Sök:

Sökresultat:

1660 Uppsatser om Water purification plants - Sida 8 av 111

Modellering och verifikation av hjulupphängning för ett ultralätt elfordon

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Hunnebergs Gård ? en förstudie av möjliga verksamheter

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Effektivisering av Byggprocess för PEAB AB Skövde ? Med Fokus pa Fönsterprocessen.

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Är fytoremediering en realistisk metod för att rena marken runt Glasriket på arsenik, kadmium och bly?

Phytoremediation is a technique using the ability of plants to absorb pollutants in their biomass from contaminated soils and remediate it. The plants are then harvested and the soil gets purified. This method is more environmental-friendly than the normally used methods for soil remediation. Glasriket in Småland is an area with large amount of pollutants including arsenic, cadmium and lead. This area must be cleaned from these metals because of the high threat to the environment ant the health of people who live here.

Håller vindkraften vad den lovar?

The purpose of this study is to investigate how much of the estimated annual electric energy production from Swedish wind power that actually was produced, as well as the history of this agreement over time. The aim is to also examine if there are properties that have caused some group of wind power plants to produce more or less, compared to their estimated production. Operational data on wind turbines collected by the Swedish Energy Agency was analyzed. A survey was made among owners of wind power plants with a nominal power of at least 2 MW. Two different methods for normal year correction of production data were used and compared.

Företags informationsförmedling i en bostadsköpprocess

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Utformning av förfrågningsunderlag vid totalentreprenader

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Fysikalisk modell av människans spinalkanal för demonstration av skademekaniken vid whiplash-skada, del 2

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Spårning av miljöstörande ämnen i Uppsala stads spillvattennät

To the sewer systems households, industries and other activities are connected. The wastewater is collected at treatment plants where a nutritious sludge is produced. The sludge does not only contain nutrients, but also hazardous substances originating from different activities in society. To reduce the flow of hazardous substances to treatment plants and to create a sustainable recycling of plant nutrients the Swedish Water & Wastewater Association has developed the certificate system REVAQ. This certificate requires a good quality of the sludge but also that the treatment plants maps the origin of the unwanted substances.

Milk production in dairy cows and goats : a case study in the Nyando district inSouth-Western Kenya

Water is an essential factor for both people and animals, and access to water is therefore of great importance. The water access also largely determines the availability of food for people and feed for animals. The aim of this study was to survey the affect of water access on milk production from dairy animals. The study included nineteen farm visits that were made in the Nyando district in Kenya between February and Mars 2011. Farm visits included interviews with questions about for example number of dairy animals, milk production, water access, feed and water routines.

Ljusets betydelse för rotknoppars groningsvillighet i åkermolke (Sonchus arvensis L.)

This study is about how changed light conditions induce dormancy in plants. It is divided in two parts. First a literature study where quantification of light, the concept dormancy, photoperiod and light quality are discussed. Second an experimental part, where the importance of light for sprouting capacity in root buds of perennial sow thistle (Sonchus arvensis L.) is investigated.In the science in how flowering in plants are induced the concepts short day/long day plants and light dominant/dark dominant are well-established. These concepts can also be applied to how light induce dormancy in plants.

Skiftarbetets potential i byggbranschen

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Varför blev det inte som planerat? En studie över platschefers prognosarbete i anläggningsprojekt

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

"Fallbacks" - betydelsen av vandringstid för Atlantlax (Salmo salar L.) som faller nedströms vandringshinder

In Lake Vänern, Sweden, there is an endemic population of Atlantic salmon (Salmo salar L.) that lives its entire life in fresh water. The salmon is hindered from migrating to its natural spawning sites in the northern part of the River Klarälven by nine hydro-electric power plants. None of the hydro-electric power plants have fishways so that salmon migrating upstream or downstream may pass. In the current situation, the upward migrating salmon are caught in a fish trap at the most downstream located power plant in Forshaga. From there, the salmon are driven in a truck, past eight power plants and released a few kilometers upstream of the eighth power plant at Edsforsen.

Tjänligt vatten i kranen - Membranteknik gör det möjligt : En utredning av pilotförsök i Glemmingebro

Nanofiltration is a proper way of preparation of drinking water. The process has a lot in common with reverse osmosis where a semipermeable membrane is used to separate a pure water flow from the remaining water. A pilot plant was used to ensure that nanofiltration is a suitable technology for a specific waterworks station in Glemmingebro, Ystad. The purpose was also to find out if a pH-adjustment is needed for feed water in a possible full scale plant.  In this case nanofiltration is used mainly to remove sulphate and calcium since the raw water contains concentrations of these substances which exceed the limits for potable water. It is important to receive a high recovery (RC), otherwise the deliviery of water won?t be high enough.

<- Föregående sida 8 Nästa sida ->