Konstruktion av förstärkare och insamplingssteg till en PSAADC i 0.25 um CMOS
The aim and goal of this work has been to design and implement a voltage reference network for a 12-bit PSAADC, Parallell Successive Analog to Digital Converter. A chip containing the design has been sent away for fabrication. Because of the long processing time, no measurement data are presented. The main specifications for the voltage reference generator is to generate stable reference voltages with low noise and a good PSRR. Efforts has also been made to minimize the power consumption..
Acceptansgränsen för solceller i lågspänningsnät : Kan den ökas?
Microproduction, also called distributed generation, is something that has become more and more popular in the electric grid. Microproduction can however lead to unacceptable performance if several units are installed in the same low voltage network. It is therefore good to know a limit where the performance of the low voltage network becomes unacceptable based on given parameters. This limit is usually called hosting capacity.In this report the hosting capacity with respect to voltage and current have been studied in three low voltage networks which are located in Falu Elnäts concession area. This has been done by simulations in a GIS-program where critical times of the grid have been simulated.
Frekvens och spanningsskalning i en inbyggd mikroprocessor; for att mojliggora implementationen av schemalaggning med stod for dynamisk frekvens- och spanningsreglering for energihantering.
Minimizing power consumption is a critical part of many embedded design projects. Thechallenge is to limit the power consumption of the system and at the same time providesatisfactory service to the user. With regards to microprocessors, the main way of limiting powerconsumption during program execution is to adjust the frequency and the voltage at which theprocessor operates.To enable the implementation of real-time scheduling with support for dynamic voltage andfrequency scaling, an exhaustive study of the Freescale i.MX31 embedded microprocessor isperformed. Specifically, the power consumption relationship to all relevant frequency andvoltage settings is investigated. In addition, to enable frequency and voltage scaling in a real-timeenvironment, a complete timing analysis of proposed voltage and frequency scaling methods isperformed and their suitability for use in real-time systems is evaluated.To integrate voltage and frequency scaling capability into OSE RTOS, a software module hasbeen developed for this operating system.
Beredning av lokalnät i landsbygd
In this thesis a rural network in Norrbotten, Sweden, has been to designed and planned with the purpose of improving distribution reliability by exchanging existing overhead lines with underground cables. General network design considerations are discussed as well as the ones for the specific low voltage grid. During the design phase the maximum power of domestic consumers has been estimated using Velander?s method. Currents, voltage drop and impedance of the network have been calculated and fuse operation and selectivity has been considered.
EMC problematik och el-kvalitet i elkraftnät
The dissertation deals with an account of actual problem, which can arise within EMC and power quality. The cause of power interruption and what can be done to minimise the power interruption is discussed. It also includes a definition of planning levels and which factors one needs to have control over to carry out a possible planning strategy and how the local distributions net could be more secure. The electrical net could be secure but no system can be free from interruption.The dissertation examines two distribution transformers: GLA40T1 (Glansås) and T399 in Tranås Energy which don?t have regulators.
Inställning av automatikermed spänningsreglerande verkani det sydsvenska 400-130 kV nätet
The voltage level in the power grid varies due to variations in load and production. Normally these variations are manageable, but they may be excessively large during a disturbance. If the voltage is too high it may damage the equipment in the grid and too low voltages may cause problems like voltage instability. The magnitude of the voltage variation depends on the short circuit power capacity of the point of interest.This problem may become lore prominent due to automatic voltage regulation that acts on shunt reactors and shunt capacitors. When the shunt reactor is connected or disconnected to the grid it may cause such large changes in the voltage that the shunt reactor starts hunting.
Spänningsstyrd underfrekvenslastfrånkoppling i elektriska kraftsystem
This report is a Master?s Thesis performed by Andreas Adolfsson and David Jacobsson atChalmers University of Technology. The purpose of this master?s thesis is to evaluate anew method for load-shedding, the voltage controlled underfrequency load-sheddingdeveloped by ABB. This report presents a comparison between conventionalunderfrequency load-shedding and this new method for load-shedding.
Framtidens elbilar utmanar nutidens elnät : Påverkan av ett ökat antal elbilar på ett halländskt elnät
The challenges facing low voltage grids are rising as an increasing number of domestic houses transition from fossil fueled heating to electricity based heating. Several environmental goals and visions have the same transition from fossil based power to electricity based power in mind for the transportation sector. One of the most important tools for this transformation is widely regarded to be the electric vehicle. With the demands of the electric vehicle pressuring the power grid, several questions arise regarding the growth of the electric vehicle market and what repercussions it may have on the grid. This paper focuses on a typical low voltage grid in southern Sweden and what effects a growing electric vehicle market may have on it. Through computer-assisted simulations based on several future scenarios regarding the EV market, this paper finds that few modifications and reinforcements are needed on this particular grid within the next 10 to 15 years.
En studie av sex ISA-system
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Dynamisk simulering av avfallskraftvärmeverk
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Rationell plattläggning. Studie av ett arbetsmoment
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Energianalys av Vikan Kross och Asfalt
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Prognostisering av höga grundvattennivåer med Chalmersmodellen
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Kvalitetssäkring av efterinjektering. En fältstudie i Nygårdstunneln
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Energianalys av lackeringsbox. Utredning av ventilationssystem med åtgärdsförslag
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.