Sök:

Sökresultat:

356 Uppsatser om Wind turbine - Sida 2 av 24

Simulering av elektriska förluster i en vindkraftpark : Utveckling av programvaran Wind Farm ElectricSystem Calculator (WFESC)

When planning new wind farms, the cost for the internal electrical grid is estimated to account for 8-9 % of the total investment cost. On top of that, the cost for accumulated reduced income over several years (due to electrical losses), has to be added. The economic lifespan is relatively long (about 20 years) which means that an error in the loss calculation could lead to a bad decision basis. The accumulated reduced incomes due to electrical losses can be higher than the initial investment cost for the internal electrical grid.Today, Statkraft Sweden is using a template number when estimating the electrical losses in a wind farm. The actual losses are probably lower than the template number which could lead to an unnecessary high loss cost when planning a new wind farm.The aim of this M.Sc.

Meningen med meningsförändrande innovation inom robotikbranschen : En explorativ fallstudie

The purpose of this study was to increase the level of knowledge in the field of Environmental Impact Assessment (EIA) for wind power. The study includes six wind power farms in the County of Västerbotten in northern Sweden. The main questions were: What are the real dimensions of roadways and land claims for both roads and wind power turbines? How do those dimensions correlate with the dimensions stated in the EIA? Are there any differences in values of the dimensions between the wind power farms that are included in this study? The width of the roadways and the land claims for both roads and Wind turbines in wind power farms were examined on site. The results from the examinations were compared with the dimensions available in the EIA for each wind power farm.

MÄTNING AV LJUDIMMISSION FRÅN VINDKRAFT. VIDAREUTVECKLING AV METOD FÖR MÄTNING

The Swedish government have a goal that Wind turbines shall produce 30 TWh by the year 2020, compared to about 3,5 TWh produced in Sweden during 2010. To minimize the disturbance that Wind turbines create the Swedish Environmental Protection Agency has stated a guideline value that noise from Wind turbines at nearby residents shouldn?t exceed 40 dBA, at 8 m/s wind speed. With advanced calculation models, like Nord 2000, the emitted sound from future Wind turbines can be calculated at an early stage to optimize the power production without exceeding the 40 dBA. When the turbines have been built there is a need to verify that they really are within the guideline.

EN FALLSTUDIE OM URBAN VINDKRAFT VID ALBANO

The use of energy is an important question in today´s society, and a substantial part of the energy that is used today is used in our homes. To lower this usage is vital, and there are regulations in place both on the national and the local level, that say that new apartment blocks must be built to consume less energy, which in the end will lower the impact on the climate.One way to make the housing sector more environmentally sustainable, is to produce energy issions that are bad for the environment, for example to build Wind turbines close to or even on the buildings, so called urban wind power. The scope for this report is to see if urban wind power could be a sustainable alternative for the residential area that Svenska Bostäder plans to build in Albano in Stockholm.There are extensive scientific theories regarding wind and wind power, and a literature study is made to investigate past knowledge in the area. Efforts have been made to find earlier trials with urban wind power and, both scientific research and trials where urban wind power actually has been installed. The theory chapter deals both with the wind itself and how electricity can be generated from wind.

Utökning av mätområdet för turbinverkningsgraden på avgasturbo

The Goal with this Master of Science thesis is to expand the possible turbine efficiencymeasurements on an exhaust turbocharger. It was done as a part of the CICERO competencecentre. To feed the turbine with air a special flow rig has been used. Instead of loading theturbine by just restricting the compressor flow a docking system for an electrical dynamometer isdesigned to use the dynamometer as an additional loading source. By using an electricaldynamometer as loading device for the turbine, measurements are not depending on compressorperformance.A large part of the work consists in designing accessories for the dynamometer.

Uljabuouda vindkraftpark turbinmodellering och stabilitetsanalys

This master thesis has been performed at Solvina in Gothenburg for Skellefteå Kraftand Vattenfall Eldistribution. The aim of it is to investigate the consequences of theinstallation of a wind power plant on the mountain Uljabuouda in the vicinity ofArjeplog. Especially the impacts on voltage and transient stability are examined.Furthermore, the amount of extra strain on the voltage regulation equipment and theneeds for increased regulation capabilities are looked into.The wind power plant is planned to be built by Skellefteå Kraft and connected to a130 kV grid owned by Vattenfall Eldistribution. The work comprehends the followingmain parts:- Theoretical studies aimed at Wind turbines and power system stability issues.- Modelling of the type of Wind turbines assumed to be built on Uljabuouda.- Simulations of different operation cases and analysis of the simulation results.The results from the simulations show that, as far as voltage stability and extraworkload on tap-changers are concerned, the wind power plant does not, in anysignificant manner, worsen the present conditions. The problem of overloading theline between Arvidsjaur and Vargfors is also minor.

Vindkraft i norra Sverige. Inventering av lämpliga platser för vindkraftsetablering i de sex nordligaste länen.

The interest for wind power has increased in Sweden. Northern Sweden is especially interesting due to that a new wind resource map shows that there are areas in northern Sweden that have more potential for wind power than what have been known before. Therefore E.ON Vind is interested in finding out if, and where, there are suitable places for establishment of wind power in northern Sweden. The purpose of this master thesis is therefore to perform an inventory of northern Sweden for suitable places for wind power. The master thesis is performed at E.ON Vinds office at Vasagatan in Stockholm.

Vindkraftsetablering i skog

This thesis assignment at C-level is focused on calculation models and prediction methodswhish can be used in the stage we call ?prospecting? of possible windmill locations. Thelocation is southeast of Halmstad at the Farm ?Stjernarpsgods?. The rapport has two mainareas directed towards this task.

Validering av vattenkraftmodeller i ARISTO

This master thesis was made to validate hydropower models of a turbine governor,Kaplan turbine and a Francis turbine in the power system simulator ARISTO atSvenska Kraftnät. The validation was made in three steps. The first step was to makesure the models was implement correctly in the simulator. The second was tocompare the simulation results from the Kaplan turbine model to data from a realhydropower plant. The comparison was made to see how the models could generatesimulation result that was similar to the reference power station.

Effektivisering av energianvändningen i en förskola

This rapport contains an examination of the energy consumption of a kindergarten, which areas that have the largest impact on the energy consumption and what can be done to reduce those areas in ways that are relatively easy and profitable. It is also analyzed if it is possible to reduce the energy consumption from today?s consumption to a consumption that fulfils the demands placed on low energy houses by FEBY.The focus has been on reducing the energy consumption of the areas ventilation, heating system and hot water system, since those seemed to be the easiest ones to affect and since the building is quite recently built.There are different kinds of ventilation systems, at the moment the building have a CAV-system, which means that the ventilation is too high during large parts of the day. There are different ways to manage the ventilation system, for example presence detection, humidity sensors, CO2 sensors, temperature sensors and season adjustment. Many of those are in the end dependent on CO2 sensors to guarantee a good indoor climate, therefore the focus have been placed on this system.

Vindkraftsplanering i skogsmark

The aim of this study about wind power planning in forest was to examine the factors and restrictions, which represent technical limitations, biodiversity, tourism and amount of energy for wind farms in Kronoberg County. Suitable areas for wind power were identified from the collected information about planning principles and potential conflicts. From the suitable areas the potential energy gain is calculated. Methods used were mainly a literature review, interviews with experts and practitioners, GIS analysis and a rough calculation of the energy gain. The section of information and facts describes in general wind power planning and possible conflicts.

En amatörmusikkår i en föränderlig verklighet : En berättelsebaserad dokumentation med ett antal frågeställningar

The local wind band in Lilla Edet, Lilla Edets Musikförening, springs from work and activities in the late 19:th century. Since then, the band has developed from a brass sextet to mixed wind band. It has been an appreciated contribution to the society on festive occasions. Yet, it seems like the band more and more has lost it´s useful purpose. Also, the recruiting of new members has ceased, as the music school has trouble with attracting pupils to learn to play wind instruments.The reasons for this reduced interest are more then one.

Blåsorkestern i förändring

Sweden has a long and extensive wind band tradition. Today the interest for the traditional instruments is decreasing among children and teenagers. What can this be due to? Which conditions are needed for a functional wind band in the future? The purpose of this essay is to find answers to these questions and at the same time shed light on good examples, where the wind band activity works. To be able to answer the questions have I made four interviews with persons who have a big knowledge and interest about the subject.

Faktorer som påverkar vindkraftsutbyggnaden

Wind power is expanding rapidly in Sweden. Increasing amounts of wind power sets higher requirements on balancing power and grid expansions and would affect the whole Swedish electricity system. The aim of this report is to examine the factors affecting the wind power expansion in Sweden. How many wind power plants projects will obtain building permissions and what costs and revenues can be expected? How much balancing power will be required and does a changing geographical distribution of the wind power plants reduce the need of balancing power?A survey of the county board?s official applications has been made and out of all the applications, corresponding to 80 TWh produced per year, about half of the applications are expected to obtain a permit with a major portion of them located in the north of Sweden.Especially older wind power plants, deriving revenue from Nord pool, find themselves today in a complicated financial situation.

Utredning av frekvensregleringens påverkan på mekanisk utrustning i en kaplanturbin

As a consequence of increasing wind power installations in the Nordic grid the last years, the need for regulating power has become larger. In the Nordic grid, regulating power is mainly provided by hydro power. One part of the regulating power is called frequency control, which ensures that the grid frequency is stable and close to 50 Hz.However, setting the turbine into frequency controlled operation may cause stress and wear of the components in the mechanical control system. Frequency controlling implies large and frequent servo forces and longer travelling distance of the sliding bearings in the Kaplan turbine.Based on one selected Kaplan turbine, Selsfors G1, measurements and MATLAB calculations have been performed in order to determine forces and movements of the linkage system. With these forces and movements as input, stresses and fatigue have been determined as well as sliding distances, bearing pressures and wear of bearings during a typical lifetime of 40 years.The results indicate that no severe wear exists on the bearings during 40 years of service.

<- Föregående sida 2 Nästa sida ->