Sökresultat:
448 Uppsatser om Waste incineration - Sida 3 av 30
Avsättningsmöjligheter för slaggrus från avfallsförbränning vid Åmotfors Energi
The incineration of waste is steadily increasing in Sweden and so is the production ofashes. The bottom ash has for many years been used as construction material inlandfills. Now many of the nation's landfills are closed and there is a great need to findanother beneficial use for the ash. Bottom ash is a gravel-like material and with itsmaterial properties it can replace natural gravel in parts of roads and surfaceconstructions. Today this use is only approved within landfill areas where leachate iscollected and checked.
Avfallshantering på byggarbetsplatser : Potential för en miljöeffektiv avfallshantering
This thesis concerns waste management on construction sites and was conducted on behalf of ICA Fastigheter.Areas of concern:How can an environmentally-efficient waste management system on construction sites be defined? What potential exists for exploiting the waste resources that are generated?How can the waste management be optimised by reducing the quantity of waste and by optimal sorting?How can the client of a project influence the waste management?The purpose of the work was to investigate sustainable waste management in the building and construction sector and to highlight waste as a resource from an environmental and economic perspective.The aim of the work was to define an environmentally-efficient waste management system, to analyse the potential that exists in waste management and to draw up guidelines for optimal waste management.The method consisted of a literature study, two visits to construction sites and four interviews.An environmentally-efficient waste management system means that the waste is managed in the following order of priority:Prevention Reuse Recycling Energy recoveryLandfill The prevention of waste is an important area that has not been adequately explored by the building and construction industry. The quantities of waste could decrease with the implementation of measures such as ordering materials in the dimensions required, prefabricated components, logistics centres with Just-In-Time deliveries, less and improved packaging and less wrapping. The reuse of waste materials and temporary apparatus as well as the use of a return pallet system are examples of reuse that reduces the quantities of waste.In most cases the source sorting work is a matter of course and the proportion going to landfill is down at a low level. The source sorting can be optimised by sorting all materials that can be reused and recycled to use them as a resource.
En effektivare källsortering för bättre materialutnyttjande - en behovsanalys
The waste fractions offered to households in Sweden differ depending on where you live. The responsibility for the waste are grounded by the Swedish law where the municipality are responsible for the collection of household waste and FTI are responsible for collecting all packages and papers that the households sorts out. A new waste regulation is under consideration where the responsibility for the household waste may change. The bulky waste from households is collected at recycling centers where the households leave it in different containers for different fractions. These recycling centers are formed different and the fractions offered in them also differ depending on in what municipality they are located.
Bygg- och rivningsavfall utifrån ett miljöperspektiv : Med fokus på EU:s avfallsmål och en hållbar avfallshantering
The purpose of this report was to identify the current waste management of non-hazardous construction and demolition waste in a few Swedish construction companies, based on the different steps in the waste hierarchy with a focus on waste prevention, reuse and recycle. Additionally, the purpose was to attempt identifying opportunities, obstacles and as well as to propose possible solutions from an environmental perspective. The method used was a qualitative study using interviews conducted through emails and phone with employees occupying positions that could answer this reports questions. The results of this report indicates that waste management of construction and demolition waste has improved, and less waste goes into landfills. The concern is that the overall amount of waste being produced is not decreasing, thus calling for actions preventing the production of waste.
Energy from municipal solid waste in Chennai, India : a feasibility study
Solid waste management is one of the most essential functions in a country to achieve asustainable development. In India, it has been one of the least prioritized functions during thelast decades. The most common ways to treat waste in India today are open dumping anduncontrolled burning. These methods are causing severe environmental pollution and healthproblems. India is one of the world?s largest emitter of methane gas from waste disposal.Since methane is a strong greenhouse gas, even small emissions have large impact on theclimate.
Avsättningsmöjligheter för slaggrus från avfallsförbränning vid Åmotfors Energi
The incineration of waste is steadily increasing in Sweden and so is the production of ashes. The bottom ash has for many years been used as construction material in
landfills. Now many of the nation's landfills are closed and there is a great need to find another beneficial use for the ash. Bottom ash is a gravel-like material and with its material properties it can replace natural gravel in parts of roads and surface constructions. Today this use is only approved within landfill areas where leachate is
collected and checked.
Bygga hus i traditionell härjedalsstil
The purpose of this degree-project was to investigate the possibilities for primary air preheating into the two smallest Waste incineration boilers of Halmstad Energy and Environment. The investigation is a pre-study which has the primary goal to evaluate technical and financial offers from companies that manufacture primary air preheater, and investigate if it is technically and financially profitable to do a purchase on primary air preheaters in the future.In the pre-study it is proposed that it is most efficient to have individual primary air preheater, one for each incineration boiler and the primary air are also proposed to be preheated by hot water in the pre-study. Further in the pre-study it is proposed that the heat-exchanger should have plain tubes instead of finned tubes, to avoid getting dirty fast. The space in the boiler-room is limited, and therefore the major problem was to fit in the primary air preheaters into the boiler-room. By comparing the different offers from the companies, the result in the pre-study shows that the offer from the company C.A.
Energideklarationer - Marknad och Kundkytta
The purpose of this degree-project was to investigate the possibilities for primary air preheating into the two smallest Waste incineration boilers of Halmstad Energy and Environment. The investigation is a pre-study which has the primary goal to evaluate technical and financial offers from companies that manufacture primary air preheater, and investigate if it is technically and financially profitable to do a purchase on primary air preheaters in the future.In the pre-study it is proposed that it is most efficient to have individual primary air preheater, one for each incineration boiler and the primary air are also proposed to be preheated by hot water in the pre-study. Further in the pre-study it is proposed that the heat-exchanger should have plain tubes instead of finned tubes, to avoid getting dirty fast. The space in the boiler-room is limited, and therefore the major problem was to fit in the primary air preheaters into the boiler-room. By comparing the different offers from the companies, the result in the pre-study shows that the offer from the company C.A.
Utredning av primärluftförvärmning till två avfallseldade pannor
The purpose of this degree-project was to investigate the possibilities for primary air preheating into the two smallest Waste incineration boilers of Halmstad Energy and Environment. The investigation is a pre-study which has the primary goal to evaluate technical and financial offers from companies that manufacture primary air preheater, and investigate if it is technically and financially profitable to do a purchase on primary air preheaters in the future.In the pre-study it is proposed that it is most efficient to have individual primary air preheater, one for each incineration boiler and the primary air are also proposed to be preheated by hot water in the pre-study. Further in the pre-study it is proposed that the heat-exchanger should have plain tubes instead of finned tubes, to avoid getting dirty fast. The space in the boiler-room is limited, and therefore the major problem was to fit in the primary air preheaters into the boiler-room. By comparing the different offers from the companies, the result in the pre-study shows that the offer from the company C.A.
Energieffektivisering av stenstadshusen - genom byggnadstekniska energisparåtgärder
The purpose of this degree-project was to investigate the possibilities for primary air preheating into the two smallest Waste incineration boilers of Halmstad Energy and Environment. The investigation is a pre-study which has the primary goal to evaluate technical and financial offers from companies that manufacture primary air preheater, and investigate if it is technically and financially profitable to do a purchase on primary air preheaters in the future.In the pre-study it is proposed that it is most efficient to have individual primary air preheater, one for each incineration boiler and the primary air are also proposed to be preheated by hot water in the pre-study. Further in the pre-study it is proposed that the heat-exchanger should have plain tubes instead of finned tubes, to avoid getting dirty fast. The space in the boiler-room is limited, and therefore the major problem was to fit in the primary air preheaters into the boiler-room. By comparing the different offers from the companies, the result in the pre-study shows that the offer from the company C.A.
Anpassning av passivhus för ett kallare klimat - teknisk och ekonomisk analys
The purpose of this degree-project was to investigate the possibilities for primary air preheating into the two smallest Waste incineration boilers of Halmstad Energy and Environment. The investigation is a pre-study which has the primary goal to evaluate technical and financial offers from companies that manufacture primary air preheater, and investigate if it is technically and financially profitable to do a purchase on primary air preheaters in the future.In the pre-study it is proposed that it is most efficient to have individual primary air preheater, one for each incineration boiler and the primary air are also proposed to be preheated by hot water in the pre-study. Further in the pre-study it is proposed that the heat-exchanger should have plain tubes instead of finned tubes, to avoid getting dirty fast. The space in the boiler-room is limited, and therefore the major problem was to fit in the primary air preheaters into the boiler-room. By comparing the different offers from the companies, the result in the pre-study shows that the offer from the company C.A.
Byggnadsfysikaliska riskbedömningar : Metod för tidig hantering av fuktsäkerhetsfrågor
The purpose of this degree-project was to investigate the possibilities for primary air preheating into the two smallest Waste incineration boilers of Halmstad Energy and Environment. The investigation is a pre-study which has the primary goal to evaluate technical and financial offers from companies that manufacture primary air preheater, and investigate if it is technically and financially profitable to do a purchase on primary air preheaters in the future.In the pre-study it is proposed that it is most efficient to have individual primary air preheater, one for each incineration boiler and the primary air are also proposed to be preheated by hot water in the pre-study. Further in the pre-study it is proposed that the heat-exchanger should have plain tubes instead of finned tubes, to avoid getting dirty fast. The space in the boiler-room is limited, and therefore the major problem was to fit in the primary air preheaters into the boiler-room. By comparing the different offers from the companies, the result in the pre-study shows that the offer from the company C.A.
En kombinerad Organisk Rankinecykel och värmepump integrerat med ett fjärrvärmesystem : Där värme- och elproduktion samt lönsamhet studeras och avfall är huvudbränslet
The demand for district heating is expected to decrease in the future, due to competition from heat pumps and energy efficiency measures in buildings. Development of existing district heating systems is therefore necessary for district heating companies to maintain market shares. This Master?s thesis describes and investigates the heat and electricity production and profitability of a combined Organic Rankine Cycle (ORC) and heat pump that is integrated with an existing district heating system. The studied district heating system is utilizing heat from Waste incineration. In Sweden waste constitute 20 % of the fuel mix used in district heating systems, and this share is expected to increase in the future.
Rationell produktion av platsgjutna stommar för flerbostadshus
The purpose of this degree-project was to investigate the possibilities for primary air preheating into the two smallest Waste incineration boilers of Halmstad Energy and Environment. The investigation is a pre-study which has the primary goal to evaluate technical and financial offers from companies that manufacture primary air preheater, and investigate if it is technically and financially profitable to do a purchase on primary air preheaters in the future.In the pre-study it is proposed that it is most efficient to have individual primary air preheater, one for each incineration boiler and the primary air are also proposed to be preheated by hot water in the pre-study. Further in the pre-study it is proposed that the heat-exchanger should have plain tubes instead of finned tubes, to avoid getting dirty fast. The space in the boiler-room is limited, and therefore the major problem was to fit in the primary air preheaters into the boiler-room. By comparing the different offers from the companies, the result in the pre-study shows that the offer from the company C.A.
Avfall på byggarbetsplatsen : statistik som hjälper platschefen
The purpose of this report is to find a model of statistics for construction and demolition waste, which makes it useful for the local manager at the building site. The intention with the model is that it will be used as a support of the local manager, to direct his project towards reduced strain of the environment. The model will also be used to make it easier to control that the claims from authority and aims for the environment are achieved. To familiarise with the subject waste handling within the building and construction sectorI have done a literature search. I have also been studying rules and regulations regarding the waste handling.