Sök:

Sökresultat:

18915 Uppsatser om Building information modelling - Sida 3 av 1261

Utvärdering och åtgärdsförslag av energianvändning i kontorsbyggnad

AbstractEmbla 5 is an office building which has done a large improvement. The clients of this building has made an order of WSP and the student Anders Kempe to calculate the use of energy for the building, and after that result proposing further measures which can decrease the energy use of Embla 5.The ground for this report is when calculation of the present energy use of the building is stated. To make that information of a number of parameters such as envelope, the heating system and ventilation has been located and set in to the simulation program IDA ICE which calculate the energy use.To improve the energy use further this project has been concentrated to change the system of ventilation. Today the ventilation system is of the kind CAV (constant air volume) and the air flow is dimensioned for after recommendations from BBR and Arbetsmiljöverket in the office spaces. Consider that Embla 5  is an office building where the people only staying for 8-10 hours/day so was the ide to see how much energy saving if the air flow is reduced the time people not being in the building.

Energiåtgång under tillverkning och produktion av byggnadskomponenter

This diploma work addresses the question of how much energy is spent whenmanufacturing the components of a building as well as of how much energy is used inthe production of a building. The object of the studies is BioCentrum at the SwedishUniversity of Agricultural Sciences in Ultuna just outside the city of Uppsala. The aimof the work was to investigate how much energy was consumed when manufacturingand production in relation to the management, how many years the production wasrepresented. It was also a study in how mature the construction industry is to answerhow much energy was consumed in manufacturing.In order to get these answers a question form was developed and sent to thesuppliers to BioCentrum. In this form they were to respond to the quantity suppliedto BioCentrum and the amount of energy was spent when manufacturing thecomponents.

En byggnads energibehov : En studie om energieffektivisering av en befintlig byggnad i södra Sverige

The purpose of the study was to investigate the use and losses of energy in an existing older building. Another purpose was also to look through various options for heating systems with renewable energy in the building. The aim was to reduce the use and losses of energy. The first step was to study the related electricity bills of the building and also perform measurements and calculations of the building envelope and ventilation. The next step was to find out the possible actions for energy saving by performing measurements and calculations.

Mandom, mod och morske män : Läraryrket ur ett genusperspektiv 1920?1960-tal

AbstractMaster thesis of one year in Business Administration, Swedish Business School at Örebro university,Marketing, HT 2011.Authors: Grunér, Linus and Malm, Ludwig Tutor:Pia Lindell Title:Brand building and creating relationships ? A study of a small business in the B2B market Keywords:Brand building, business relationships, SME, B2B. Problem:How does a small business in the B2B market work with brand building and creating relationships? What critical factors can be identified regarding the process of relationship-building and brand building within the context of a small business in the B2B market? Research objective:The purpose of this study is to use existing research to create understanding for how a company in the B2B market is working with relationship-building and brand building. The study also aims to identify any critical factors concerning the process of relationship-building and brand building.

Varumärkesbyggande och relationsskapande : En studie om ett litet företag på B2B-marknaden

AbstractMaster thesis of one year in Business Administration, Swedish Business School at Örebro university,Marketing, HT 2011.Authors: Grunér, Linus and Malm, Ludwig Tutor:Pia Lindell Title:Brand building and creating relationships ? A study of a small business in the B2B market Keywords:Brand building, business relationships, SME, B2B. Problem:How does a small business in the B2B market work with brand building and creating relationships? What critical factors can be identified regarding the process of relationship-building and brand building within the context of a small business in the B2B market? Research objective:The purpose of this study is to use existing research to create understanding for how a company in the B2B market is working with relationship-building and brand building. The study also aims to identify any critical factors concerning the process of relationship-building and brand building.

Viking center

My diploma thesis has focused on creating a proposal for a Viking center in Stockholm that meets the international interest. A building dedicated solely to the Viking heritage. My ambition has been to give the Viking center an architecture that can serve as scenography for its exhibitions and to give the visitors a feel for the Vikings that they have been craving.  A boat-shaped building in tribute to the Vikings boat building skills with curved stems of equal height that gives a familiar silhouette to the city.  A wood building constructed of curved beams and wood columns painted with tar..

En energieffektiv byggarbetsplats : En studie av Skanskas bostadsprojekt

The construction industry has demands on energy use in permanent buildings. How much energy that is permitted to use during the time the building is produced has no requirements. The purpose with this study is to learn how far Skanska has come with the work of making the building site more energy efficient.A literature study has been performed in the beginning of the study to survey what energy efficient arrangements that can be applied and how they operate. Using site visits and interviews the situations on the building sites have been studied as well as the energy efficient measure that are in use.Skanska has come a long way with the work of energy efficient building sites and they keep improving. They have improved half of their cabins so they use 50 % less energy.

Mean value modelling of a poppet valve EGR-system

Because of new emission and on board diagnostics legislations, heavy truck manufacturers are facing new challenges when it comes to improving the engines and the control software. Accurate and real time executable engine models are essential in this work. One successful way of lowering the NOx emissions is to use Exhaust Gas Recirculation (EGR). The objective of this thesis is to create a mean value model for Scania's next generation EGR system consisting of a poppet valve and a two stage cooler. The model will be used to extend an existing mean value engine model.

Lufttäta byggnader

The viscosity of air buildings is a hot topic within the construction performers, which the industry feel they have too little knowledge about. This study is mainly aimed against air density in apartment buildings and airflow measurement. The study consists of a theoretical reference, educational visit, interviews and a survey conducted among construction workers at Magistratshagen in Linkoping.Earlier requirement in terms of air leakage through the climate screen was removed and today there are only energy requirement for a dwelling in Boverkets Building Regulations. The difference between a passive and a typical air tight construction is that the passive house have a maximum requirement of 0.3 l /s m2 of air leakage through the building climate screen. The requirement imposed on passive houses is to minimize the supply of power and energy for heating the building.Air tight constructions have heavy demands on the performance and accuracy of everyone involved with the project. The client must specify their requirements and also be prepared to pay for any additional costs. The architect and building planners have to design the building with regard to air tightness. Finally, the construction workers are required to do a careful work in order to get all the connections in the building air tight.The study suggests that an air tight building is a closed system where no forced ventilation exists. There are no reasons not to build too tight as long as there is a functioning ventilation. In this study the authors ask themselves how an air tight building changes over time. No theoretical information has been found on these changes, but the respondents assume that air density decreases with time. The deterioration is mainly assumed to be caused by construction materials changes over time. The study shows that construction workers knowledge of air tight construction is mixed, which they themselves admit in the survey..

O?verla?mnandet inom byggarbetsmiljo?samordning : Riktlinjer och konsekvenser

The concept of building work environment co- ordinator is a relatively new concept that has its origin in the amendment to the Working Environment Act which came into force on 1 January 2009. The terms; building work environment co-ordinator appointed for planning and design and building work environment co-ordinator for the execution of building or civil engineering work ushered in the industry. Once these disciplines complement one another, you can achieve a smooth handover to ensure a good and healthy working environment.In this thesis, we study a company in Uppsala and their operations and handover by interviewing the relevant staff in question. The result shows that there are currently no present guidelines for how and when the handover should take place, it is up to each individual to provide themselves with the relevant information.If the handover of the work environment would occur to the extent it should it would lead to minimized proportions of unforeseen risks and events that may occur during the production phase, which ultimately leads to a better and healthier working environment..

BIM för landskapsarkitekter : virtuell design och kommunikation

The purpose of this thesis is to describe what Building Information Modeling, BIM, could mean for landscape architects, and also hopefully to make sense of the possibilities and problems of the system. BIM is about virtual design and is based on all consultancy groups in the design team modeling in 3D. Intelligent objects and metadata, such as price and material, are used. The project group has a common interchange format for simple sharing of information. To get an idea of how the situation with BIM for landscape architects looks like today, I collected information mostly through interviews.

BIM Building Information Model : Hinder & Drivkraft

The  construction  industry  is  a  costly  business  such  in  respect  of  capital  for  most construction defects which then require rework, tear down and rebuild again. This study is  meaningful  awareness  of  tools  that  can  reduce  this  best  through  communication  and information sharing between the parties.  The  construction  industry  is  known  as  temporary  projects  organizations,  where  the construction  project  consists  of  several  actors  who  have  to  communicate  and  share information  between  them  to  avoid  mistakes  later  in  the  build  time.  These  actors  are bounded together thus for the duration of the project, then broken when the project has reached its end. The challenge here is for these actors to apply a tool that can help and simplify communications, information sharing, and perhaps the most important aspect is to  create  a  routine  for  the  association  and  the  shattering  of  these  actors.  To  implement such  behavior  using  a  tool  such  as  BIM  in  the  industry  whose  size  perhaps  is indescribable may be a very hard task.  BIM (Building Information Model) could be seen as the solution to this problem because it  acts  as  a  portal  where  the  actors  involved  must  sign  in  and  communicate,  share information, and eventually create a behavior, a routine for this association and division of  the  actors  following  the  end  of  the  project.  The  technology  could  help  the  involved from  the  beginning  of  the  project,  already  in  the  model  stage,  break  down  and  prevent any construction barriers when the building has been placed in the works.


Green Building : Ett företags energieffektiviseringsarbete i ett byggprojekt samt de krav som ställs för att få byggnaden Green Building klassad.

The examination has been performed at Bjerking AB, which is an architectural and engineering company. Bjerking AB has the ambition to be a member of Green Building.The Green Building program developed in year 2005 by The European Commission, the program is an environmental system with the aim to improving energy efficiency within the sectors of non-residential buildings. The minimum requirements to participate the program are following: in new-built buildings the calculated energy consumption must be 25 % lower than the requirements in the BBR (Building regulations) and in refurbishment the reduction must be 25 % lower than before the optimization.The aim of this study has been to examine and review the company Bjerking AB's energy efficiency work in the project of building the school/kindergarten S:ta Maria Alsike, where the goal is to get this building Green Building classed. A description of requirements to become a member of the Green Building has also accomplished in the thesis.The methods performed in this study are literature review, searches on the Internet, studies on the project database for facts/values, calculation of energy consumption and interviews of members of the Green Building. The following issues have been dealt with in the report;-          Did the building in the project manage the requirement to achieve an   energy consumption that is 25% lower than the requirements in BBR?-          What technical measures/system was selected in the building?-          What kind of cooperation was the project based on?-          What is required for consultancy companies and real estate owners to become members of the Green Building?The study of the project and calculation of estimated energy consumption in the building, give the result 47 kWh/m2, year.

Planering och val av metod i byggprojekt

This report describes the construction process and the aspects that should be taken into consideration. It includes models of decision and how these can be used in practice. Planning of a building project is very important for a successful execution. This will be the foundation of problems that will occur during the production. In the planning process people with different positions, search for the best suitable building methods.

<- Föregående sida 3 Nästa sida ->