Sök:

Sökresultat:

712 Uppsatser om Calculations - Sida 1 av 48

Invallningsmodeller för petroleumcisterner

This paper is about the extent to which simplified penetration Calculations ofsmall-caliber projectiles is a useful tool for assessing the physical protectioncapability. The work should be seen as an attempt to create an accessible tool inthe form of a simplified equation that allows for a better and safer use of thenaval vessels. The tool will also be used at different levels so that decisions andinstructions could be clearer.Performed Calculations show a very limited capacity of a ship's basic design interms of physical protection against the use of small-caliber projectiles.How do we know that the Calculations correct? By verifying the Calculations withpractical shooting tests, a substantial condition to answer the question will becreated. To shoot against a material with two different thicknesses estimated toproduce perforation and non-perforation is a good approximation of the equationusability in the context..

Energibesparing i flerbostadshus

This paper is about the extent to which simplified penetration Calculations ofsmall-caliber projectiles is a useful tool for assessing the physical protectioncapability. The work should be seen as an attempt to create an accessible tool inthe form of a simplified equation that allows for a better and safer use of thenaval vessels. The tool will also be used at different levels so that decisions andinstructions could be clearer.Performed Calculations show a very limited capacity of a ship's basic design interms of physical protection against the use of small-caliber projectiles.How do we know that the Calculations correct? By verifying the Calculations withpractical shooting tests, a substantial condition to answer the question will becreated. To shoot against a material with two different thicknesses estimated toproduce perforation and non-perforation is a good approximation of the equationusability in the context..

Överföring av och beräkning med timmätta värden ? från MT2000 till Xpower

New technology makes it possible to remotely measure all consumers in a power network onan hourly basis and store the values in a database.This thesis work describes the conversion process between automatic meter reading systemMActor and calculation software Xpower.Then the possible differences between Calculations of power networks using load curves incombination with a yearly estimate of consumption and Calculations using hourly measuredvalues is examined.The result of the comparison shows that, for the power network under inspection, nosignificant difference could be noticed. This does not mean that Calculations using hourlymeasured values would be unnecessary. I believe that in a near future Calculations using hourmeasurements will be the primary choice for many power companies to whom technology isavailable.Also some basic Calculations of fundamental power network parameters, such as power factorand loses, are presented using hourly measured distribution transformers in combinations withits hourly measured loads.The report is written in Swedish.

Konstruktion av yttervägg med vakuumisoleringspanel

This paper is about the extent to which simplified penetration Calculations ofsmall-caliber projectiles is a useful tool for assessing the physical protectioncapability. The work should be seen as an attempt to create an accessible tool inthe form of a simplified equation that allows for a better and safer use of thenaval vessels. The tool will also be used at different levels so that decisions andinstructions could be clearer.Performed Calculations show a very limited capacity of a ship's basic design interms of physical protection against the use of small-caliber projectiles.How do we know that the Calculations correct? By verifying the Calculations withpractical shooting tests, a substantial condition to answer the question will becreated. To shoot against a material with two different thicknesses estimated toproduce perforation and non-perforation is a good approximation of the equationusability in the context..

Byggtekniska brister i ett radhusområde Förslag på lösningar vid ombyggnad

This paper is about the extent to which simplified penetration Calculations ofsmall-caliber projectiles is a useful tool for assessing the physical protectioncapability. The work should be seen as an attempt to create an accessible tool inthe form of a simplified equation that allows for a better and safer use of thenaval vessels. The tool will also be used at different levels so that decisions andinstructions could be clearer.Performed Calculations show a very limited capacity of a ship's basic design interms of physical protection against the use of small-caliber projectiles.How do we know that the Calculations correct? By verifying the Calculations withpractical shooting tests, a substantial condition to answer the question will becreated. To shoot against a material with two different thicknesses estimated toproduce perforation and non-perforation is a good approximation of the equationusability in the context..

Ytstridsfartygs ballistiska skydd mot finkalibriga projektiler

This paper is about the extent to which simplified penetration Calculations ofsmall-caliber projectiles is a useful tool for assessing the physical protectioncapability. The work should be seen as an attempt to create an accessible tool inthe form of a simplified equation that allows for a better and safer use of thenaval vessels. The tool will also be used at different levels so that decisions andinstructions could be clearer.Performed Calculations show a very limited capacity of a ship's basic design interms of physical protection against the use of small-caliber projectiles.How do we know that the Calculations correct? By verifying the Calculations withpractical shooting tests, a substantial condition to answer the question will becreated. To shoot against a material with two different thicknesses estimated toproduce perforation and non-perforation is a good approximation of the equationusability in the context..

LCC-kalkyler i byggbranschen : förutsättningar och tolkning av resultat

Background:Life-cycle costing (LCC) is an investment calculation that takes intoaccount operating costs throughout the investee lifecycle. LCC Calculations are mainly usedto evaluate investments that have no revenue side. Attempts to apply the LCC Calculations forbuilding-related investments have occurred since the 1980s. Despite the advantages ofusing LCC Calculations, use has not passed through in full. The main obstacles have beenidentified as a lack of relevant input data, and insufficient experience of workingwith LCC Calculations.

Framtagning av ny lager layout hos Allied Motion Stockholm AB - En studie om effektivisering av lager och intern materialflöde

This report is about the shear force design of reinforced concrete according to Europe?s common dimension rules, Eurocode. The purpose is to describe the calculation procedure and the background to the formulas and expressions that occurs. Furthermore results from different calculation methods (hand Calculations and computer Calculations) will be compared to see how they differ.The goal with this is to go through the parts of Eurocode dealing with shear force and that this will lead to a clear review of these. You should also be able to see how results and the calculation procedure differ between different calculation methods.

Tvärkraftsdimensionering av armerad betong : En utredning av beräkningsförfarandet

This report is about the shear force design of reinforced concrete according to Europe?s common dimension rules, Eurocode. The purpose is to describe the calculation procedure and the background to the formulas and expressions that occurs. Furthermore results from different calculation methods (hand Calculations and computer Calculations) will be compared to see how they differ.The goal with this is to go through the parts of Eurocode dealing with shear force and that this will lead to a clear review of these. You should also be able to see how results and the calculation procedure differ between different calculation methods.

Bostadsförnyelse - för vem? : En fallstudie av bostadsförnyelsen i två bostadsområden i Uppsala

Background:Life-cycle costing (LCC) is an investment calculation that takes intoaccount operating costs throughout the investee lifecycle. LCC Calculations are mainly usedto evaluate investments that have no revenue side. Attempts to apply the LCC Calculations forbuilding-related investments have occurred since the 1980s. Despite the advantages ofusing LCC Calculations, use has not passed through in full. The main obstacles have beenidentified as a lack of relevant input data, and insufficient experience of workingwith LCC Calculations.

Elever med autism och asperger i en liten undervisningsklass : En alternativ skolform för elever med neurologiska funktionshinder

Background:Life-cycle costing (LCC) is an investment calculation that takes intoaccount operating costs throughout the investee lifecycle. LCC Calculations are mainly usedto evaluate investments that have no revenue side. Attempts to apply the LCC Calculations forbuilding-related investments have occurred since the 1980s. Despite the advantages ofusing LCC Calculations, use has not passed through in full. The main obstacles have beenidentified as a lack of relevant input data, and insufficient experience of workingwith LCC Calculations.

Företagsstudie om värmeöverföring : Beskrivning av värmeflöden hos en lagerbyggnad

The study took place at a food corporation in Växjö, Sweden. It describes a building that contains four tanks in which glucose syrup is stored. The purpose of the study was to calculate the amount of heat that leaves the building and the amount of heat that is supplied by the installed heating equipment. Before the Calculations could be implemented, all the systems that supply the building with heat had to be examined. With a small amount of information from earlier studies, the work to gather all the data necessary for the Calculations began.

Kostnadsuppföljning avproduktionskalkyler

Calculations are an important part of planning around a construction project. From concept to completion of the project calculation is a tool to try to predict the actual cost. During the production stage in particular, deviations occur which makes the actual cost different from the Calculations.This thesis is done in collaboration with JM Residential Stockholm. The study includes a cost follow-up in which a comparison was made between the calculated production cost and actual cost for the five projects. The aim of the study was to observe the most common reasons that a project deviates from the calculated production cost and then summing these causes in a number of categories.

Projektering av vindkraftspark i Juddhult, Småland

The aim with this study was to collect fundamental information, and to plan, a windpower farm in Juddhult , Småland in southern Sweden. The goal is to collect the bestavailable projecting planning support. The pieces of this projecting planning supportthat will be presented is; Environmental Consequence Description (MKB), productionCalculations, comparisons between different plant types, economic Calculations, evaluatethe economy and give some farm design suggestions. The imagined wind farm will belocated in forest environment and which may cause a number of new problems. Specialinterest that will be affected, where special consideration because of the forestenvironmental is requested is, hunting, wetlands, ancient monuments and windturbulence.

Standardiserad tillverkning av nätstationer

AbstractAbetong in Falkenberg manufactures, among other things, small prefabricated concrete buildings for housing various installations, such as electric transformers.The aim of this dissertation is to reduce the time needed to design such buildings, by way of finding a number of standardized buildings. Standardized in such a manner as to incorporate both the needs of the manufacturer (Abetong) and its customers.To analyze the needs of the parties the work has included a market survey and Calculations on the strength of these buildings.One survey was a letter questionnaire to all of Abetong?s customers who have, in the past, ordered these types of building. The aim of the questionnaire was to establish how the customers want these buildings designed.Another survey conducted was an inventory of all of Abetong?s previous projects where these types of building were manufactured.

1 Nästa sida ->