Uppsatser om turbin
238 uppsatser · sida 9 av 16
Examensarbete, avancerad nivå · Chalmers tekniska högskola
… work comprehends the followingmain parts:- Theoretical studies aimed at wind turbines and power system stability issues.- Modelling of the type of wind turbines assumed to be built on Uljabuouda.- Simulations of different operation cases and analysis of the simulation …
Kandidatuppsats · Högskolan i Halmstad
… energy. To produce heat and electricity to the house I decided to use a wind turbine and a solar water heater. The most difficult part of designing a house that is energy independent is that the produced energy must be stored somehow. Storing the heat is relatively easy beacuse …
Masteruppsats · KTH
… likely be able to perform a transition from full load to house load or one turbine load without causing a reactor trip even if the dump capacity is limited. If the dump capacity is entirely cut off a reactor trip would be actuated. Simulations also show that with new control …
Masteruppsats · KTH
… likely be able to perform a transition from full load to house load or one turbine load without causing a reactor trip even if the dump capacity is limited. If the dump capacity is entirely cut off a reactor trip would be actuated. Simulations also show that with new control …
Masteruppsats · KTH
… likely be able to perform a transition from full load to house load or one turbine load without causing a reactor trip even if the dump capacity is limited. If the dump capacity is entirely cut off a reactor trip would be actuated. Simulations also show that with new control …
Masteruppsats · KTH
… likely be able to perform a transition from full load to house load or one turbine load without causing a reactor trip even if the dump capacity is limited. If the dump capacity is entirely cut off a reactor trip would be actuated. Simulations also show that with new control …
Masteruppsats · KTH
… likely be able to perform a transition from full load to house load or one turbine load without causing a reactor trip even if the dump capacity is limited. If the dump capacity is entirely cut off a reactor trip would be actuated. Simulations also show that with new control …
Examensarbete, avancerad nivå · KTH
… likely be able to perform a transition from full load to house load or one turbine load without causing a reactor trip even if the dump capacity is limited. If the dump capacity is entirely cut off a reactor trip would be actuated. Simulations also show that with new control …
Examensarbete, avancerad nivå · KTH
… likely be able to perform a transition from full load to house load or one turbine load without causing a reactor trip even if the dump capacity is limited. If the dump capacity is entirely cut off a reactor trip would be actuated. Simulations also show that with new control …
Examensarbete, grundnivå · KTH
… likely be able to perform a transition from full load to house load or one turbine load without causing a reactor trip even if the dump capacity is limited. If the dump capacity is entirely cut off a reactor trip would be actuated. Simulations also show that with new control …
Examensarbete, avancerad nivå · Uppsala universitet
… likely be able to perform a transition from full load to house load or one turbine load without causing a reactor trip even if the dump capacity is limited. If the dump capacity is entirely cut off a reactor trip would be actuated. Simulations also show that with new control …
Masteruppsats · KTH
… Energy and Gas Dynamics Systems Laboratory. Laboratoriet forskar på en ny gasturbincykel som producerar kraft, värme, kyla och vatten. Cykeln är kallad High Pressure Regenerative Turbine Engine (HPRTE) och kombinerat med gasturbincykeln är ett absorptionskylsystem (VARS) …
Examensarbete, avancerad nivå · KTH
… control. The system design is of great importance in PSS/E. Therefore the turbines including their control systems and models for the frequency and voltage dependence of the loads are examined in detail. Further deeper analysis regarding the modelling of the spinning reserve in …
Övrigt arbete
… fibrer (RCF) vid reparationer av skadade värmeisoleringskassetter som omger de turbiner man levererar och driftssätter. Siemens har erbjudit alla som exponerats en hälsokontroll genom sin företagshälsovårdsleverantör Haluxa Arbetsmiljö AB. Sammanlagt rör det sig om 32 personer …
Examensarbete, avancerad nivå · Luleå
… miljökrav driver energibolagen till effektivisering av vattenkraftverken. En turbinrenovering är en omfattande process. Vid renoveringen effektiviseras turbinen och behovet av miljöfarliga smörjmedel minimeras. Genom att förse ledskenor med en rostfri motyta möjliggörs …