Sök:

Sökresultat:

1 Uppsatser om Prioriteringsmatris - Sida 1 av 1

Uppskärningsmaskin : Underlag till CE-märkning

Abstract (in English)The work that lead to a CE- marking and the creation of a total drawing foundation on an existing machine carried out on the company Polytec Composites Sweden AB in Ljungby. The company have design an machine that exist in six example that runs in the production. To be able to use the machine the company have to work out a CE-marking. The process that summed up all the document that needs for the machine to make a CE-marking. The documentation includes a total drawing over the machine and a risk analysis performed by a group employers on the company.