Sök:

Sökresultat:

4841 Uppsatser om Water model - Sida 32 av 323

Famas och Frenchs två faktorer: proxyvariabler för konkursrisk?

The aim of this study is to examine whether the two factors SMB and HML in the Fama-French Three Factor Model proxy for default risk. The study is based on companies noted on the Stockholm Stock Exchange between 2003 and 2008. These companies are used to create the factors SMB and HML, as well as a default risk factor we call RMS. In a first set of regressions, we examine the explanatory power of the original Fama-French model on a set of portfolios consisting of Swedish companies of different size and book-to-market ratio. The default risk factor RMS is then added to the original Fama-French model.

Varmt Sköljvatten

In cooperate with Asko Cylinda we have developed a new heat system too short the processtime and reduce the energy consume in a dishwasher and still have it too be a class AAA.The environment and quality is important for the company too still be the number one onthe market, If they want too keep that position the product developed of new innovations willbe very important. The systems we have developed are more effective and reduce energy uptoo 25 %. The process time is reduced too less than two hours, from the today two andhalf-hour. The solutions are too heat up the rinse water and the dishwater at the same time,with a new heating system and it make are solutions unique and effective. Its good for thedish and the environment.

Adaptiv temperaturreglering av bostadshus

The control of indoor temperature must be able to handle large time constants and both measureable disturbances like outdoor temperature, and non-measurable disturbances, like waste heat from appliances. Due to cheaper microcontrollers (small computers with designated tasks) with better performance, more advanced and computation-demanding methods for control can be used.In this thesis, Generalized Predictive Control (GPC) has been implemented and tested on a theoretically derived model of a house. GPC states that a model of the system is estimated in every sample, and the control is carried out simultaneously, based on predictions of the model. Disturbances like solar radiation can be estimated and used in the control as well. The control signals are determined by quadratic programming, which makes it possible to consider conditions, for example limitations on the control signals.GPC requires a number of parameters to be defined, like model order and control signal penalty, but is relatively robust for variations in them.

Konkursprognostisering : Tillämpning av en konkursprognosisteringsmodell på små svenska aktiebolag

Bankruptcy is a problem for the society in form of high costs for including suppliers, customers, employees, investors, banks, insurance companies etc. The purpose of this study is to confirm or dismiss a bankruptcy prediction model that has been developed in a previous Swedish study, in order to predict bankruptcy with help of specific key figures. The model has only been tested in a larger perspective where the population consisted of all small firms in Sweden, in this study the model´s reliability is tested by that it instead been applied to a minor perspective, where the population only includes Stockholm. With a quantitative approach of 12 different key figures from a total of 60 Swedish smaller registered companies in Stockholm between the years 2005-2007, has been studied. The companies are divided into two groups, companies with good financial health and companies that have ended up in bankruptcy.The results shows that the model is applicable in a smaller population, but some of the key figures do not generate essential or any type of information about bankruptcy, but the majority of the key figures in the model did.

Prediktion av bostadsrättspriser i Stockholms innerstad.

A frequently asked question in real estate marketing is at what time of the year it is optimal to invest or sell. The aim of the project was to answer this question and to generate a prediction model over real estate located in the centre of Stockholm that takes seasons into account. With acquired sales statistics in Stockholm between 2010 and 2013 it was possible to perform a linear least square regression, also known as Ordinary Least Square (OLS), with describing qualities and season of sale as parameters. Statistical problems such as Multicollinearity and Heteroskedasticity have been taken into account when deriving the model. The result was a highly accurate prediction model indicating the profitability of investing in real estate during the summer and selling during the autumn..

Skiftarbetets potential i byggbranschen

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Produktivitet och kvalitet vid stickvägs- respektive beståndsgående förstagallring :

Nowadays the majority of the thinnings made in Swedish forests are done by machines, harvesters and forwarders. The most common model in thinning with a harvester is strip-road operated thinning and stand-operated thinning with one intermediate passage between the strip-roads. This study is a time study with some quality follow ups on a strip-road operated thinning model, a stand-operated thinning model with one intermediate passage between the strip-roads and a stand-operated thinning model with two intermediate passages between the strip-roads. The machines in the study were a small harvester (Forestline MPM C90) and a medium sized forwarder (Timberjack 1110). The study was made in Litsnäset outside the city of Östersund in Sweden and was made during the autumn 2007. In a lodgepole pine stand six study units (0,6 ha) were thinned with the three different models, two study units per model.

Assessing attachment models using the implicit association test

Internal working models of attachment are claimed to be unconscious structures operating outside the conscious awareness. Existing measures of attachment are almost exclusively explicit, either self-reports or interviews and it is questionable whether these instruments are able to tap into unconscious attachment attitudes. The main purpose of the present study is to develop Implicit Association Test (IAT) tools for assessing adult attachment and to examine their construct validity. Two sets of implicit attachment measures, based on the two-dimensional attachment model (Bartholomew & Horowitz, 1991), were developed. Convergent validity was assessed by examining (1) the relationship between implicit model of self and implicit self-esteem and (2) the relationship between the implicit model of other and implicit sociability.

Varför blev det inte som planerat? En studie över platschefers prognosarbete i anläggningsprojekt

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Integration av simuleringsmodeller för bränslesystemet i JAS 39 Gripen

In this final thesis two simulation models have been integrated. The simulation models are models of JAS 39 Gripen?s fuel system, software and hardware. The time consuming and costly work to develop software has made the department of fuel system to build two models in Xmath/Systembuild. The software model also simplifies the comprehension of how the software in the control computer of the fuel system works.

Produktionskostnader för flerbostadshus En jämförelse mellan JMs projekt i Region Väst och Region Öst

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Är BIM lönsamt vid projektering av ett småhus?

This report brings up the question - ?Is BIM profitable when planning a single-family home??.The methodology for finding the answer to this question is firstly to state the definitions of BIMand the company that is projecting by using the BIM-model. The answer is then obtained byanalyses of the factors of profitability with respect to: time, opportunity of revision, problemvisualization, preference adjustments and energy. A BIM-model has been made simultaneously asthe writing has proceeded to get a perception of how a BIM-model really matters for the analysis.The analysis shows that the answer for the question depends on further factors. The factors thatare mostly discussed are the company?s intentions and the complexity of the house.

Energioptimering : Resteffektkylning av mellanlager för använt kärnbränsle (CLAB) Oskarshamn

This thesis is done in cooperation with SWECO Energuide in Växjö. They have been assigned by SKB in Oskarshamn to renew their electrical power supply and the ancillary processing systems in their Central provisional storage of spent nuclear fuel, CLAB. Today in the CLAB facility, the spent fuel is cooled down with water pumps, driven by asynchronous induction motors, where the water is regulated by mechanical valves to the desired flow. After the upgrade, the engines will be powered by AC drives that can control the pumps by changing the rotational speed and thus change the water's cooling effect on the nuclear fuel. In this study, I investigated the interference AC drives causes the feeding network and how to go about averting them.

Hälsomässiga risker på vattenledningsnätet - En studie över samband mellan trycknedsatt ledningsnät och förhöjd risk för sjukdom i tre svenska kommuner

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Ansvarsfrågan vid fuktspärrsarbete i våtutrymme

This final project is an investigation about the responsibility in rooms where the walls and floors are exposed or partly exposed to irrigation of water, as a bathroom, laundry room and WC. The cost for all water damage is valued for 5 000 000 000 SEK each year. How is this possible with all information about the problem and good materials? Who is responsible? Incites had been made in the subject throw reading reports and participation in courses about how to make a room mention above. Discussions have been made with workers in the trade of making the walls waterproof.The conclusion in the rapport is about who´s responsible for the damages and will pay the cost of the renovation. The responsibility is discussed between the contractor and the insurance company.

<- Föregående sida 32 Nästa sida ->