Sökresultat:
223 Uppsatser om Voltage sag - Sida 13 av 15
Produktutveckling av dryckespump
This work is a product development of a product which facilitates enduro drivers swallowing fluid while driving. My own experience of the problem and a custom survey gave me some frames and requirements of how such a product would look. To obtain the different concepts the method of brainstorming was used where I outlined the various proposals. The basic concept was that some kind of pump would build pressure in the liquid and when the user opens the nozzle the liquid will come out without the need to use the mouth to suck. The screening phase consisted of two steps.
Dynamisk modellering av VSC-HVDC : En statisk och dynamisk modelldesign o?ver VSC-HVDC fo?r implementering i ARISTO
This thesis treats the subject of a complete steady state and dynamic model of the VSC-HVDC covering both the AC and DC system-side of the converter. The topology of the model is recreated after the scheduled transmission line in the south of Sweden, called SydVa?stla?nken. The topology covers both a simple two terminal connection as well as a multi-terminal one. This model is to be implemented in the power system simulation program ARISTO.
Optimering av ett mellanspänningsnät : Optimization of a medium voltage electricity grid
EU vill genom att använda energin effektivare sänka sina energikostnader och minska sitt beroende av externa leverantörer av olja och gas vilket leder till att miljön skyddas. Av den anledningen krävs att energieffektiviteten ökas från produktion till den slutgiltiga konsumtionen inom EU. Jämtkraft är miljöcertifierat enligt ISO 14001 och arbetar därför årligen mot uppsatta miljömål. Detta examensarbete har studerat ett av dessa mål, möjligheten att minska överföringsförluster i ett av Jämtkrafts mellanspänningsnät. Området som examensarbetet baseras på är fördelningsstation Nälden FS23.
Undersökning av exponeringsindex för bildplattesystem inför optimeringsarbete
The county hospital of Dalarna has for the last couple of years carried through a process of digitalization. The result is that within the county it exists image plate systems from two different manufacturers. In an attempt to create a tool for dose optimization and dose surveillance the county of Dalarna would like to investigate if the exposure index from Agfa and Fuji is suitable as a dose indicator. An investigation of the exposure index, S, from Fuji has already been done. This thesis has been continuing the investigation by evaluating the stability of the exposure index, lgM, from Agfa.
Utredning av variablerna som påverkar storleken på brytspänningen i lindningskopplare
Brytspänningen är den spänning som uppkommer när överkopplingsmotståndet i lindningskopplaren lämnar sitt föregående läge vid omkoppling. Storleken på brytspänningen i lindningskopplaren beror på hur stor läckinduktansen är. Är den inte känd så kan brytspänningen istället beräknas med hjälp av FEM-programmet ACE (internt ABB-program) i samband med Mathcad. I ACE beräknas först reaktanserna i p.u-enheter mellan lindningarna och hur stora de är beror på lindningslayouten. Det är tidskrävande att använda ACE och Mathcad och uppgiften är att utreda de parametrar som påverkar storleken på brytspänningen samt att ta fram en förenklad beräkning av densamma.Genom simulering i ACE av en mängd olika lindningslayouter visar det sig snart att det är alltför många parametrar som påverkar reaktanserna.
Konstruktion av datainsamlingskort för mätsystemet COMET
During test flights SAAB uses the data acquisition system COMET 16. The part of the system that receives the signals from the sensors and converts them is called KSM 15. The purpose of this thesis is to develop a data acquisition module on stacked PC/104 modules with a lower production cost. Our work has been divided into one part about analog signal conditioning and a second part with digital filtering and memory management of the sampled data. The analog part, designed of regular components like instrument amplifiers, voltage references, operational amplifiers and multiplexers, adjusts the sensors signal levels for the ADC?s that converts the signals.
Dokumentation av en experimentell biogasanläggning
This thesis is focused on identifying and documenting all electrical equipment, such as devices, power lines / cables, and connectors in the facility and also on presenting a brief technical description and information of the systems around the reactors. Furthermore there will be a brief description of LabVIEW - which is a graphical programming language- and which devices / elements are programmed. For further notification, I am not responsible for the programming of the devices in LabVIEW which I have only used as a tool in my work. The plant for production of biogas consists of four reactors of which the third reactor (Lakbädden) is connected to another reactor (UASB) where they cooperate with each other. The reactors are used for producing biogas in the form of methane gas.The reactors I and II are connected to, various electrical devices as, flow meters, temperature sensors, frequency converter and more.
Analys av mellanspänningsnätet i centrala delar av Västerås stad
The dependency of continuous electricity supply is high in the Swedish society today, at the same time no one is willing to pay for a too costly or over dimensioned power distribution system. The owners of the distribution systems are the ones responsible for this balance act of maintaining a high quality of electricity delivery to customers at a reasonable cost.In this master thesis a limited part of the primary distribution system (10 kV), owned by Mälarenergi Elnät AB and located in the city centre of Västerås, was chosen for a deeper analysis of its reliability. Its ability to handle outages of system components (N-1 and N-2 contingency analysis) was investigated to find out potential weak spots and parts of the grid that showed signs of being overdimensioned.The results of the performed simulations showed that in 74 % of the studied N-1 contingencies cases, consisting of outages of a bus bar in a distribution substation, the system could handle this without causing outages in other parts of the grid. For the N-2 contingencies 61 % passed the test. It was also found that one of the two included high voltage substations could alone supply the investigated part of the grid.
Avbrottsfri Kraft med användning av ultrakondensatorer
The supply of uninterruptible power can be applied to many areas wherecontinuous operation is highly prioritized.The application of uninterruptible power for motor operation is facilitatedusing a frequency converter. Direct current operated frequency converters canbe applied directly to the power reserve which removes the need for additionalpower-converting.Batteries have long constituted the power reserve but advancements inthe development of ultracapacitors have created a viable substitution. Ultra-capacitors have high energy storing capabilities and can be applied to highpower applications.Maxwell is a leading manufacturing company of ultracapacitors and pro-vide different modules with built-in solutions for voltage balancing. Unevenvoltages between series-connected capacitors is a phenomenon caused by vary-ing capacitance. A configuration containing Maxwell?s 56V module is createdand constitutes the power reserve in the simulations.The discharge simulation shows a significant current that could damagethe system.
Säkerhetsanalys av brandbekämpning i kritiska utrymmen på Forsmark 1
In order to maintain a high safety level at a nuclear power plant it is important not only to measure the reliability of the components and systems of the plant, but also to investigate how the plant responds to human actions. One of the most hazardous situations in managing a power plant is fire occurring in critical areas. This study concerns the prospect of the local fire brigade to suppress a fire that has started in one of the most critical rooms for maintaining high reactor safety. The model created gives an indication on the possibilities of succeeding in suppressing a fire. In order to get a more reliable fire fighting the following advice are given:- Let the fire brigade go rounds in the plant together with the personnel, during which recommended fire suppressing methods are determined to avoid long preparation time in an actual situation.- Prepare rooms with two subsystems to make them partly with no voltage.- Give the fire brigade better feedback from actual events on nuclear power plants.- Education and training in suppressing fires in electrical equipment.The probabilistic safety assessment strives to be as realistic as possible.
PSQS ? Power Supply Quality Simulator
Kitron had wishes to be able to test and measure how disturbance affects their vehicle electronic units before they have been verified by SP Technical Research Institute of Sweden in Borås. This work started with the writing of a demand specification together with Kitron for a product PSQS, Power Supply Quality Simulator, which can generate some test pulses according to a standard for electronic units to Volvos vehicles. A design proposal was developed with the help the demand specification and was verified with the help of simulations. All electric schematics was designed with the guide of the design proposal. The pulses realized in the works of this thesis are those which Kitron experienced that they have a need to test in their own premises and which are possible to generate with the means available.
Spänningsfall i 200 V 400 Hz system
Målet med examensarbetet har varit att ta fram teoretiskt underlag och en beräkningsmodell. Detta ska beskriva hur kabeltyp, kabellängd, kabelarea samt effektfaktor påverkar spänningsfallet över ett 400 Hz ledningssystem.Mätningar har utförts på två olika kablar som används i det aktuella systemet. En av kablarna var symmetriskt uppbyggd med 7 ledare, där respektive fas bestod av två ledare förskjutna 180° från varandra runt nolledaren. För att åstadkomma 115/200V 400 Hz, användes en 90 kVA frekvensomformare. Belastningen som användes var en resistiv, induktiv samt en kapacitiv belastning.
Numerisk simulering av jordtryck mot rörbro ? Med tillämpning av programmet PLAXIS
This thesis deals with numerical simulation of earth pressure against tubular bridges in the software Plaxis. Plaxis is a FEM (Finite Element Method) software based on numerical calculations for which approximate solutions are developed through an iterative process. The program is specifically designed for soil and rock mechanical tests, such as voltage and deformation calculations in soil.The Royal Institute of Technology conducted in 2005, field tests on tubular bridges of corrugated steel, which was part of Ersa Bayoglu Fleners PhD (Bayoglu Flener, 2009). She studied how two different tubular bridges deformed during installation and filling. Tests and measurements were made during filling.
RCC-Jordfelsskydd, mätmodul för övertonsanalys
The majority of all power cuts that affects individuals and communities are caused by earth faults on the power transmission lines at 10kV and 20kV level [1]. If these power cuts could be eliminated, less disturbances and interrupts would lead to large amounts of money savings.Swedish Neutral has developed such a protection system. When an earth fault occurs power is injected into the neutral point of the transformer. The RCC (Residual Current Compensation) protection calculates a compensation current exactly 180 degrees out of phase to the fault current. Doing this, the voltage at the fault location becomes very close to zero, without affecting the power transmission.The protection system can only compensate automatically for the fundamental frequency (50Hz), and manually for the 3rd, 5th, 7th and 9th harmonics.
Elektronisk motorstyrning för ottomotorer
The combustion engines in today?s vehicles are getting more and more advanced and there are increasing demands on that the engines should operate during optimal conditions. Examples of internal combustion engine parameters which may be carefully controlled are the rate between fuel and air, that this gas mixture is homogenous enough and that it is ignited at the correct moment. Moreover, the requirements of these parameters vary depending on, among other, engine speed and load. To meet these requirements in all occurring operation conditions, it is required that many subsystems work together.