Småskalig elproduktion i Arvika


Arvika Fjärrvärme AB, a district heating company from Arvika, today cover 74 % of their total energy production with biofuel wich runs a 16 MW bioler giving process water at saturated liquid state.In recent years Vaporel AB has introduced a new tecnique that gives an external generation of steam after boilers. The concept is built on an adiabatic pressure drop of the saturated liquid in a so called Flashbox which makes a small part of the liquid to evaporate. The generated steam is lead into a turbine where electricity is in a conventional manner.The purpose with this rapport was to do a basic study for the specific system at Arvika where it?s possible to see the potential production of electricity that follows an installation of a flasbox.The final goal was to introduce an economic analysis of a flashox installation at given conditions.To reach our goals we have created a model in Excel where we used the given conditions at Arvika Fjärrvärme to do our calculations. The model has been tested at three different states, of process water returning to potboiler, to be able to decide the optimal operation for the system at present.The studies have resulted in a pressure of the processwater at 14,5 bar (at) and a pressuredrop to 9,5 bar (at) in the flashbox. The condenser pressure is set to 0,5 bar (at) what is equal to 81 ?C. Energy to the district heating net is produced in the condenser and heat exchanger.The result of our calculations clearly shows that to reach the highest turbine-efficiency as possible and gain the largest profit the highest process-waterflow possible should be used.That means 70 kg/s after present conditions.At the highest boiler efficiency the turbine will produce 694 kW. At this state the water that returns to the boiler will be at temperature 148 ?C (14, 5 bar).Totally during a year the production of electric energy could reach 2, 47 GWh/year. The energy used by the pumps will increase with 0,21 GWh over the year at that state.Included all economic factors this will generate a profit of 0, 97 million (SEK)/year.To make an installation of a flashbox system more profitable an increased generation of electricity have to be made. This could be done by an installation of new pumps to be able to run the process-water at a larger flow to increase the amount of steam made in the flashbox.

Författare

Niklas Pettersson Nils Eriksson

Lärosäte och institution

Karlstads universitet/Institutionen för ingenjörsvetenskap, fysik och matematik

Nivå:

"Uppsats för yrkesexamina på grundnivå". Självständigt arbete (examensarbete)om minst 15 högskolepoäng utfört för att erhålla yrkesexamen på grundnivå.

Läs mer..