Uppsatser om cable

100 uppsatser · sida 4 av 7

Automatiskt Nödstopp

Högskoleuppsats · Högskolan i Halmstad

… systems and solutions for applications. To be able to reduce the amount of cables drawn to various machines which takes both space and an extra fee for every cable drawn. Some systems might require the user to use a handheld device that is directly connected by a cable which in …

Simulering av elektriska förluster i en vindkraftpark

Utveckling av programvaran Wind Farm ElectricSystem Calculator (WFESC)

Examensarbete, avancerad nivå · Uppsala universitet

… where the user could build a proposed wind farm consisting of wind turbines, cables and transformers. The program was named Wind Farm Electric System Calculator (WFESC). Finally, WFESC was verified with measurement data from one of Statkraft’s wind farms in Småland, Sweden …

Elektrifiering av jordbruksmaskin

Direktkoppling till solföljare och elnät

Examensarbete, avancerad nivå · Uppsala universitet

… a conventional diesel driven tractor to run on electricity, delivered via a cable connected to either the main power grid or on-site electric production, such as photovoltaic. Delivering electricity to the machine via a cable is a method with historical roots in the early 20th …

Hur påverkar en ökad andel solceller Umeå Energis elnät?

? En utredning med fokus på spänningsvariationer och osymmetri inom landsbygds- och tätortsnät vid en- och trefasanslutning av solcellsanläggningar

Examensarbete, avancerad nivå · Umeå universitet

… 5 kW through L1 from 100 % of the costumers in the same network the lines and cables are still not overloaded, which proves that overloaded cables is a secondary problems compared to voltage variations and unbalances. The conclusion is that we do not see any serious threats to …

Beredning av lokalnät i landsbygd

Examensarbete, grundnivå · Uppsala universitet

… reliability by exchanging existing overhead lines with underground cables. General network design considerations are discussed as well as the ones for the specific low voltage grid. During the design phase the maximum power of domestic consumers has been estimated using …

Uppvärmd konstgräsplan

Beräkning av utnyttjningstid för en uppvärmd konstgräplan med alternativa rörplaceringar

Kandidatuppsats · Karlstads universitet

… the facility. The operating cost of the system consists of a pump. The heating cables, which are connected in parallel, consist of PVC tube and the total length is about 40 kilometers. The heating cables are 154 mm in plan, with a c/c distance of 200 mm. Forward and return line …

Kvalitetsbristkostnader i samband med reklamationsprocessen

Högskoleuppsats · Högskolan i Jönköping

… is a part of the Prysmian Group, which operates in the energy and telecom cables and systems industry. The purpose of the study has been to identify and analyze the quality costs incurred in connection with the complaint process, and to make suggestions for improvements. The …

Design och framtagande av mätanordning för ström och effek på trefas ledare

Josi Periferi strömmeter

Examensarbete, grundnivå · Uppsala universitet

… and shortening the time required. By attaching sensors around the supply cable, the magnetic field asymmetric flux density can be used and induce voltage proportional to the current in the cable. The result is an instrument that with a computer calculates current, phase angle …

Tillförlitlighet i Stockholms elnät

En analys med hjälp av Tekla NIS

Examensarbete, avancerad nivå · Uppsala universitet

… derived. Two different options for investment were then analysed: changing old cables with high fault frequencies, and installing automatic switching in distribution substations. These options were also analysed in a simplified model built in Microsoft Excel. The model …

DSP-baserat instrument för fjärrmätning av larmnät

Examensarbete, avancerad nivå · Luleå

… and find what is wrong in the alarm net. Possible errors in the net are cable errors, no alarm transmitter in the other end, power loss and so on. The goal with this final thesis work is to develop a prototype of a instrument that in the future can be integrated to every alarm …

Distribution Av Pejlbäringar Över IP-nät

Examensarbete, grundnivå · Linköpings universitet

… The idea is to transport today’s tracesignal through the IP-network instead of cable-net. In this report I will suggest a possible solution to get a fully passed result with no peculiar time delay. I will also suggest some ideas for a future work with the new tracesystem.

VoIP Revolution - strategies to survive the future of telecom

Magisteruppsats · Lunds universitet

… three different categories of companies in the market; industry leaders, cable companies and broadband companies to get a broad view of the market. The theory chapter is based on different strategies that companies have to or can apply to get ahead, stay or survive in a …

Trådlösa nätverk

Kandidatuppsats · Högskolan i Jönköping

… and expand. If someone wants to change office there is no need to draw a new cable or change cables in a switch, just place the computer on the new desk and everything will work as it used to. For most users it’s ok in safety matters to use WLANs but for them with top secret …

Nätanslutning av vindkraft

vindkraftsbranschens aktörers perspektiv på nätanslutning och tariffer

Examensarbete · SLU

… be a monopoly as it was considered to be too expensive to draw new electrical cables. The wind power companies are dependent on net companies to be able to transfer the produced electricity out on the net, to the market so to speak. Feasibility studies in this study show that …