Sök:

Sökresultat:

3605 Uppsatser om Water treatment plant - Sida 5 av 241

Analys av dricksvattenrening med metoderna Mikrobiologisk riskanalys (MRA) och God desinfeksjonspraksis (GDP)

Drinking water is produced from raw water and is either from groundwater or surface water. This thesis aims to find out if the cleaning process of raw water is sufficiently effective. This is important because consumers are otherwise at risk of waterborne infection caused by pathogens. There are three groups of pathogens; bacteria, virus and parasite. These have different characteristics which mean that they require different water treatment to be separated.

Analys av framtidens system för hantering av avloppsvatten och matavfall i Eskilstuna

Wastewater treatment is increasingly controlled by the Swedish environmental quality objectives, adopted by the Swedish parliament. There is a need for a sewage system that can fulfill stringent requirements concerning the environment, recycling and resource use and hygiene. Additional environmental aspects in recent years are the impact of climate change, new knowledge about the effects of pharmaceuticals in water, the need for improved wastewater treatment and increased recycling of nutrients to agriculture. This report has, from a future scenario of the year 2050, analyzed seven different systems for wastewater treatment and treatment of compostable biowaste from households in Eskilstuna. A future scenario was chosen based on that within a forty year period new challenges may arise which can result in higher demands on sewage treatment than those we see today. Another reason why the future scenario was established is that changes in wastewater treatment systems are slow to establish. The analysis is mainly focused on the economical aspects but environmental aspects such as emissions to receiving waters and potential recycling of plant nutrients has also been evaluated briefly.

Cleaning process of abattoir wastewater with focus on bacterial pathogens

This study was conducted at the City Abattoir in Kampala, Uganda to evaluate the cleaning process, with focus on bacterial pathogens, in a pilot scale integrated bioprocess. This consisted of four steps: anaerobic sequencing batch reactors; aerobic/anoxic sequencing batch reactors; a high performance temperature controlled methanogenesis digester and a constructed wetland. The objective was to determine if this type of cleaning process could be used to clean wastewater from abattoirs in a satisfactory way. The indicator organisms for faecal contamination, Escherichia coli and Enterococcus spp. were used to investigate in what numbers bacteria could be found in the untreated wastewater and how much that was reduced in the different steps of the cleaning process. The water was analysed for Salmonella to see if human pathogens could be found and could survive the different steps of the treatment process.

Frigörelse av fosfor från färskt, fryst och torkat växtmaterial : ett laboratorieförsök för att öka förståelsen för fosfordynamiken inom växtodlingen

Phosphorus is the single most potent contributor to eutrophication of freshwater and has also been shown to contribute to the toxic algae blooms in the Baltic sea. The dynamics and paths of losses of phosphorus from arable lands are not fully understood. It is known that phosphorus can be lost directly from plant material to water. In studies where plant material has been subjected to several freeze-thaw cycles, large amounts of phosphorus have been lost. Most studies have been conducted under field conditions, with many factors effecting the measured losses of phosphorus, such as weather and type of soil. This study was performed in a controlled environment without the presence of soil. Instead of soil, small glass beads were mixed with the plant materials in vessels, to make possible homogeneous leaching with water through the mixture of glass beads and plant materials. In this study, clover, ryegrass and dry straw were cut to pieces, approximately 2 cm long.

Varför sviktar elevers intresse för matematiki de högre åldrarna? : Vilka faktorer ger elever motivationoch lust att lära matematik?

Drinking water is produced from raw water and is either from groundwater or surface water. This thesis aims to find out if the cleaning process of raw water is sufficiently effective. This is important because consumers are otherwise at risk of waterborne infection caused by pathogens. There are three groups of pathogens; bacteria, virus and parasite. These have different characteristics which mean that they require different water treatment to be separated.

Dagvattendammars reningseffekt : påverkande faktorer och metodik för statistisk modellering

Storm water is defined as runoff from precipitation such as rain or snow. It is collected in sewage disposal systems and since it mainly originates from urban areas it can contain high levels of heavy metals, nutrients and oil etc. Polluted storm water is currently treated by different methods such as wet ponds, constructed wetlands and filter strips. This study investigates these methods, which in earlier studies have shown to give varying results regarding their treatment efficiency.This thesis has been written on commission of SWECO VIAK and was aimed at studying those parameters that may affect the treatment efficiency of nutrients and heavy metals in storm water treatment facilities (STF:s). Through literature studies the dominating treatment processes in ponds and wetlands were examined.

Membranbioreaktorteknik- en framtida lösning på Lundåkraverket? : Membrane bioreactors- A future solution at Lundåkra wastewater treatment plant?

Membrane bioreactors (MBR) combined with biological phosphorous treatment (Bio-P) has been investigated if that could be an alternative to the future expansion with conventional active sludge treatment at Lundåkra wasteWater treatment plant (WWTP) in the proximity of Landskrona, Sweden.The results showed that the surface demand in the biological treatment will be reduced with 67% with the MBR-alternative compared to a conventional activated sludge process. The nutrient removal in the MBR-solution was decreased or unchanged for nitrogen-, phosphorous- and organic parameters. However, the energy demand will increase with an estimated cost of approximately 1 million SEK annually. Moreover, the extra chemical consumption is estimated to cost 370 000 SEK annually.The disturbances caused by filamentous bacteria such as sludge dispersal could be resolved with MBR-technology because the membranes are not affected by these organisms. The Bio-P process combined with MBR-technology works if the wastewater recirculates from the membranes to an aerobic zone.In the proposal, there will be a new pre-treatment step, for instance hole screens.

Fjärrstyrd undervattensfarkost

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Optimering av B-stolpe

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Kan detektorer förebygga tågurspårning?

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Identifiering av parametrar för tillståndsbedömning av en vattenkraftstation

The report begins with a general inventory of possible technical faults in a hydropower plant and of possible fault indicating measurements. Then an investigation is made concerning a few different faults. Based on this investigation a choice on seal box condition and water leakage is made as problem for a more thorough examination, in which it is concluded that the turbine water leakage is larger when the turbine is put into operation. The examination ultimately results in a computer alarm for faults related to the seal box. Finally a few things are mentioned about flow measurement and pressure measurement in relation to the project as a whole..

Solvärme för en skola i Lerum. Studier av olika systemalternativ.

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Närsaltsdosering till luftad damm : en åtgärd för ökad TOC-reduktion hos Skoghalls Bruk luftade damm

In the process of making carton boards into Skoghall Mill, are great quantities of water being contaminated. This water has to be treated before it is possible to release into the recipient, Kattfjorden. One of the contaminations that is important to extract from the wastewater, is organic carbon (measured as TOC-total organic carbon) because microbiological breakdown can lead to the bottom becomig free of oxygen.The wastewater treatment at Skoghall Mill is done through an external wastewater treatment that is located at the factory. The biological treatment (aerated lagoon) is a 140 000 m3 water pool with surface aerator, which is give oxygen to the water. In the lagoon live microorganisms who performs the biggest part of the TOC-reduction.One problem with the lagoon is that the treatment of TOC is considerably worse during wintertime than during summertime.

Modellering och verifikation av hjulupphängning för ett ultralätt elfordon

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Hunnebergs Gård ? en förstudie av möjliga verksamheter

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

<- Föregående sida 5 Nästa sida ->