Kandidatuppsats
Ständiga förbättringar hos Drive Sol Worldwide AB
Sammanfattning
The purpose with this report is to give structure to the storage area between
production and packaging at Spaljisten AB in Åseda. The purpose is also to give
suggestions for improvements of work tasks and thereby simplify and improve the
material handling at the packing process.
The background of the task is that Spaljisten AB is going to increase their
production and thereby they also need to increase the packing rate of their
products. They will manage this by installing a new automated packing line and
increase the efficiency of the old manual one. The theoretical background is
mostly obtained from literature which contains relevant facts for our report.
The storage area has been studied visually in order to search for improvements of
today’s layout. We have also performed a frequencestudy of the workload of the
serviceperson who runs the material handling at the packing process. We have
compared our frequencestudy to a similar study made earlier by Göran Tinglöv.
The analyze of the frequencestudy and other observations that has been made are
showed under ”Analys” where you also can see the calculations that has been done.
The frequencestudy and the report made by Göran Tinglöv are also analyzed here.
The headline ”Resultat” shows the suggestions for improvements that we have
been working on. The suggestions are founded in small improvements of working
routines, increased use of today’s layout and improved working instructions.
The results of the frequencestudies, and the comparison between them, indicates
that there is a lot of time to save by improving previously mentioned items. Both
studies show that the operation time (the real, value-adding work time) only
represents about 50 % of the total available work time.