The construction industries are relatively conservative type of business that takes a long

time to adjust for new methods and embrace new ideas. It dose not matter if the new

method seems to be an improved method as long as it is new and untried. Construction

companies are reluctant to change form a longtime working method to a relatively

unknown method.

The purpose with our report is to perform an evaluation of BeWi construction method.

Our goal are to present the generally opinion about BeWi from the contractors that has

been in contact/worked with the method. We also want to know from the contractor’s

point of view if BeWi and the method measure up to the standards that are presented by

BeWi and if they believe that improvements need to be done.

Our progress up to the final report has consisted of three parts

[1]Field studies

[2]Interviews

[3]Literary studies

We started out with field studies where we took notes and observed all the included

working phases on the construction site when using the BeWi method. Also during our

field studies we ourselves tried working with the method for a more close experience of

the work environment.

As conclusion we can say that BeWi construction method undeniable are an easy- going

and working method that improves the work environment for the construction workers

and also has the potential that can lead to better results.

The system is based on a new kind of method which can lead to complications during the

first times working with it, but the commissioning period relatively short. From an

economical point of view the material costs are higher than a regular wooden foundation

but we believe that you can compensate this in the long run with the low energy costs that

this system gives.