Sök:

Sökresultat:

21494 Uppsatser om Building Information model - Sida 2 av 1433

Avfall på byggarbetsplatsen : statistik som hjälper platschefen

The purpose of this report is to find a model of statistics for construction and demolition waste, which makes it useful for the local manager at the building site. The intention with the model is that it will be used as a support of the local manager, to direct his project towards reduced strain of the environment. The model will also be used to make it easier to control that the claims from authority and aims for the environment are achieved. To familiarise with the subject waste handling within the building and construction sectorI have done a literature search. I have also been studying rules and regulations regarding the waste handling.

3D-byggnadsmodeller utifrån takkonstruktioner : Lagring, hantering och bearbetning

A growing number of cities and municipalities in Sweden begin to work with city models in 3D. For the most part the models are used for visualizations of ongoing planning processes, but also for the analysis of noise, shadow studies and environmental disaster simulations.Gothenburg continues to develop the use of 3D maps in municipal operations and is demanding a way to create building elements (walls), which generates in 3D buildings, from roof constructions that are mapped from the primary map. A method has been investigated in the present study. The results are then presented as a 3D model of buildings, along with a terrain map that will facilitate the localization of the area. The created 3D buildings are then compared with roof-data from the primary map to see how well they harmonize with each other.

Kalkylarbete för byggnadsprojekt med Vico Office : För- och nackdelar med 5D BIM

AbstractBuilding Information model/Modeling/Management (BIM) is a tool that allows for efficient working methods. BIM saves time and money while providing the potential for visualization. This method of working is based on a 3D-model, and then a fourth and fifth dimension are connected. 5D modeling means that a spreadsheet creates cost estimates based on the 3D model. This provides opportunities to carry out calculations in the early stages of the projects. Calculations are currently performed manually and do not contribute to the development that the construction industry requires.

?Vård i annans hem? - användning av arbetsmaterialet i Huddinge kommuns hemtjänst/boendestöd och personlig assistans

AbstractThe importance of good construction planning affects the final costs of the production and the timing of the project. Planning for building projects has been studied with the aim of identifying how three week planning appears in the construction industry today.A case study has been conducted in Navisworks Simulate to assess whether the software is suitable to connect the task schedule with the BIM model to create a 4D model. 4D models are used for performing 4D construction simulation to visualize the project. In order to use the benefits of the model, investment in equipment and software is required. This means higher costs for the companies.

"Prata högre! Jag hör inte vad du säger" : En kvalitativ studie om elevers och pedagogers upplevelser av Södertäljes nya skolmodell

"Speak up! I can?t hear you"This qualitative study is built on an investigation of a newly instated model that is used when building or renovating schools. The principles of the model are based on building schools with an open plan design where the walls are made of glass and the classrooms are not shut closed by walls, instead the classrooms are completely open except from screens that are used to indicate the ambit of the rooms. This model has been well debated and that is the reason why we chose to do this study.The purpose of this study is to find out how students and teachers experience this model. To do this we have done interviews and observations.

Delårsrapporter - osäkerheter och bedömningar i praktiken

certain building or environment can get a protection as a notable building if it contains certainvalues. These values are established by a certain category of people from the cultural sector.These people use established criterions to define the cultural value of the object. The objects canbe evaluated differently depending on who has done the evaluation. The people who protect thecultural environment and choose which buildings that are to be defining as notable buildingsoften uses a special model to characterise the different cultural values. This model is produced bya man called Axel Unnerbäck.

Effektivisering av LCA med hjälp av BIM

This thesis concerns how Sweden relates to life cycle assessment (LCA) in the construction process. LCA means analyzing a products impact and the analysis includes the whole life span of the product. A building has a high complexity and the combination with its unique shape will make the LCA more comprehensive, unlike e.g. aluminum cans. Recently there has been a development of a working procedure in the construction industry.

Visionen BIM

IT-användandet i byggbranschen har banat väg för nya, effektivare arbetssätt och det finns visioner om hur det ska fungera. Syftet med vårt examensarbete är att ta reda på byggbranschens användande av, och vision om BIM. Vad är BIM ? Building Information model?Kort beskrivet är BIM en modell där all information för ett byggprojekts hela livscykel kan hanteras. BIM förenklar det fortlöpande arbetet genom hela byggprocessen genom att tillhandahålla information om projektet som är relevant, uppdaterad, integrerad, fullt koordinerad och av hög kvalité.

Byggnadsminnen och dess försvarbarhet över tid

certain building or environment can get a protection as a notable building if it contains certainvalues. These values are established by a certain category of people from the cultural sector.These people use established criterions to define the cultural value of the object. The objects canbe evaluated differently depending on who has done the evaluation. The people who protect thecultural environment and choose which buildings that are to be defining as notable buildingsoften uses a special model to characterise the different cultural values. This model is produced bya man called Axel Unnerbäck.

Informationsstyrning av en försörjningskedja i ett icke tillverkande företag.

In this report listed buildings, according to the Swedish Heritage Conservation Act, have been studied with a focus on cases where economical compensation has been given to the owner of the building and cases where the listing of the building has been appealed by the owner. In order for a building to become listed it needs to be particularly valuable from a cultural and historical standpoint. The listed buildings are protected through a list of regulations that determines which parts of the building can or cannot be changed, what methods and materials should be used for changes and repairs, and how the building should be maintained. These regulations should as far as possible be formulated in agreement with the owner, but a building can become listed against the owners will. To decrease the damage this causes the owner he can in some cases have the right to economical compensation. There is also a possibility for the owner to appeal the listing of the building.

Informationslogistisk modell : Hur ska tillverkande företag tillgodose informationsbehoven?

This essay answers the question: How can a manufacturing business fulfill the information demand in the processes; purchasing, production, warehousing, order and delivery?The question has been answered through different kind of studies, such as literature, documents, Internet search, interviews and observations. The essay is written from a hermeneutic point of view and by using qualitative research. The result has been validated by two different manufacturing businesses.A simple information logistic model is the result of a comparison made between theory and empery. The aim of the model is to describe how a manufacturing business can fulfill the information demand by using different methods.

Kvarteret Flaggskepparen, Industriellt byggande för offentligt ägda bostäder -En fallstudie i samarbete med NCC Komponent och MKB

The primary focus of this Master thesis is to study how industrial house building can be implemented during production of rental flats under the terms of public procurement. In order to determine a suitable working process as well as presenting a possible architectonic result of the process, a case study is carried through.A housing projekt is designed on a site i Malmö, where the commisioner is MKB Fastighets AB and the contractor is NCC Komponent with the industrial building system NCC Komplett. The focus of the design is to accomplish high quality apartments to a resonable price, as well as solving the overall scheme for the site.The housing projekt, Kv. Flaggskepparen, built on the consept of a single house model, used to handle the entire site, shows that the building system is well suited to accomodate the commisioners demands.In order to reach the best possible architectonic result with the building system, cooperation initiatded in an early stage of the process is neccesary.A model is proposed to handle the situation under the terms of public procurement. The model suggest that the geometrical design is mainly carried out after inquiry and that architectonic qualities should mainly be defined in a non geometrial way for inquiry..

Från 2D till BIM i ett trähusföretag : Transition from 2D-CAD to BIM in a timber frame home company

A prefabricated timber frame house previously built by Villafabriken AB has been modeled in Autodesk Revit Architectural, a 3D-program based on BIM-technology. This has been done tosee if it?s possible to produce the publications that Villafabriken demands from the designengineer?s work, and examine which possible extra values that may arise compared to traditional 2D-CAD drawing.BIM is short for Building Information modeling. Everything is stored in a single database and a change in the project file is automatically updated across the project. BIM provides more than just drawings since information from the model can be retrieved in various ways such as lists and quantity schedules.It was possible to produce the publications that Villafabriken demanded using Revit, but BIM doesn?t only mean a new way of drawing, it also require a change in the company?s process were the information from the model is being used..

LEED i Sverige och i byggprojektet Borgarfjord 3.

This thesis provides a good introduction to the American environmental certification system LEED, Leadership in Energy and Environmental Design, and trough compar-isons between Sweden and the United States an explanation to the systems design is given. The work is closely linked to a LEED Core & Shell project in Stockholm, Swe-den, where the goal is to reach the second highest rating in LEED - Gold.This thesis gives a broad description of the LEED system and a more profound study of the energy sector, Energy and Atmosphere. Here, for example, an analysis has been made of how the energy consumption of an imaginary building designed according to the requirements of the BBR (Swedish building code) performs in comparison to the Baseline building in LEED.The existing model of Borgarfjord 3, which served as a case study in this work, has al-so been modified to investigate the energy savings that could have been achieved by adding extra insulation to the building. A description of the problems, regarding how the Swedish district heating system (DES) is treated in LEED, is given as well as the suggested modifications. This is an issue that will be pursued during the process of shaping a new, international, version of LEED due to be launched 2012..

Metod för användning av Geografiska Informations System vid långsiktig vägplanering : en studie genomförd på Sveaskogs marker i Norrbotten

The forest industry is one of the most important industry branches in Sweden. Since the demand of high precision wood deliveries has increased, the demand on a well constructed forest road net also has increased. A good road net gives the wood-supplier competition advantages and also increases its service level towards its customers, lumber-mills and pulp-mills. In some parts of Norrbotten, the road net is still insufficient and not yet built out enough, and that is why it is important to know how to act and where to improve the road net in these areas. The purpose of this thesis was to create a work-model for long term road planning in areas with no road net or a not yet complete road net. The model has been created in an ArcGis environment, where a long chain of tools has been tied together with the program ?Model builder?.

<- Föregående sida 2 Nästa sida ->