Sökresultat:
285 Uppsatser om Wind Turbines - Sida 7 av 19
Förbrukningsreduktion : Ett alternativ till gasturbiner som snabb aktiv störningsreserv?
The gas turbines in the Swedish secondary reserve are reaching the end of their technical lifetime, hence alternative solutions need to be considered. One of the solutions thought to have the greatest potential is the use of so called consumptionreduction. By entering contracts with large consumers, agreements are made to reduce consumption in the event of major disturbances in the power system and thus being used as a secondary reserve. This thesis investigates the feasibility of consumption reduction as part of the secondary reserve. This has been achieved by developing a requirement specification for the disturbance reserve and by studying the technical and economic potential for consumption reduction among a range of consumers.The technical potential for consumption reduction that fulfils the requirements for participating in the secondary reserve are on average 750 MW in SE 3 and 98 MW in SE 4.
Vindkraftsetablering i skog
This thesis assignment at C-level is focused on calculation models and prediction methodswhish can be used in the stage we call ?prospecting? of possible windmill locations. Thelocation is southeast of Halmstad at the Farm ?Stjernarpsgods?. The rapport has two mainareas directed towards this task.
Projektet att etablera vindkraft : möjligheter och risker med ett förnybart energisystem
This thesis describes the processes of establishing wind farms in Sweden. The workcontains a thorough literature review regarding both the establishing process andproject management, including complex project theory. The main part consists of theexecution of 15 interviews with organizations involved in wind farm establishment.The result of these interviews laid the foundation for a process description identifyingdifferent steps and activities in these types of projects. The outcome was thencompiled in a project model, which includes five phases and four processes.When analyzing the project of establishing wind farms from the theory of complexprojects one discovers that the amount of different requirements and stakeholdersnecessitates a systematical and dynamical project structure. Since projects are in needof different types of competences there are also many consultants and contractorsinvolved.
Påverkan av skuggor från vindkraftverk
To get rid of our dependence on fossil fuels we need to make use of renewable energy sources like wind power to a greater extent. Even though wind power is a renewable energy source it can still cause some problems for the close environment. One of the problems is shadow flickering. When the sun is low and the wind blows in a direction so that the rotor blades are positioned at right angles to the sunbeams and ?cut? the sunbeams off.
Det energiproducerande huset
We are heading towards a huge switch of how energy is produced with fossil fuels being replaced by renewable energy sources. It is not difficult to replace the energy you use in the house and there is no need for futuristic technology. There are already many established products on the market such as high efficiency vacuum solar collectors, heat pumps & small wind power stations that can supply the energy being used in a house. The company Sol & Energiteknik SE AB in Huskvarna has many different products which can reduce the need for an outside energy distributor. An average house in Sweden uses 15 000 kWh for heating, 5000 kWh for tap water and 5000 kWh for electricity.
Konstruktion av en autonom vindstation
Construction of an autonomous wind station was a project with the goal of creating a product that could collect wind data from a sensor and then transfer this data to a server wirelessly over the GSM network. The device would be powered by batteries and solar cells and function fully without requiring external power supply. This required that a small computer was constructed and programmed to store and send data at predetermined cycle times and programming of a server that received the sent data. The project also required optimization of power consumption and dimensioning of solar cells and batteries based on this. The construction of this station demanded research both for the selection of hardware and programming software. The computer was based on a microcontroller and a GSM module that sent the data over the 2G network.
Minivindkraftverks inverkan på lågspänningsnät
Micro-power wind energy convertors have recently increased in popularity. The reasons for this are among other things the increasing cost of electric energy and enviromental concern.In this thesis the connection of these micro-power wind energy convertors to the utility network is discussed. Electric standards for the connection of small production units is presented. Finally some calculations and measurements of electric quality are also presented. The utility network used in the calculations is part of Halmstad Energi och Miljö network..
Ny stamstation i Yttermalung för anslutning av vindkraft : Nätstudie av olika utföranden i normal- och reservdrift
Since 2004, wind power has had the largest installation of new capacity compared to other energy sources in Sweden. Accommodating new wind power may require strengthening or rebuilding of the existing grid in areas where the grid is already loaded to maximum capacity. This master thesis examine the possibility of a new 400/130 kV substation in Yttermalung, Sweden, with a connection to the two neighboring regional grids in Dalarna and Värmland owned by Fortum. This substation would provide a new connection point to the Swedish transmission system as well as an interconnection of the two, currently separated, regional grids. Different expansion scenarios where a substation with and without series compensation or a phase shifting transformer (PST) to control active power flow were studied.
Riksintresse; Bevarande eller nyttjande : Vindkraftsutbyggnad inom Natura 2000- områden
Natura 2000 is part of the European Union: s framework to protect and preserve biological diversity. Natura 2000- areas are by the goverment appointed to areas of national interest for preserving nature. Also wind power stations are appointed as of national interest and the reason for this is the goverments goal to get energy from reneweble energysources. This essay describes when both these intrests conflict eachother when it comes to building wind power stations within Natura 2000- areas. The main focus of this essay is a casestudy of two cases from two different counties, Dalarna- and Norrbotten county, where applications have been made to build wind power stations within existing Natura 2000- ares, both cases have reached the court dealing with enviromental issues.
Balansering av vindkraft och vattenkraft i norra Sverige
This master thesis was initiated with the aim to answer at what level of installed capacity of wind power in the northern parts of Sweden it would be beneficial to improve the transmission capacity from the northern Sweden. During the process of this work the aim has changed to try and create a model that can be used to analyze how well the hydro power installed in the northern Sweden can even out the quick changes in wind power production.To create a good model of all hydro power in northern Sweden is a very large job, unfortunately too large for a master thesis. This report therefore ends with an extensive analysis of the simplifications that have been made and their effects as well as a list of the future work that has to be done.The model that has been created have shown to be effective and produce good results. The conclusions that can be made is that the northern Swedish hydro power have very good possibilities to balance the wind power production. Only a few cases where water have been spilled even though there has been some free capacity has been discovered.
Optimering baserad på vinds tillgångar
yield optimization, wind energy, sustainability, maintenance..
INOMHUSMILJÖ I SMÅHUSMED FTX-VENTILATION : EN LITTERATURSTUDIE MED ENKÄTUNDERSÖKNINGAR OCHMÄTNINGAR
This master thesis was initiated with the aim to answer at what level of installed capacity of wind power in the northern parts of Sweden it would be beneficial to improve the transmission capacity from the northern Sweden. During the process of this work the aim has changed to try and create a model that can be used to analyze how well the hydro power installed in the northern Sweden can even out the quick changes in wind power production.To create a good model of all hydro power in northern Sweden is a very large job, unfortunately too large for a master thesis. This report therefore ends with an extensive analysis of the simplifications that have been made and their effects as well as a list of the future work that has to be done.The model that has been created have shown to be effective and produce good results. The conclusions that can be made is that the northern Swedish hydro power have very good possibilities to balance the wind power production. Only a few cases where water have been spilled even though there has been some free capacity has been discovered.
Habitat use and ranging behaviour of GPS tracked juvenile golden eagles (Aquila chrysaetos)
Throughout its wide distribution in the northern hemisphere, the golden eagle occurs in a diverse range of environments, e.g., mountainous, forest and open areas. The literature on juvenile golden eagles is limited, and this study provides further knowledge on habitat use and ranging behaviour during the post-fledging period in boreal Sweden. A total of 14 golden eagle juveniles were tagged with GPS transmitters during 2010 and 2011, and nine could be followed during the entire post-fledging period from fledging until migration.
The juveniles fledged at the end of July and beginning of August and initiated migration during October and beginning of November. The length of the post-fledging period, until migration started, ranged from 49 to 97 days. During this period, the juveniles? distance from their natal nest and their GPS height increased with time as their flying abilities developed.
Småskaliga vindkraftverk på byggnader i urban miljö : Möjligheter och hinder för ökad implementering
Intresset för småskaliga vindkraftverk på byggnader har ökat under de senaste åren. Allt fler människor blir mer energi- och miljömedvetna samt ser fördelarna med att elektriciteten produceras där den konsumeras; i den bebyggda miljön.Det är dock en större utmaning att installera ett vindkraftverk i urban miljö, jämfört med i öppet landskap, då det finns många faktorer som skall beaktas. Stadens komplexa uppbyggnad gör att vindens hastighet och riktning varierar och ger upphov till turbulenta strukturer i den omgivande luften. Många av dagens vindkraftverk kan ej operera effektivt vid turbulens, därför måste dessa vindkraftverken placeras på höga höjder för att nå den laminärt strömmande vinden över staden, vilket ger orealistiska längder på de master som krävs, även om vindkraftverket monteras på en byggnad. För att kunna utnyttja de vindar som uppkommer i urbana miljöer bör vertikalaxlade vindkraftverk med en helixformad geometri på rotorn användas.
Konstruktion av upprätningssystem för CICLoPE
Today there is no way of measuring or simulating turbulent flow in high Reynolds numberenvironments. The computational power required to simulate these conditions is not expectedto be available for several decades so instead the CICLoPE project aims at solving thisshortage by the construction of a long carbon fiber wind tunnel in which real measurementscan be made. To do accurate measurements it is of importance that the wind tunnel, 0.9 metersin diameter and 110 meters long, is as straight as possible.This master thesis treat the design and construction of a device which may be used to align thetunnel along a reference laser beam. A design is presented which allows the pipe to be alignedwithin about a quarter of a millimeter along its entire length. Contents span over severalscience fields such as physics, mechanics, control theory and electronics.The result is a theoretically correct design.