Kalkylarbete för byggnadsprojekt med Vico Office : För- och nackdelar med 5D BIM

AbstractBuilding Information Model/Modeling/Management (BIM) is a tool that allows for efficient working methods. BIM saves time and money while providing the potential for visualization. This method of working is based on a 3D-model, and then a fourth and fifth dimension are connected. 5D modeling means that a spreadsheet creates cost estimates based on the 3D model. This provides opportunities to carry out calculations in the early stages of the projects. Calculations are currently performed manually and do not contribute to the development that the construction industry requires.

Värdet av att bygga grönt för kommunala bostadsbolag

AbstractThe real estate sector is today responsible for 40 per cent of the total amount of energy consumption within the members of the EU. All over the world there are collaborations within research and projects to find ways of reducing the amount of energy consumed by the real estate sector. In Sweden, a directive from the European Union has posed demands on authorities as well as on the private sector to reduce the amount of energy consumed by new building constructions. Together with the directive from the EU there are also new requirements and demands from Boverket for the real estate sector.  These requirements mostly concern the energy consumption of kilowatt-hour per square metre and that the consumed energy also should be renewable.  The aim of this study is to explain what kind of value municipalities experience in using certifications and environmental investments for new and existing buildings. Within the chapter theory, essential areas are described such as; environmental certification systems, economical viability, proceeds connected to building green, difficulties with building green, the performance of green buildings when affected by the behaviour of tenants and customer value.  The following chapter describes the methodology with which we have conducted this study.

Geoenergilösning för DN-huset

In this thesis proposals for different designs of a borehole thermal energy storage (BTES) have been developed for the building DN-huset in Stockholm, Sweden. To build a BTES results in savings in energy costs by approximately 44 %, i.e. 2 million Swedish crowns annually. Furthermore, a BTES would reduce the annual environmental impact with roughly 75-157 tonnes of CO2 equivalents per year, depending on how the electricity consumption?s environmental impact is estimated.

Optimeringsflöde av modelleringsprogram vid broprojektering : Analys av de tre modelleringsprogrammen Tekla Structures, Revit 2013 och Rhinoceros

This thesis treats Building Information Modeling, BIM, in the production stage. Brieflydescribed BIM is virtual model of a building object where all information about theobject is gathered. All the involved operators in the construction project have access tothe model and can gather or share information about the project. There are several waysto apply BIM in the production stage. This thesis primarily deals with visualization of theobject, preparation and planning, the ability to take amounts from the model andcoordination and clash control.The basic issue was highlighted by Byggdialog AB.

Två metoder av finutsättning och dess noggrannheter

This report describes a study of two different methods to achive the best possible result in setting out apartment details. These two methods are the setting out of details with a measuring tape from baselines and the setting out procedure with an instrument (totalstation).Through our knowledge in surveying and mapping technology and help from a carpenter, this investigation has been implemented. The setting out using a tape has been performed by letting the carpenter to set out windows, bathroom and water- and drain-details from baselines and drawing. The setting out using a surveying instrument was carried out by means of a Trimble Total Station. These two methods have been compared in order to detect and show the difference that occurs.The report shows the investigation background story from the practice of Swedish Mätcenter in Karlstad.A result of differences in accuracy and time is described in the report, as well as their theoretical consequences.

Framtagande av OEE-mall

At Volvo Cars Torslanda's paint shop there is a requirement to in a fast and effective way get an overview of the plants capacity. Therefore a capacity template was constructed as a tool for the engineers at Volvo several years ago. This template has during the years become complicated and outdated. Thus this thesis work will resort as a new capacity template, built from scratch. The new template has been built up based on requirements from Volvo and the concept of OEE (Overall Equipment Effectiveness).

Upprättande av mall för fuktsäkerhetsbeskrivning : Genom granskning av projekt ur fuktsäkerhetssynpunkt

During the 1990?s a large number of building projects were revealed where lack of moistsafety precautions during the construction process had led to extensive moisture damage. Alsoresent implemented studies have shown that the problems with moisture damages have ratherincreased than decreased during the past few years. Moist is considered to be one of the mainfactors to cause unhealth due to deficiencies in the indoor-environment and does also causeunnecessary expenses and a reduction of the confidence in the construction industry.In this Bachelor of Science thesis three projects have been reviewed to examine how moistsafetyhas been observed during the construction process. Main focus has been to identify thebuilding components that are the most exposed to moist, and to examine how they have beentaken into account during the period of design and construction.

Varumärkesbyggande inom småföretag: en fallstudie om hur småföretag skapar värde genom sitt företagsnamn

This thesis intended to examine how small enterprises within the retail industry work with brand building of their corporate name. More specifically it intended to examine how they do to choose corporate name and corporate logotype, and how they work to create a desired corporate image. A case-study was performed with three case-companies from different industries. The method was deductive as the empirics were brought in with starting-point in the theoretical frame of reference. The study showed that there are differences in the way small enterprises within the retail industry work with the brand-building of their corporate name.

?Vård i annans hem? - användning av arbetsmaterialet i Huddinge kommuns hemtjänst/boendestöd och personlig assistans

AbstractThe importance of good construction planning affects the final costs of the production and the timing of the project. Planning for building projects has been studied with the aim of identifying how three week planning appears in the construction industry today.A case study has been conducted in Navisworks Simulate to assess whether the software is suitable to connect the task schedule with the BIM model to create a 4D model. 4D models are used for performing 4D construction simulation to visualize the project. In order to use the benefits of the model, investment in equipment and software is required. This means higher costs for the companies.

Byggnads- och investeringskostnader : Robotmjölkning eller konventionell mjölkning?

This project is based on my fathers farm which lays outside Löberöd, twenty kilometres south of Eslöv in Skåne. While my family for some time have thought about building a new milkingstable with AMS(Automatic milking system) I decided to compare the AMS with a conventional milkingstable. We are abit concerned about how many cows we should have in the new stable. Because of that I calculated with two different number of cows. I have compared three different types of milking stables: One alternative is 180 cows milked in a double eigth hearing bone milking stable. The second alternative is 128 cows milked with two DeLaval VMS-robots. The third alternative is 171 cows milked with three DeLaval VMS-robots. One salesman from DeLaval and one salesman from A-betong helped me to get marketprices on the milkingrobots, building, ventilation and prices on all the concrete. In all the costs labour is included. The rest of the costs are calculated in a softwareprogram called K-data 03 which is a program with predicted costs. The calulations from the program showed that the price in the milkingpit system was 51 000 sek per cow.

BIM i planeringsarbetet : Effective planning by using BIM

AbstractThe importance of good construction planning affects the final costs of the production and the timing of the project. Planning for building projects has been studied with the aim of identifying how three week planning appears in the construction industry today.A case study has been conducted in Navisworks Simulate to assess whether the software is suitable to connect the task schedule with the BIM model to create a 4D model. 4D models are used for performing 4D construction simulation to visualize the project. In order to use the benefits of the model, investment in equipment and software is required. This means higher costs for the companies.

Fejans vandrarhem ? En studie om isolering och uppvärmningsalternativ

During the last decennium climate issues have become more and more important. Many steps towards an adaption of efficient energy supply systems have been taken all around the world. These steps have been created to ensure the next generation?s energy demand. In EU and Sweden objectives have been set to ensure that the energy consumption decreases by 20% year 2020 and by 50% year 2050 compared with the energy consumption levels of year 1995.

Utvärdering av energiberäkningsprogram : Att användas i tidigt planeringsstadium för byggnader

The regulations for energy consumption are consistently getting more and morestrict. This leads to a higher customer demand for energy analysis early in the buildingdesign process. Many building planners and architects use powerful modeling softwareto visualize their projects. These digital models contain sufficient information aboutthe building?s physical characteristics for reliable energy analysis.

Metoder för lastprioritering i fjärrvärmecentraler

A problem in the field of district heating is the oil burners needed to provide power when a peak load occurs. One possible way of reducing the needed amount of oil is to reduce the power demand for space heating in the district-heating substations when the need for district heating water exceeds a certain limit. This can be done by use of a locally working controller function.In this Thesis the options concerning load priority are evaluated. To evaluate the potential for using controller functions concerning peak load priority an experiment was brought out in a chosen district-heating substation. The impact on the indoor thermal comfort during a heat reduction was also taken into account.

Energiåtervinning från gjuteriprocess till fastighet, undersökning för ökat utnyttjande av spillvärme

This diploma work on D-level is made in cooperation with Varnäsföretagen AB in Eskilstuna. The company performs contract manufactured aluminium goods. This work is a continuation on earlier diploma work in Varnäsföretagen AB. Even if the industry process consumes much energy for melting the aluminium goods, they consume a great amount of oil to warm up the building. The purpose of this work is to examine some places in the building and the process to see how much energy it is possible to recycles to the heating system and reduce the costs for heating.