Sökresultat:
9839 Uppsatser om Building maintenance process - Sida 7 av 656
Off-Shore Blackboxing & Global Software Development : En studie av utmaningar och möjligheter med distribuerad systemförvaltning
Global Software Development (GSD) is based on a geographical distance where teams are spread throughout the world. The related research have for a long time addressed the challenges presented by geographical distances. GSD is basically a necessity for many businesses to use in order to reduce development costs, reduce production time and to maintain high quality. The study aims to investigate the relationship between the reality of a specific maintenance project. Thus, our research question: How do distributed maintenance teams experience temporal, geographical and socio-cultural distances? To achieve the purpose of the study, we chose to perform a case study of a global consulting company which recently started a new system maintenance project.
Den mobila prefabriceringsfabriken : Ett nytt produktionskoncept
This is an investigation of a mobile prefabrication factory´s competitiveness and profitability which also will result in a suggestion for a design of the factory. The mobile prefabrication factory is an idea of a new concept for production which is meant to be used in the manufacture of slab. The main intention with this concept is that by using a fast established prefabrication factory to produce elements near the construction site, thus avoiding transport from the factory to the building site. This means not only an environmental and economic gain, but also that you can avoid risking damage the elements which often occur during transportation. The contractor is owner of the mobile prefabrication factory and can thus avoid long waiting times and cyclicality.
Demokrati, diktatur eller demokratur? : En kvalitativ studie av den demokratiska tillbakagången i Vitryssland
This is a study about the transition process and the consolidation of power in Belarus. In this paper the concept of "authoritarian state building and the sources of regime competitiveness in the fourth wave" is the major theory used. After giving a description of the theory?s concepts a short historical background of Belarus follows. Chapters four describes and explain the political situation in Belarus during five periods.
Underlag för en kommande rivning av J-huset på Akademiska sjukhuset i Uppsala : Generell planeringshjälp vid utförande av rivning
This report is about planning a demolition. The purpose of this report is that it should become a base for a demolition of house J at the Academic hospital in Uppsala, and also to make general help for planning a demolition. This report also contains a part about how a change in the work environment affects general people. The work started with studies of literature and design of the general part of the report and then continued with a practical study of house J. From the experience of the first two parts of the report a general help for planning a demolition was shaped.
Rätt fönster i olika väderstreck : En undersökning av energieffektiva fönsters påverkan på byggnaders energiprestanda
The Swedish building stock accounts for nearly 40 percent of the total energyconsumption in the country. Properties built today are likely to last for 100 years orlonger. This places high demands on long-term and smart energy solutions that willkeep the future Swedish building stock energy consumption at low levels. This thesishas focused on examining how the energy performance of buildings is affected bydifferent choices of window types in different cardinal directions. The objective wasto obtain a basis for recommendations on how window properties can be optimizedfor different types of buildings and orientations.
Genomgång av A-checkupplägg till Dash 8 Q400
In this report I summarize the thesis, which is about to check what will happen if you decide to increase the interval between the a-checks, carried out on the Norwegian airline Widerøe. They want to know if an increase in time between the checks can give them an opportunity of increasing their aircraft fleet. In the current situation Widerøe has 11 Dash 8 Q400 and can consider a possible increase of 3 planes. This would be done without the need to increase accessibility of the hangars and increase in staff.What determines how often a check is performed is the maintenance tasks which has the shortest maintenance interval. On the Dash 8 the shortest interval is 600 flight hours.
Granskning av Solibri Model Checker - En Svenskanpassning : Ja?mfo?relse av tva? egenkontrollsystem
The building industry are currently going through a huge alteration. The introduction of BIM (Building Information Modeling). Which also implements a lot of new ways of solving problems that building modeling can cause. This report is written for Uppsala University in cooperation with Temagruppen in Uppsala. However, it contains a comparison between two different systems that checks building models.
Valmöjligheter i samband med prefabricerade badrum
This report deals with prefabricated bathrooms and the advantage, during the production process, they have compared to ordinary produced bathrooms.The work is done together with the building company JM. The common task is to investigate if the manufactures, in spite of standardized design can meet the concept of JM, i.e. high flexibility and adjustment towards the customer. In JM they are doubtful to the method, as they did not yet worked with prefabricated modules and think that the choises for the costumer will be limited.There will be a short resume of the progress of the bathrooms and its importance as sanitary and wellbeing.The recent problems with damage caused by damp in bathrooms. Have resultade in regulations.
Vilka strategier och metoder kan vara användbara för en hållbar viktnedgång?
The purpose of the study was to examine what methods and strategies individuals use to maintain their weight loss. Another aim was to explore which factors can complicate or simplify weight loss maintenance. Fifty-four individuals who had maintained their weight loss more than a year, participated by answering a questionnaire. The questionnaire was constructed and distributed through the internet. The answers were registered in the program google docs. The participants mentioned successful methods and strategies, such as exercising regularly, the majority exercised 30 minutes at least five times per week.
Uppstart av Totalt Produktivt Underhåll på Tour & Andersson AB
In order to continue to be competitive in the current industrial climate, producers must increase efficiency at their plants. Several Swedish companies choose to utilise the principles of Lean production. Tour & Andersson AB (TA) has elected to create their own model using Toyota?s productions system which has been named TAPS (Tour & Andersson Production System). Following two years of working with TAPS the company has decided to introduce Total Productive Maintenance (TPM).
Most of the work carried out in the maintenance department today is in form of repairs to already faulty equipment.
Effekter av nya PBL : En studie av processen från handläggning av bygglovsansökan till slutbesked
It has now passed two years since the new site- and construction law, PBL, went into force. It replaced the previous PBL applicable since 1987, and it involves relatively large changes in many different areas of the construction sector. The ambitions of the new law are for instance to simplify and clarify the legal text, increase efficiency in the permitting processes and improve the quality of construction. To achieve this, a variety of changes was made. Some of the most important are: inserted deadline in the processing of building applications, extended assessment of building applications, revised rules about controlplan and quality manager, a certificate is required to start and end the project, an additional meeting is inserted and the construction management of the municipalities will have to do a mandatory visit at the work scene.
Effektivisering av bygglovsprocessen. En kundundersökning i Göteborg
Bygglovsprocessen är en vital del i den totala byggprocessen eftersom ett bygglov är nödvändigt i nästan alla fall av nybyggnation och större renoveringar. I dagens samhälle där byggprocessen är under utveckling och allt större tidspress finns så är bygglovsprocessen ofta en flaskhals innan bygget kan påbörjas. Därför behöver bygglovsprocessen utvecklas för att bli effektivare.Syftet med denna undersökning att utreda vad tidigare kunder hos Stadsbyggnadskontoret (SBK) Göteborg anser om bygglovshanteringen. Utifrån de resultat som erhålls presenteras vilka delar i bygglovsprocessen som kan förbättras och effektiviseras. Dessutom ges förslag på förändringar för att uppnå detta.Kundundersökningen genomfördes med en enkät som skickades ut via e-post till kunder som fått godkänt bygglov i februari 2014.
Fuktproblem i sydöstra Asien
The author has, with the help of AK Consultancy Indoor Air AB, formed a series of questions regarding moisture problems in buildings and how these are handled in extreme climates with high temperatures and a high relative humidity. Furthermore to analyse and indentify key material that makes a construction safe against moisture problems. Ventilation, AC and the choice of materials have in a later stage of the thesis been investigated to enhance the knowledge of moisture protection. The research for this report includes measurements on existing buildings, calculation models on the building envelope for analyses and the ingoing materials of the envelope. The health aspect of moisture problems related to ?sick building syndrome? has been included and interviews have been conducted to gather relevant information.A study of the American system, ASHRAE, American Society of Heating, Refrigeration and Air Conditioning Engineers and the standards used in Singapore has been made to highlight the difference.
Teststrategier och användning av testautomation : En studie utförd på företaget Extenda AB
In today?s IT world where software is constructed in a rapid pace, testing has become a crucial area to master when testing has to be done at a greater speed. To still be able to handle the demands of high quality software, companies have to spend more resources on testing and introduce test automation. By automating test cases the testers can gain time which they can spend on doing more complex testing and thereby increase the quality of the software.In this thesis we have helped Extenda AB, who delivers systems to retail companies, to introduce test automation in one of their customer specific projects. This has been done using their own in-house ?capture/replay? tool ECP (Extenda Cashier Player).We have also derived a process that explains how Extenda can introduce test automation on other customer projects.
Logistikfastigheter i Stockholms län - En analys av värdeinverkande faktorer
In this report a study is carried out with the aim to identify added values of EPC projects implemented in schools in order to increase the interest of EPC projects on the market. The report examines how the planned maintenance, supervision, maintenance and corrective maintenance is affected, how insurance premiums and terms are affected, the indoor environment and how the tasks of the operating staff is changing. A literature study of energy savings, energy use in schools, maintenance and insurance as well as how energy efficiency improvements are related to the Swedish environmental objectives has been made. Visits were carried out in Ludvika, interviews were also carried out with operation technicians and local strategists in Ludvika as well as employees of insurance companies.Schools often have neglected maintenance and problems with ventilation and indoor environment. Schools also have a large energy saving potential due to their low utilization, mainly because they are empty parts of the year.