asked. Different concepts of low-energy buildings have been developed to reduce the cost of operation and maintenance in existing buildings such as in new ones.This thesis has aimed to minimize the energy cost of a large building which has had low energy consumption features originally. Energy reviews has been initiated in order to be able for showing how the house electricity could be carried out even more efficiently.The work was initiated through a literature study to clearly increase the reliability on the energy subject. Different concepts of low-energy buildings have been treated in connection with its specifications, afterward those have been compared with the obtained results.
Optimering av fackverksmodellering : Ett makro för Tekla Structures
This project is the result of a cooperation between HalmstadUniversity and EABAB. The aim of the project was to create a macro that would help EABAB automate the process of designing steel trusses. When run in Microsoft Excel, the macro imports and processes coordinates from a calculator program. The data is then imported into the Building Information Modelling software Tekla Structures, which creates a 3D structural model of the steel truss.The macro saves much time in the project planning process and also helps minimize the risk of design flaws caused by human error. .
Uttorkning av lera : Orsaker och följder
When building a house or similar the stress on the ground increases and deformations can arise. The deformations create a foundation that the building is not constructed for and damages on the building arise. The increased stress on the ground can be derived back to the building, but it is possible that the increased stress may well derive from different sources such as other buildings or trees. The building is an older property, built in the late 19th century alternatively early 20th century, and is today used for rental housing and has suffered severe damages due to subsidence. The goal of the thesis is to find possible causes for these subsidences. The thesis was executed as a combination between literature- and casestudie. After careful studies it has been found that a probable cause for these subsidences is trees. Through field- and lab studies it has been found that the trees has effected the ground through there accumulation of water.
O?verla?mnandet inom byggarbetsmiljo?samordning : Riktlinjer och konsekvenser
The concept of building work environment co- ordinator is a relatively new concept that has its origin in the amendment to the Working Environment Act which came into force on 1 January 2009. The terms; building work environment co-ordinator appointed for planning and design and building work environment co-ordinator for the execution of building or civil engineering work ushered in the industry. Once these disciplines complement one another, you can achieve a smooth handover to ensure a good and healthy working environment.In this thesis, we study a company in Uppsala and their operations and handover by interviewing the relevant staff in question. The result shows that there are currently no present guidelines for how and when the handover should take place, it is up to each individual to provide themselves with the relevant information.If the handover of the work environment would occur to the extent it should it would lead to minimized proportions of unforeseen risks and events that may occur during the production phase, which ultimately leads to a better and healthier working environment..
Arboga Mekaniska Verkstad : Förslag på saneringsåtgärder gällande gjuteriet och plåtverkstaden
The industrialization in Sweden has increased the large number of areas that have been contaminated with various types of pollution. One of those sites are the property Höjen 3:24 in Arboga where ?Arboga Mekaniska Verkstad? once been. The property wants to increase the use of the old former foundry building with the adjacent ?plate-workshop? and believe there are two options for the building: That the building either should be used as a warehouse/concert hall, or rebuilt into a cultural center. An environmental evaluation has shown that the levels of heavy metals are over the Swedish environmental protection agency guidelines of less sensitive land.
Glastaket : ett bärande klimatskal
This candidate.?s work includes designing of a house with it.?s structural components andinstallations. The house had to be actual with Building Regulations (Boverkets Byggregler).Beside designing of all the crucial systems necessary for completing of claimed regulations evenan optional topic within building engineering had to be chosen.The task included designing of heating, ventilation, sanitation and electricity systems. Structuralengineering models has been made in compliance with Eurocodes. Materials for facades, floorsand roof were chosen and evaluated.As recessed portion of the work, evaluating of possibilities in designing of a glass roof waschosen.