3130 Uppsatser om Building construction - Sida 6 av 209

Utvärdering av den bärande tegel- och betongstommen i en byggnad från år 1916

This Master thesis is about a postal- and telegraphic building in Eskilstuna, Sweden. The construction methods for the specific building and buildings in general from the same time are described. The purpose of the report is to describe the loads acting on the building and how it has been built and why it has been rebuilt during the years. After this, possibilities of reconstruction and adaptation for today?s demands can be evaluated.

Handledning vid framtagande av handlingar för Generalentreprenad

This term project addresses how to develop construction drawings for a general contract. The project contains supervision, including blue prints as support as needed.Apart from directions on how to carry out the actual work, the supervision also discusses regulations governing all construction drawings. The supervision is created as guide for similar projects.The construction drawings is a complete construction guide, hence it includes all construction drawings. In addition, a room description and a general description is included..

Avfallshantering på byggarbetsplatser : Potential för en miljöeffektiv avfallshantering

This thesis concerns waste management on construction sites and was conducted on behalf of ICA Fastigheter.Areas of concern:How can an environmentally-efficient waste management system on construction sites be defined? What potential exists for exploiting the waste resources that are generated?How can the waste management be optimised by reducing the quantity of waste and by optimal sorting?How can the client of a project influence the waste management?The purpose of the work was to investigate sustainable waste management in the building and construction sector and to highlight waste as a resource from an environmental and economic perspective.The aim of the work was to define an environmentally-efficient waste management system, to analyse the potential that exists in waste management and to draw up guidelines for optimal waste management.The method consisted of a literature study, two visits to construction sites and four interviews.An environmentally-efficient waste management system means that the waste is managed in the following order of priority:Prevention     Reuse  Recycling     Energy recoveryLandfill     The prevention of waste is an important area that has not been adequately explored by the building and construction industry. The quantities of waste could decrease with the implementation of measures such as ordering materials in the dimensions required, prefabricated components, logistics centres with Just-In-Time deliveries, less and improved packaging and less wrapping. The reuse of waste materials and temporary apparatus as well as the use of a return pallet system are examples of reuse that reduces the quantities of waste.In most cases the source sorting work is a matter of course and the proportion going to landfill is down at a low level. The source sorting can be optimised by sorting all materials that can be reused and recycled to use them as a resource.

3-D handlingar, GPS-styrning och VA-moduler- En ny metod för framtida anläggningsprojekt

Ground construction has to a large extent been dominated by traditional meth-ods during the last 50 years. Although the construction has been changed meanwhile innovations are not accepted. In collaboration with NCC Ltd Region South, I have examined a modern con-struction methodology that has been developed by NCC for future large pro-jects. The method is divided into two central phases. Phase 1 is? Single Pro-duction? which is a preliminary period for ground constructions to come.

Skiftarbete i byggindustrin och dess värde för aktieägarna

The foremost objective of business organizations is to generate value for shareholders and to opt for strategies which optimize it. Hence it is of key concern for business leaders to appreciate how operations best are run to maximize value creation. This study explores how financial theory can reveal the link between one particular business strategy and the corresponding effect on shareholder wealth. The question in focus is whether construction companies can enhance their value creation by implementing shift-work to increase the weekly production rate. The thesis particularly targets apartment block projects in Sweden and has the construction company Peab AB as primary object of study.

Funktionskontroll av stegljudsisolering vid konstnärligt campus i Umeå

This report's aim is that by field measurements determine the function of Aprobo soundproofing material dB2 for reducing impact sounds, the measurements is done in ?the school for fine art? in Umeå also known as ?konstnärligt campus building nine?. The construction technique is used in areas sensitive to impact sound between different floors in the building. The measurement?s is also to do a function control of the buildings sound quality compared to Swedish and European standard when it comes to air sound, impact sound and reverberation time .

Vad är verklig kostnad per koplats? :

Purpose There are almost infinite numbers of ways to build dairy farms in Sweden. When building a new free stall barn you have the possibility to affect both working environment and animal welfare for many years to come. The construction costs are influenced by which type of barn that is built and what functions it contains, for example one can predict that automatic milking systems are more expensive to integrate than milking parlours. But what is the real cost of today for the construction of free stall barns with milking centres and how is it affected by construction methods and functions? Is the labour time influenced by the building costs? These are some of the questions this report will try to answer.

Fuktsäkert byggande : Sjönära bostäder i Östra Hamnen i Västerås

Housing construction very close to the lake Mälaren has become very popular today. One potential problem with these houses is the influence of the sea climate. Unprotected buildings are affected by strong winds and precipitation. So for that reason, it is very important to make an accurate climate investigation and use it for decision-making during the planning of the new settlement.It is very important with a good moisture protection regarding pelting rain, that is the combination of wind and rain. This is more important for buildings close to a lake, as this location normally means a higher exposure to wind.

INDUSTRIALISERING AV FLERBOSTADSHUS

The construction process which is used today while constructing residential buildings has for along time remained unchanged. Unfortunately the development process has gone away frombecoming industrialized and instead most of the work is done at the construction site. In thisrespect this is a worse alternative because the project outcome will be more expensive and theconstruction time will be longer. Skanska?s vision is to have a process which is more like the oneused in small residential buildings which is fully industrialized.The constructing process for residential building involves more parties and therefore it becomesmore complicated.

Prefabricerade Passivhus

European Union has made a new decision that all new built houses by 2020 shallbe near-zero energy houses. Boverket?s definition of near-zero energy housesintends buildings with good energy performance in which a proportion of theamount of energy that must be added to the building is made of renewable energy.Passive House is a set of requirements from FEBY designed to build energyefficient buildings. This is achieved by reducing loss of heat through the buildingenvelope and to take advantage of the passive heat from solar radiation,installation and heat sources like people living in the house.This project has been made with help of Anebyhus and one of their model houseshave been examined from the report?s issues, including Anebyhus?s energyperformance, requirements for the manufacturing and assembly, how theenvelope must be improved to fulfill the requirements for the Passive House andwhat energy calculation programs are available on the market.The report aims to provide solutions for energy efficient houses that are adaptedfor production of house building.Two visits to Anebyhus has been done to study their manufacture and assemblyof building elements.

Radon i betongkonstruktioner : - Kan det undvikas?

The following article consists of two parts; one part is about house construction and the other is a specialization about radon. The house construction part describes how to project a house from start. It contains the conformation of the house, the installations needed, calculations considering the strength of the construction, energy calculation and what materials were chosen. Calculations considering the costs of building and operate the house has been carried out. The result showed that the house would cost approximately two million Swedish kroner to build and thirteen thousand kronor a year to operate.

Grönområde kontra bebyggelse : grönområdenas förändring i Älta, Nacka kommun

This essay shows how natural areas in Älta, a part of Nacka municipality southeast from Stockholm, been changed quantitatively and qualitative as a result of the increased housing construction in the area. Three issues are discussed. Namely: how has Ältas green areas been changed in sizes and quality in line with the settlement's expansion, what is the reason or the reasons to building of different types of accommodations, what has been and is the operators in connection with building of the different types of accommodations?The essay shows that the green areas has been decreased with over 2 km from 1901 to 2000 and in addition to these areas of approximately 1,1km been converted to a planned green structure. Älta has during the years gone through four eras of building types an era of small family houses ? an era of building one million houses on a national scale ? an era of terrace houses ? an era of sporadic building of different housing types (one family houses, pair houses, terrace houses and small blocks of flats).

Arboga Mekaniska Verkstad : Förslag på saneringsåtgärder gällande gjuteriet och plåtverkstaden

The industrialization in Sweden has increased the large number of areas that have been contaminated with various types of pollution. One of those sites are the property Höjen 3:24 in Arboga where ?Arboga Mekaniska Verkstad? once been. The property wants to increase the use of the old former foundry building with the adjacent ?plate-workshop? and believe there are two options for the building: That the building either should be used as a warehouse/concert hall, or rebuilt into a cultural center. An environmental evaluation has shown that the levels of heavy metals are over the Swedish environmental protection agency guidelines of less sensitive land.

Stress i byggbranschen : Orsak till stress i byggbranschen samt förslag på åtgärder

Stress and burnout are two words that are commonly occurring in many contexts today. More and more people experience that they are stressed and that they does not feel well. The long term sick -leave increases as a consequence of people being burned out. These phenomena prolong over all ages, sexes, classes and professional categories, which probably means that the construction industry would not be spared.  In the construction industry, stress and bad health are no new phenomenon, already during the 1970s and big parts of the 1990 s, the construction sector were exposed to the phenomena.A sector that has a large turnover annually cannot presumably be faultless.

LÖNSAMHETSKALKYL AV FUKTSÄKERHETSANSVARIG VID RENOVERING : En fallstudie av ett projekt där ByggaF-metoden har använts

The so called ?ByggaF-method? is a relatively new Swedish method to stop moisture from being built into a building. The method should prevent damages on buildings as a result of mould growth and moisture. The purpose of the method is to include moisture control in the entire constructionprocess, from the projecting phase and all the way to the management phase. Up until now, there is no proof if the method is profitable or not and no studies have been made on the topic.