Tids- och arbetsstudier i stora mjölkningsstallar :

Please see attached files for Swedish and English summaries. .

Utveckling av produktionslina

The company is currently in a stage of improvement and has therefore taken the help of students at School of Engineering, Jonkoping University. The current production is batch, production layout is fixed. A bottleneck is created after the first station which leads to large efficiency loss.  The meaning of this report was to provide a layout suggestion with balanced workstations to a new production line. The conditions were that the production line would be one-way, driven by customers order and meet a demand of 40 products per week.

Kartläggning av kapacitetsutnyttjandet och ställtider på Stålöv AB : Survey of the use of capacity and set up times at Stålöv AB

The aim of this report is to analyse the use of the capacity at the CNC (computer numerical control) cutters and show how the level of set up time for these cutters at Stålöv AB. This assignment is concrete whereas there are no subjective questions to this matter and there are only cold figures presented.Production economy is getting more important as the competition hardens and there are several different ways to increase productivity and efficiency in a company. In order to increase productivity and efficiency work studies are used to, through an analysis, find developments in methods that result in improved work methods and to establish the time that are used. Increased production of different parts and customer driven production in combination with increased demands on rationalisation of capital have led to an enlarged interest for shorter set up times in the production.To point out the use of capacity and the set up time of the cutters at Stålöv AB we used frequency studies. Frequency studies are work measure methods based on random observations on predetermined events to calculate the relative occurrence of these events.

Förslag på produktionsförbättringar av Sektion 24 vid LKAB: s
anrikningsverk i Kiruna

Detta examensarbete har genomförts vid LKAB:s anrikningsverk i Kiruna, där produktionssektion 24 har studerats. Denna sektion maler tillsatsmedel, som används vid tillverkningen av pellets. Projektets fokusering har legat på att ta fram konkreta förslag på förändringar som kan förbättra styrningen av produktionen, uppnå en jämnare produktkvalitet och en bättre arbetsmiljö för personalen. Projektet började med en grundläggande studie av nuläget, för att kunna identifiera de problem som finns idag. Metoder som användes till denna studie var Arbetsstudier, intervjuer, kontroller av produktkvalitén och studie- och benchmarkingbesök.