Erfarenheter från flerbostadshus som passivhus : En handflata och sex värmeljus

All new households were to be constructed with "near zero energy house standards" (NZE-house) by the year of 2020. The ambition to construct energy-efficient buildings had to increase rapidly in the spring of 2013.The purpose of this report was to increase the interest for building contractors to construct apartment buildings with passive house standards. By locating and evaluating experiences from an existing passive house a case study including interviews, field visits and document analysis was made. Research of literature regarding other passive houses in Sweden also helped to answer the following questions:- What positive and negative experiences have the study of the passive house meant to the involved stakeholders and residents?- What improvements can be made based on identified experiences?- How can an apartment building be designed as a passive house based on possible improvements?By collecting good and bad experiences, as well as improvements and potential design proposals, a diagram was created designed as a tool for developers when constructing apartment buildings with passive house standards.

Är det ett varande eller ett görande förhållningssätt som har betydelse för att må och fungera bättre?

Abstract Integrated mental training is a method that entails a systematic and long-term training of mental processes (thoughts, images, emotions) that aims to enhance performance as well as gratify feelings and improve thought processes. This training develops an alternative system of control by using substitute state of consciousness and self-hypnosis. The method is concerned with both mindfulness and performance approaches, which is crucial in order to feel and function better. The intent of this study is to highlight the experience of the different steps of integrated mental training to gain an understanding of how, where, and when changes occur. To achieve the objective of this study, a qualitative empirical method was used.

Vertikala Trädgårdar : ett grönt verktyg i planeringen av framtida urbana miljöer

In present time, more and more people move into cities. Densification of cities as planning policy together with an intensive urbanization, makes urban planners face with the contradictory task of creating a city that is both dense and green. Façade vegetation has been used for centuries, mainly in the form of various climbing plants that with or without supportive structures have spread over facades to give a green impression to the environment. The development of new technology today allows urban planners to use greenery integrated with façades. Vertical gardens offer a larger variety of plants, and at the same time takes advantage of the technological benefits of vegetation in city planning.

Geoenergilösning för DN-huset

In this thesis proposals for different designs of a borehole thermal energy storage (BTES) have been developed for the building DN-huset in Stockholm, Sweden. To build a BTES results in savings in energy costs by approximately 44 %, i.e. 2 million Swedish crowns annually. Furthermore, a BTES would reduce the annual environmental impact with roughly 75-157 tonnes of CO2 equivalents per year, depending on how the electricity consumption?s environmental impact is estimated.

Optimeringsflöde av modelleringsprogram vid broprojektering : Analys av de tre modelleringsprogrammen Tekla Structures, Revit 2013 och Rhinoceros

This thesis treats Building Information Modeling, BIM, in the production stage. Brieflydescribed BIM is virtual model of a building object where all information about theobject is gathered. All the involved operators in the construction project have access tothe model and can gather or share information about the project. There are several waysto apply BIM in the production stage. This thesis primarily deals with visualization of theobject, preparation and planning, the ability to take amounts from the model andcoordination and clash control.The basic issue was highlighted by Byggdialog AB.

Konsekvenser av energimodellerad arkitektur

The interest in building low energy houses has increased along with the rising engagement inthe climate questions. With the advancing energy prices it is highly suitably for those whobuild and administer their buildings in long-term to build energy-saving houses. 40 % ofSweden?s total energy consumption constitutes of the energy in residences, therefore it iscrucial to take advantage of all the free energy as we possibly can. With crucial questions likequality of living and profit low energy building is a subject that concerns us all.Three proposals for apartment blocks are presented in this work on a real estate in Stockholm.Each proposal is developed through unique processes of design with the purpose to displaypossibilities to deal with the energy requirements of today and tomorrow through energybased architecture.The first proposal is an apartment block based on a traditional design process, the demands ofthe property owner and it?s affected by opinions from architects.

Att arbeta med komplexa problem : En kvalitativ studie av hur föreståndare på HVB för ungdomar beskriver sitt arbete.

The essay is about how immigrant pupils are integrated into the Swedish school and society. I have studied how teachers work with integrating these pupils and if there is a plan of act used in their work. The essay is also about how social relations can be used as a pedagogical resource by the teachers when the institutional framework and support is failing..

FRISTADS ? Supply Chains, från tråd till arbetsbyxa

The Swedish Textile industry has since the beginning of the 70-ties moved their production to countries with cheap labour further and further away. The production in the Baltic countries and Asia has become reality for many Swedish manufacturing companies. With today?s technology the communication with remote countries has ceased to be a problem. The difficulties have instead turned out to be more focused on transportation of goods and just in time deliveries to Sweden.

Framtagande av OEE-mall

At Volvo Cars Torslanda's paint shop there is a requirement to in a fast and effective way get an overview of the plants capacity. Therefore a capacity template was constructed as a tool for the engineers at Volvo several years ago. This template has during the years become complicated and outdated. Thus this thesis work will resort as a new capacity template, built from scratch. The new template has been built up based on requirements from Volvo and the concept of OEE (Overall Equipment Effectiveness).

MOLNU : Att utveckla ett gemensamt gränssnitt

Climate and environmental issues is now high on the agenda. We live in a generation that must try to solve some major environmental problems. Buildings and habitations account for approximately 40 % of Sweden's total energy today. To reduce this figure, as needed, more research in the field of energy efficiency is required.This thesis concerns the heating of buildings. The load on district heating is heavy during certain times of the day.

Upprättande av mall för fuktsäkerhetsbeskrivning : Genom granskning av projekt ur fuktsäkerhetssynpunkt

During the 1990?s a large number of building projects were revealed where lack of moistsafety precautions during the construction process had led to extensive moisture damage. Alsoresent implemented studies have shown that the problems with moisture damages have ratherincreased than decreased during the past few years. Moist is considered to be one of the mainfactors to cause unhealth due to deficiencies in the indoor-environment and does also causeunnecessary expenses and a reduction of the confidence in the construction industry.In this Bachelor of Science thesis three projects have been reviewed to examine how moistsafetyhas been observed during the construction process. Main focus has been to identify thebuilding components that are the most exposed to moist, and to examine how they have beentaken into account during the period of design and construction.

Varumärkesbyggande inom småföretag: en fallstudie om hur småföretag skapar värde genom sitt företagsnamn

This thesis intended to examine how small enterprises within the retail industry work with brand building of their corporate name. More specifically it intended to examine how they do to choose corporate name and corporate logotype, and how they work to create a desired corporate image. A case-study was performed with three case-companies from different industries. The method was deductive as the empirics were brought in with starting-point in the theoretical frame of reference. The study showed that there are differences in the way small enterprises within the retail industry work with the brand-building of their corporate name.

?Vård i annans hem? - användning av arbetsmaterialet i Huddinge kommuns hemtjänst/boendestöd och personlig assistans

AbstractThe importance of good construction planning affects the final costs of the production and the timing of the project. Planning for building projects has been studied with the aim of identifying how three week planning appears in the construction industry today.A case study has been conducted in Navisworks Simulate to assess whether the software is suitable to connect the task schedule with the BIM model to create a 4D model. 4D models are used for performing 4D construction simulation to visualize the project. In order to use the benefits of the model, investment in equipment and software is required. This means higher costs for the companies.

Byggnads- och investeringskostnader : Robotmjölkning eller konventionell mjölkning?

This project is based on my fathers farm which lays outside Löberöd, twenty kilometres south of Eslöv in Skåne. While my family for some time have thought about building a new milkingstable with AMS(Automatic milking system) I decided to compare the AMS with a conventional milkingstable. We are abit concerned about how many cows we should have in the new stable. Because of that I calculated with two different number of cows. I have compared three different types of milking stables: One alternative is 180 cows milked in a double eigth hearing bone milking stable. The second alternative is 128 cows milked with two DeLaval VMS-robots. The third alternative is 171 cows milked with three DeLaval VMS-robots. One salesman from DeLaval and one salesman from A-betong helped me to get marketprices on the milkingrobots, building, ventilation and prices on all the concrete. In all the costs labour is included. The rest of the costs are calculated in a softwareprogram called K-data 03 which is a program with predicted costs. The calulations from the program showed that the price in the milkingpit system was 51 000 sek per cow.

Energianalys av hygieniseringssystem : jämförelse av befintlig pastörisering med integrerad termofil hygienisering på Kungsängens gårds biogasanläggning i Uppsala

The biogas plant Kungsängens gård, owned by Uppsala Vatten och Avfall AB, produces biogas and biomanure from organic household waste, food processing waste and slaughterhouse waste. In year 2012, 4.4 million Nm3 of biogas were produced from 25 200 tons of waste. Before digestion all substrate is sanitized by pasteurization at 70°C in order to kill pathogens. Another method, integrated thermophilic sanitation (ITS), is of interest in order to decrease the energy demand. The method implies that the substrate is sanitized during ten hours in the digestion chamber, where the temperature is 52°C.