Sök:

Sökresultat:

3 Uppsatser om Autoklav - Sida 1 av 1

Fascia Panel Redesign

The purpose of this project has been to cut production costs for the fascia panels ofGetinge?s largest autoclaves. The cost for the stainless steel plates currently used is veryhigh. An alternative material solution could cut costs significantly.In addition, improvements have been made to the instrument tower which is a central partof the fascia panel. As a result of the new modular design in a new material theinstrument tower has been improved in several aspects..

Förbättring av dockning mellan lastvagn och autoklav

At present Getinge can offer a new generation of trolleys that they produced in 2011. The trolley used to Getinge various autoclaves and has the primary task to help the user/sterilization personnel to transport shelves or baskets, with or without cargo, from a packing table to the autoclave. The purpose of this thesis has been to develop a primary solution how the docking process between Getinge trolleys and autoclaves can be improved. The work has in most part followed Fredy Olsson principle and primary construction method. The work has included product research, study visit and development of a requirements specification, to satisfy Getinge, their clients and circumvention products requirements.

Utveckling av instyrningsfunktionen hos ett dockningsinterface

In this project the task has been to develop a product that will facilitate an operation for personnel working in a sterilization center. The operation is to steer the front of a loading trolley into the chamber of an autoclave, a so-called docking. The moment is complicated because the margins to deviate from ideal docking position and still succeed, is very small.The principal Getinge's desire was that the product could be retrofitted at the customers on their existing systems. One of the demands was that the product should fit two types of trolleys, one with a adjustable working height and one with a fixed working height. Getinge is supposed to purchase the system from a subcontractor who shall manufacture it and the requirement from Getinge is that the cost of purchase mustn't exceed SEK 500Initially principles, solving the problem was developed.