Sök:

Sökresultat:

5519 Uppsatser om Building methods - Sida 6 av 368

Ur led är tiden: En studie av metoder att korta ledtider inom forskning och utveckling

Product development cycles become shorter and shorter. The time from idea to market has become an important competitive factor. Despite this, methods used for making the product development process faster are surrounded with uncertainty about their efficiency. The purpose of the thesis is to describe the pros and cons of ?best practice? methods for shortening lead times and how these methods effect the lead times in research and development.

Nyutveckling av bakdörrar vid Sapa Building System AB

Sapa är en av de största tillverkarna i världen av aluminiumprofiler. Sapa Building System AB är ett dotterbolag till Sapa group och är en av de största leverantörerna i Europa på byggsystem. Några av deras produkter är bakdörrarna RD 3010 och RD 3020 för lastbilar, släp och trailers som från början var ämnade som sidodörrar. Som bakdörrar är de överdimensionerade då sidodörrar hade högre hållfasthetskrav. I dagens läge väger och kostar de mer än nödvändigt där av önskar Sapa Building System AB en nyutveckling av bakdörrarna.Målet är att omkonstruera bakdörrarna RD 3010 och RD 3020 så att de blir lättare, smidigare och billigare genom att konstruera en ny kantskoning till Sapa Building System AB:s befintliga aluminiumlämprofiler.Arbetet har resulterat i att ritningsunderlag för nya profiler har tagits fram där man valt att limma ihop dörrarnas delar istället för att nita.

Företagsstudie om värmeöverföring : Beskrivning av värmeflöden hos en lagerbyggnad

The study took place at a food corporation in Växjö, Sweden. It describes a building that contains four tanks in which glucose syrup is stored. The purpose of the study was to calculate the amount of heat that leaves the building and the amount of heat that is supplied by the installed heating equipment. Before the calculations could be implemented, all the systems that supply the building with heat had to be examined. With a small amount of information from earlier studies, the work to gather all the data necessary for the calculations began.

Lufttäta byggnader

The viscosity of air buildings is a hot topic within the construction performers, which the industry feel they have too little knowledge about. This study is mainly aimed against air density in apartment buildings and airflow measurement. The study consists of a theoretical reference, educational visit, interviews and a survey conducted among construction workers at Magistratshagen in Linkoping.Earlier requirement in terms of air leakage through the climate screen was removed and today there are only energy requirement for a dwelling in Boverkets Building Regulations. The difference between a passive and a typical air tight construction is that the passive house have a maximum requirement of 0.3 l /s m2 of air leakage through the building climate screen. The requirement imposed on passive houses is to minimize the supply of power and energy for heating the building.Air tight constructions have heavy demands on the performance and accuracy of everyone involved with the project. The client must specify their requirements and also be prepared to pay for any additional costs. The architect and building planners have to design the building with regard to air tightness. Finally, the construction workers are required to do a careful work in order to get all the connections in the building air tight.The study suggests that an air tight building is a closed system where no forced ventilation exists. There are no reasons not to build too tight as long as there is a functioning ventilation. In this study the authors ask themselves how an air tight building changes over time. No theoretical information has been found on these changes, but the respondents assume that air density decreases with time. The deterioration is mainly assumed to be caused by construction materials changes over time. The study shows that construction workers knowledge of air tight construction is mixed, which they themselves admit in the survey..

Mer hyresrätter åt folket! En studie om Hallands hyresbostadsmarknad. : - Att skapa lönsamhet för hyresrätter

A variety of demands have to be considered in the design of a new opera house in Galärvarvet. All possible viewpoints are important to be aware of, as is the need for the new building to be a contrast to the already existing opera house in Stockholm. The restricted site also makes a multitude of demands on the building's design.By rationalizing the layout and structure and also by making the footprint smaller, the complex building of over 30 000 square meters can be fitted and blended into the existing physical context. Unlike the existing opera house in Stockholm, the new opera house shows the rationality and the advanced technology that lies behind the scenes and becomes the character of the entire building. Through the dynamic façade, the new opera can convey any character it so desires, just like scenes do through different settings.

Byggnadsminnesförklaring : ett långsiktig hållbart skydd?

There are currently 2160 buildings in Sweden that are protected by law with the designation as a cultural heritage building, which is the strongest protection that can be obtained for a building of cultural historic significance. The purpose of this thesis is to research how strong and sustainable the protection of such a designation is and how you can motivate a revocation. Furthermore, this thesis aims to give an overall insight into all cases where there has been a revocation.To achieve the protection of a designation as a cultural heritage building, the object has to be of outstanding interest on account of its cultural historic value. In the first part, this thesis gives a short historic background of the cultural heritage law and its terms, like outstanding interest and cultural historic value. The County Administrative Board's documents about revocation are the main source for this research.There have been 24 cases of revocation and the frequency of such cases has increased in the past ten years.

Utökad samverkan med leverantörer : - Partnering, en lönsam möjlighet i byggindustrin?

The construction industry has been heavily criticized in the past few years for its development of productivity compared to the manufacturing industry. In 2009 the Social Care Center developed a report that treated och criticized different errors within the construction industry. For instance competence, construction errors and performance had showned bad results which had to be improved. A common sentence within the building industry is that ?every project is unique?. Today it?s common for a construction company to have costs for material and services which exceeds two-thirds of the total cost.

Jämförelsestudier av Takkonstruktioner med Stora Spännvidder

The purpose of this report is to examine various roof structures that can operate in a warehouse with large spans. The building that is examined in the report is currently under construction, and the roof construction has already been selected. The selected roof system will therefore be compared with some other structures and materials that have been possible. The report will evaluate three different frame materials, two insulating barriers and two overlaying materials. Another important part in major construction projects is the roof safety.

Energiåtgång under tillverkning och produktion av byggnadskomponenter

This diploma work addresses the question of how much energy is spent whenmanufacturing the components of a building as well as of how much energy is used inthe production of a building. The object of the studies is BioCentrum at the SwedishUniversity of Agricultural Sciences in Ultuna just outside the city of Uppsala. The aimof the work was to investigate how much energy was consumed when manufacturingand production in relation to the management, how many years the production wasrepresented. It was also a study in how mature the construction industry is to answerhow much energy was consumed in manufacturing.In order to get these answers a question form was developed and sent to thesuppliers to BioCentrum. In this form they were to respond to the quantity suppliedto BioCentrum and the amount of energy was spent when manufacturing thecomponents.

Energi och klimatanalys O-huset på Campus i Halmstad

AbstractThe indoor environment affects the human performance. Noise pollution, poor lightning and coloring are some of the factors that affect our work performance. The human is also affected by the air change and temperature, these factors are in most buildings possible to adjust and through this make economic savings. To find out about the indoor environment in the O-building a questionnaire was handed out, measurements/surveys and an interview was also made. 108 questionnaires where handed out to employees and students.

Hotell- Stockholms skärgård

The hotel is located on Skatholmen in the archipelago of Stockholm, Värmdö county. The hotel building has an open structure characterized by hospitality and the nature outside. The rooms have stunning views of the island landscape and lush forest. With biodiversity and valuable nature in mind, the building has been designed with a structure that should not be too intrusive in the surrounding landscape. The building is meant to blend into the dark silhouette of the island and to give a light footprint on the topography of the landscape.The use of well-chosen materials and similar design, both in plan and facade, creates a consistent building despite the building's somewhat playful expression.

Högt hus i Chongqing/Kina - ett bostadsprojekt

This is a project showing a proposal on how a high-rise building gains qualities similar to middle rise houses of 7-9 stories. The closed, isolated and often anonymous life in the high building opens up through gardens. The resident meet the outdoor environment on the balcony, or has direct access to a garden.Instead of moving in a closed core, the resident will meet the climate and outdoor conditions as soon as he or she leaves the apartment.The project consists of two parts, where the first is presenting a building proposal, the second is expanding the knowledge through background research. The topics are history concerning the skyscraper and the skyscraper globally, closing up with the situation in China..

Åtgärdsförslag och känslighetsanalys vid energieffektivisering ur ett fuktsäkert perspektiv : En fallstudie på timmerhuset Sofiedals herrgård

This thesis investigated the possibilities to resume cultivation of an old manor house built of timber and what this would mean from an energy and moisture perspective. The building in this case study is named Sofiedals mansion and was built in 1858 in Valbo 11 kilometers west of Gävle.The structure of the house was documented and used as a starting-point for carrying out calculations focused on energy and moisture aspects. With the help of a number of computer programs and a conducted air tightness test, the buildings energy consumption were calculated and compared with the current building regulations.In addition, the building was analyzed considering energy retrofitting and what it meant for moisture problems. The energy retrofitting consisted of additional insulation, decreasing the buildings permeability through air sealing; window and door replacements. When a building is equipped with natural ventilation it is difficult to know its precise performance and how an energy retrofitting affects it.

Språkinlärning och Språkutveckling : I en förberedelseklass i högstadiet

Then the language learning process and the approach in a preparatory class differs itself from a general class. The methods conducted in a preparatory class are not just focused on teaching as in a more traditional method. Achieving the objectives in a preparatory class depends on the individual student and the cohesion in the group. Students have different backgrounds and knowledge level, therefore it is extremely important that the teachers use different work methods in order to achieve and to promote the students' language development. The aim with this survey is to get the knowledge about what education methods is being used by teachers in a preparatory class.

IMPLEMENTERING AV ARBETSMILJÖLAGENS ÄNDRINGAR, GÄLLANDE FRÅN 090101, PÅ BYGGARBETSPLATSER

In the EU there are EC Directives that Member States of EU should follow. Sweden has undertaken to transpose EC Directives regarding the working environment to Swedish Provisions.  In 4 April 2006, the European Commission had some criticism against the Swedish implementation of the Construction Sites Directive. The Swedish Work Environment Authority has in response to this criticism reworked the Work Environment Act and related provision about building and civil engineering work. The changes came into force 1 January 2009.These changes have resulted in some working methods and even new responsibility subjects must be reviewed. The purpose of this exam project was to investigate if contractors and clients in the construction sector, had have time to update themselves on this front and adapt to these changes.

<- Föregående sida 6 Nästa sida ->