Sök:

Sökresultat:

4325 Uppsatser om ABB Building Systems AB - Sida 8 av 289

Klimatskärmens funktion : En jämförande analys av projekterade nybyggnationer i Östra Salabacke, ur ett energi- samt fuktperspektiv

The design of the building envelope affects the energy consumption of a building. As the energy requirements for new buildings are becoming more demanding, the performance of the building envelope must be improved. Energy efficiency and durability are important attributes to consider.This report includes investigations of the building envelope, moisture and passive solar energy. It is based on the analysis of two different buildings with different designs. These buildings stand as reference for two of the companies who are working on a new, climate smart, residential area in Uppsala, Sweden.Studies and analyses on energy consumption and moisture transportation were made.

Energiåtervinning från gjuteriprocess till fastighet, undersökning för ökat utnyttjande av spillvärme

This diploma work on D-level is made in cooperation with Varnäsföretagen AB in Eskilstuna. The company performs contract manufactured aluminium goods. This work is a continuation on earlier diploma work in Varnäsföretagen AB. Even if the industry process consumes much energy for melting the aluminium goods, they consume a great amount of oil to warm up the building. The purpose of this work is to examine some places in the building and the process to see how much energy it is possible to recycles to the heating system and reduce the costs for heating.

Lufttäta byggnader

The viscosity of air buildings is a hot topic within the construction performers, which the industry feel they have too little knowledge about. This study is mainly aimed against air density in apartment buildings and airflow measurement. The study consists of a theoretical reference, educational visit, interviews and a survey conducted among construction workers at Magistratshagen in Linkoping.Earlier requirement in terms of air leakage through the climate screen was removed and today there are only energy requirement for a dwelling in Boverkets Building Regulations. The difference between a passive and a typical air tight construction is that the passive house have a maximum requirement of 0.3 l /s m2 of air leakage through the building climate screen. The requirement imposed on passive houses is to minimize the supply of power and energy for heating the building.Air tight constructions have heavy demands on the performance and accuracy of everyone involved with the project. The client must specify their requirements and also be prepared to pay for any additional costs. The architect and building planners have to design the building with regard to air tightness. Finally, the construction workers are required to do a careful work in order to get all the connections in the building air tight.The study suggests that an air tight building is a closed system where no forced ventilation exists. There are no reasons not to build too tight as long as there is a functioning ventilation. In this study the authors ask themselves how an air tight building changes over time. No theoretical information has been found on these changes, but the respondents assume that air density decreases with time. The deterioration is mainly assumed to be caused by construction materials changes over time. The study shows that construction workers knowledge of air tight construction is mixed, which they themselves admit in the survey..

Kartläggning och analys av tjänsteprocessen i IKEA-varuhus ur kundens perspektiv

This thesis has been done in collaboration with Peab Stockholm Building 3, which is a region within the Peab Sverige AB. The report is based on a survey and studies of Peab business management systems and production literature. For general information gathering has literature from well-known sources collected in libraries and through the Internet. It shows through the work that Peab has routines for experience feedback in the construction process, but that these procedures work in a small scale and the practical work experience feedback does not work at all. This is also something the construction industry in general also perceived as problematic. The questions in the report are of a wide scale and concerns construction errors cost, how the employees perceive that the company takes advantage of the skills and the mental stress in production line. The goal is to find how Peab Stockholm Building 3 will work on the experience feedback to allow for better productivity. In conclusion, the report author tries to demonstrate what can lead to increased productivity and improved work experience..

Prefabricerat trähusbyggande med moduler : För- och nackdelar samt förslag på vidareutveckling

The construction industry can contribute to a healthier sustainable community. A development that is going on right now is by using more prefabricated volume- and plan elements on the construction sites. Building with this method not only provides a benefit to the environment, but also reduces production rates by taking up to 80 percent less time to build. By building in this way it will be easier to recycle and keep all the material that otherwise would go to waste. Also by building inside a protected environment, the material retains its good quality.This report will take forward proposals on further development of prefabricated volume element of wood, by first presenting this construction methods advantages and disadvantages..

Förutsättningskontroll och nedbrytningstest på oljeförorenad mark : Preem 2, Karlstad

More frequent and intensified rainfalls are expected to occur due to climate change in the nearfuture. This together with a higher proportion of paved areas increases the pressure on today?sstorm water systems (Risinger, 2014; Boverket, 2013; Stahre, 2006). Traditional storm watersystems (i.e. underground pipe systems) have during last decades started to be questioned(Olshammar & Baresel, 2012).

Mer hyresrätter åt folket! En studie om Hallands hyresbostadsmarknad. : - Att skapa lönsamhet för hyresrätter

A variety of demands have to be considered in the design of a new opera house in Galärvarvet. All possible viewpoints are important to be aware of, as is the need for the new building to be a contrast to the already existing opera house in Stockholm. The restricted site also makes a multitude of demands on the building's design.By rationalizing the layout and structure and also by making the footprint smaller, the complex building of over 30 000 square meters can be fitted and blended into the existing physical context. Unlike the existing opera house in Stockholm, the new opera house shows the rationality and the advanced technology that lies behind the scenes and becomes the character of the entire building. Through the dynamic façade, the new opera can convey any character it so desires, just like scenes do through different settings.

Det industriella byggandets betydelse för skapandet av de estetiska egenskaperna i bostadens arkitektur - En fallstudie på företaget JM AB

The study aims to investigate the impact of industrialised homebuilding in the creation of the aestheticproperties of the dwelling architecture.The concepts of industrialised homebuilding and the aesthetic properties of the dwelling architecture aredefined by previously developed models. In these models, industrialised homebuilding is described byeight characteristic areas. The aesthetic properties of the dwelling architecture are described by sevenaesthetic qualities.The study was conducted as a qualitative study, and in-depth interviews were conducted. The companyJM AB is the analysed unit that the author of this report has chosen to study. JM employees and by JMhiredarchitects were interviewed.The report concludes that characteristic area planning and control of processes are considered to havepositive impact on the aesthetic qualities if the process is designed in such a way that the creations ofthese are admitted.

Byggnadsminnesförklaring : ett långsiktig hållbart skydd?

There are currently 2160 buildings in Sweden that are protected by law with the designation as a cultural heritage building, which is the strongest protection that can be obtained for a building of cultural historic significance. The purpose of this thesis is to research how strong and sustainable the protection of such a designation is and how you can motivate a revocation. Furthermore, this thesis aims to give an overall insight into all cases where there has been a revocation.To achieve the protection of a designation as a cultural heritage building, the object has to be of outstanding interest on account of its cultural historic value. In the first part, this thesis gives a short historic background of the cultural heritage law and its terms, like outstanding interest and cultural historic value. The County Administrative Board's documents about revocation are the main source for this research.There have been 24 cases of revocation and the frequency of such cases has increased in the past ten years.

Undersökning av Informationssystem i småföretag : En studie av hur Växjös små företag är nöjda med sina Informationssystem

In todays sociaty the use of information systems is wide spread and many corporations and buisnesses both in large and small spread make use of more advanced and sopisticated systems. Larger corporations have their own IT sections that maintain and updates their systems on a daily basis. They have the money and resources for it by how do the small businesses coop with it. How satisfied are the small businesses that are maybe runing on systems that might not be supplying the needs that the business is in need of. In this paper we investigate this question in the form of a questionnaire.

Energiåtgång under tillverkning och produktion av byggnadskomponenter

This diploma work addresses the question of how much energy is spent whenmanufacturing the components of a building as well as of how much energy is used inthe production of a building. The object of the studies is BioCentrum at the SwedishUniversity of Agricultural Sciences in Ultuna just outside the city of Uppsala. The aimof the work was to investigate how much energy was consumed when manufacturingand production in relation to the management, how many years the production wasrepresented. It was also a study in how mature the construction industry is to answerhow much energy was consumed in manufacturing.In order to get these answers a question form was developed and sent to thesuppliers to BioCentrum. In this form they were to respond to the quantity suppliedto BioCentrum and the amount of energy was spent when manufacturing thecomponents.

Kv. Tvättstugan, ett flerbostadshus med massiv trästomme : Ett examensarbete om akustik- och brandkrav samt en jämförelse av energi- och fuktaspekter

Title: Kvarteret Tvättstugan, an apartment building with massive wood construction. A thesis about acoustic and fire requirements and a comparison of energy and moisture aspects. Earlier restrictions in the Swedish legislation have resulted that only a small percentage of the apartment buildings that have been built are designed with a massive wood construction. It has been allowed to build unrestricted with wood since 1994 as long as the function of requirements are fulfilled. This change in the rules together with the great environmental benefits of wood has led to that more companies choose to build apartment buildings with wood. One of these companies is Folkhem Production AB.

Vad är verklig kostnad per koplats? :

Purpose There are almost infinite numbers of ways to build dairy farms in Sweden. When building a new free stall barn you have the possibility to affect both working environment and animal welfare for many years to come. The construction costs are influenced by which type of barn that is built and what functions it contains, for example one can predict that automatic milking systems are more expensive to integrate than milking parlours. But what is the real cost of today for the construction of free stall barns with milking centres and how is it affected by construction methods and functions? Is the labour time influenced by the building costs? These are some of the questions this report will try to answer.

Värmeåtervinning ur spillvatten i befintliga flerbostadshus

Drain water heat recovery is an uncommon measure in multi-unit residential buildings. There istechnology available for the purpose but the knowing and experience of the heat recovery systems islittle. The purpose of this thesis is to evaluate the future potential of drain water heat recovery inmulti-unit residential buildings.A major part of the multi-unit residential buildings in Sweden were built during modernismen andrekordåren (1940?1975). Many of the buildings have worn out drain and water supply systems andmany are in need of a general refurbishment.

Energi och klimatanalys O-huset på Campus i Halmstad

AbstractThe indoor environment affects the human performance. Noise pollution, poor lightning and coloring are some of the factors that affect our work performance. The human is also affected by the air change and temperature, these factors are in most buildings possible to adjust and through this make economic savings. To find out about the indoor environment in the O-building a questionnaire was handed out, measurements/surveys and an interview was also made. 108 questionnaires where handed out to employees and students.

<- Föregående sida 8 Nästa sida ->