Sök:

Sökresultat:

882 Uppsatser om 500 days of Summer - Sida 14 av 59

Bärförmågetillväxt i pålad friktionsjord

Piled friction soil show a set-up which is increasing with the time after installation. The cost could be reduced if the set-up had been taken into account when designing but in Sweden it is very unusual to do that. Previous studies showed that set-up can vary between 25 % and 75 % during the first 90 days after pile installation. This showed that the effect of the phenomenon is difficult to predict. A study involving five projects have been carried out by specifying certain parameters like pile type, method for pile installation and test method for measure the bearing capacity in friction soils located in Sweden.

Idéträdgården Lucus : som koncept, arbetsprocess och fenomen

During the autumn of 2007 I attended a course in plantcomposition in Alnarp. The main task during the coursewas to make a proposal for a theme garden that was goingto represent the school at an exhibition in the GardenSociety in Göteborg, during the summer of 2008. Thetheme for the garden was set to ?sustainable development?and we had fully two weeks to work with the proposal.I won the competition and during the spring andsummer of 2008 I developed and realized my idea. Thegarden exhibition was inaugurated the 28th of June andwas open until the 28th of September.

Skiftarbetets potential i byggbranschen

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Vilka roller får fritidspedagogen i klassrummet

The purpose of the study was to look into the subjects which the students express when they cry out to their recreation instructor, if there are similarities and differences in the subjects when they turn to their recreation instructor or when they instead turn to their teacher, which different roles and positions the students place their recreation instructors and the teachers in. I have used focused observations during three days in two different schools. Using the ideas of J.Butler on performative perspective, I´ve analyzed the way the students have positioned their recreation instructors and teachers through speech and actions. My conclusion is that students early on see hierarchical structures in school and help maintaining them..

Varför blev det inte som planerat? En studie över platschefers prognosarbete i anläggningsprojekt

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Turbinkretspump system - Kraftvärmeverket i Borås

The Rya power plant in Borås produces district heating, district cooling and electricity. The plant is owned by Borås Energi och Miljö AB and is run by Dalkia Facility Management AB.In order to get the best heat exchange from the district hot water a pair of twin pumps and a turbine circuit pump are used as return pumps. Turbine circuit pumps are used to increase the pressure through the heat exchangers at the power plant. The pumps are in use when the flow is over 2 000 m3 h-1 and during the summer when re-cooling is used to improve the effectivens of the heat boilers.Since the pumps, that are parallel connected, rotating at a fixed rate per minute, the pressure is regulated with regulating valves. This report shows that during the 4,300 hours that the pumps where in use, energy corresponding to 590 MWh was wasted.

Effekter på antalet vårdrelaterade urinvägsinfektioner av nya rutiner för kateteranvändning

Introduction Every tenth patient in Sweden is affected by nosocomial infections. Among these, urinary tract infection (UTI) is the most frequently occurring within the hospital environment. Nosocomial infections lead to increasing costs for care, more suffering among the patients, increasing use of antibiotics, and longer treatment spells. The Academic hospital have engaged all wards in the so called VRISS-project (?nosocomial infections must be stopped?) in order to reduce the number of nosocomial infections.Aim In connection to the VRISS-project new routines for removal of uretrahl catheters are introduced at ward 70E2 at the Academic hospital.

Produktionskostnader för flerbostadshus En jämförelse mellan JMs projekt i Region Väst och Region Öst

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Determination of anthelmintic resistance of Haemonchus contortus to three classes of anthelmintics in a Kenyan sheep flock based on results from faecal egg count reduction test

Haemonchus contortus is the most important bloodsucking gastrointestinal nematode in small ruminants worldwide. It is often controlled by anthelmintics. Even though other methods to control are available, the most efficient way to treat an animal with clinically manifested haemonchosis is to use one of the available broad spectrum anthelmintics: benzimidazoles (BZ), macrocyclic lactones (ML) or imidothiazoles-tetrahydropyromidines or the narrow spectrum drugs salisylanilides or nitrophenols. Anthelmintic resistance (AR) against all groups of anthelmintics in nematode parasites has been reported from many countries, and even multiple AR has been observed. In this study I have investigated the resistance levels to all major classes of broad spectrum anthelmintics in a naturally infected flock of sheep of Red Maasai sheep (RM), Dorper sheep (D) and their offsprings on a research farm in Kenya.

Hälsomässiga risker på vattenledningsnätet - En studie över samband mellan trycknedsatt ledningsnät och förhöjd risk för sjukdom i tre svenska kommuner

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Energy efficient storage of biomass at Vattenfall heat and power plants

Storage of biomass is often associated with problems such as heat development, dry matter losses and reduction of fuel quality. The rise in temperature can potentially cause a risk of self-ignition in the fuel storage. Moreover, emissions from storage piles can cause health problems in the surrounding. The dry matter losses and reduction of fuel quality can have economical effects. The aim of this thesis project is to develop guidelines on how to store large amount of biomass at Vattenfalls heat and power plants in an optimal way.

Bristande mjölknedsläppning hos förstakalvare : en enkätstudie

Milk ejection in dairy cows can be inhibited if oxytocin is not released from the pituitary gland. The problem with inhibition of the milk let down is not new, but has recently regained interest. It is observed during different types of emotional stress, for example when cows are moved to an unfamiliar environment, during oestrus, changing from suckling to machine milking or when being milked for the first time. The aim of the study was to examine the extent of cows with disturbed milk ejection in Sweden. A survey was sent out to 1000 dairy farmers in order to collect data about herd size, housing systems and routines at calving and milking.

Samband mellan lågt tryck i dricksvattenledningar och magbesvär - En utredning av hur lågt tryck på dricksvattenledningsnätet vid lagning av läckor påverkar sjukligheten hos Göteborg Vattens abonnenter.

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

How drinking behaviour in automatic milk feeders can be used as early disease detection

Healthy calves are the foundation in order to run a profitable diary production. Being healthy as calf results in a better start in life and good growth is expected to follow. Within dairy production it becomes more common to rear calves in groups and feed them by an automatic milk feeder. The milk feeder enables for the calves in greater extent to ingest milk or milk replacer several times per day and they are also able to perform natural behaviors in greater extent. Group rearing of calves puts higher demands on the animal keepers to localize individual calves in the group pen, showing signs of illness.

Ljudisolering i prefabricerade betongstommar. En fältmätning av luft- och stegljudsisolering.

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

<- Föregående sida 14 Nästa sida ->