Sök:

Sökresultat:

314 Uppsatser om Voltage disturbances - Sida 7 av 21

Mät och loggningsutrustning för spänningstransienter

To be able to measure high-surge voltages and transients with short rise times youneed measuring instruments with a high sampling frequency and large Bandwidth.These surges and transients occur primarily at lightning but can also occur at forexample at connecting errors at an electrical switch-gear. This report describes thework with finding two solutions for measuring and log data from these surges andtransients. One temporary solution where a measurement program has beendeveloped. A second solution where different company solutions have been analyzedto decide which fits best. For these measurement solutions two solutions for bringingdown the voltage has been used.

Komponentuppdelning av elnätetpå lokalnivå

Sweden will, in accordance with the EU-directive 2003/54/EC, move from post-regulating the electricity power grid-tariffs by using a fictitious grid, to a regulation in advance which uses the actual power grid as a starting point. For this purpose a component breakdown of the grid needs to be made to determine the value of the network and by that the tariff price that is reasonable for the network business in question to charge.The primary breakdown criteria is the voltage-level and type of region. Voltage-level is crucial for the cost and complexity of a grid-part, because the higher the voltagelevel is, there are more and stricter laws and rules to follow. This work is limited to the distributionpart of the grid, in other words voltage levels from 20 kV and below.The type of region is crucial to the type of components you can and want to use. In city environments both overhead-wires and independent substations are undesirable for both practical, safety and aesthetic reasons.

Regulatorer med styrsignalsbegränsning

This thesis studies the negative impact that control signal saturation may have on a controlled system. Different methods that are used to compensate for this problem are also studied and evaluated. Both sensitivity to disturbances and the effect the method has on the systems'ability to follow a reference signal will be examined. Stability will be discussed, but no conclusions whether the systems are stabilized or not can be drawn. Control signal saturation will lead to a slower behavior in general.

PSQS ? Power Supply Quality Simulator

Kitron had wishes to be able to test and measure how disturbance affects their vehicle electronic units before they have been verified by SP Technical Research Institute of Sweden in Borås. This work started with the writing of a demand specification together with Kitron for a product PSQS, Power Supply Quality Simulator, which can generate some test pulses according to a standard for electronic units to Volvos vehicles. A design proposal was developed with the help the demand specification and was verified with the help of simulations. All electric schematics was designed with the guide of the design proposal. The pulses realized in the works of this thesis are those which Kitron experienced that they have a need to test in their own premises and which are possible to generate with the means available.

vindkraftens påverkan på elkvaliten

This thesis concerns how the power quality in the grid is affected by the connection of wind power plants. As things are at present, Fortum Distribution AB has a number of wind turbines and wind parks connected to the own grid. As the pressure on building and connecting additional wind power is increasing, so is also the interest of how the already existing wind power generation affects the power quality in the nearby distribution grids. The study is performed by direction of Fortum Distribution AB and is limited to the 10 kV/40 kV-grid in Bohuslän, Sweden. The methods for calculation of power quality are compared to the results of a number of measurements.

RCC-Jordfelsskydd, mätmodul för övertonsanalys

The majority of all power cuts that affects individuals and communities are caused by earth faults on the power transmission lines at 10kV and 20kV level [1]. If these power cuts could be eliminated, less disturbances and interrupts would lead to large amounts of money savings.Swedish Neutral has developed such a protection system. When an earth fault occurs power is injected into the neutral point of the transformer. The RCC (Residual Current Compensation) protection calculates a compensation current exactly 180 degrees out of phase to the fault current. Doing this, the voltage at the fault location becomes very close to zero, without affecting the power transmission.The protection system can only compensate automatically for the fundamental frequency (50Hz), and manually for the 3rd, 5th, 7th and 9th harmonics.

Uljabuouda vindkraftpark turbinmodellering och stabilitetsanalys

This master thesis has been performed at Solvina in Gothenburg for Skellefteå Kraftand Vattenfall Eldistribution. The aim of it is to investigate the consequences of theinstallation of a wind power plant on the mountain Uljabuouda in the vicinity ofArjeplog. Especially the impacts on voltage and transient stability are examined.Furthermore, the amount of extra strain on the voltage regulation equipment and theneeds for increased regulation capabilities are looked into.The wind power plant is planned to be built by Skellefteå Kraft and connected to a130 kV grid owned by Vattenfall Eldistribution. The work comprehends the followingmain parts:- Theoretical studies aimed at wind turbines and power system stability issues.- Modelling of the type of wind turbines assumed to be built on Uljabuouda.- Simulations of different operation cases and analysis of the simulation results.The results from the simulations show that, as far as voltage stability and extraworkload on tap-changers are concerned, the wind power plant does not, in anysignificant manner, worsen the present conditions. The problem of overloading theline between Arvidsjaur and Vargfors is also minor.

Konstruktionsforslag for kabelprovningsutrustning av serieresonanstyp

In order to decrease the disturbance from a cable testing equipment, the company Ericsson Network Technologies in Falun determined to design a new series resonant test system with a lower frequency. The new equipment is of series resonant type with a system frequency of 500 Hz. This equipment consists of an inductor, a capacitor and a voltage source. The voltage source is the same as the old one, the cable acts as the capacitor but the inductor has to be designed especially for the new equipment. In this thesis work several air coil inductor types were examined.

Selektivitet mellan hög- och lågspänningssäkringar ? I anläggningar med transformatorer ? 500 kVA

Göteborg Energi AB är ett bolag med höga ambitioner att säkerställa ett stabilt distributionsnät för sina kunder. Med ett säkerställande följer åtgärder i form av beräkningar för komponenter som transformatorer av olika märkeffekt, hög- och lågspänningssäkringar och andra kritiska skyddsanordningar som t.ex. reläskydd. Vid ett flertal tillfällen under de senaste åren har det uppmärksammats en problematik där ett fel i lågspänningsnätet har löst ut anslutande transformator. Felet har grundat sig en svag selektivitet mellan transformatorsäkring och lågspänningssäkring.

Träbroar för järnvägstrafik

This report is a study in voltagelevel in connection with regeneration of brake energy from the tramtype M31 in Gothenburg.In the act of braking, the tram M31 uses electrical braking where the electrical motors generates energy and if possible send it back to the overheadline, where other trams in the nearby can use this regenerated energy for its own driving force. In cases where no other energyconsumers are located in the same section, there is a resistance witch task is to convert this energy into heat. The regulation of this resistance appears to cause an increase in the voltagelevel into far too high levels.Investigations of the trams regulationequipment and its construction have been done. Further have measurements on the overheadline been performed in order to map the voltagevariations during a longer period of time.The result have been showing that the voltagelevel during regeneration often is as high as 880V-920V, more extreme values have not been observed in a large scale. The values are especially high compared to the nominal voltagelevel.

Prefabricerade ramper i stålfiberbetong

This report is a study in voltagelevel in connection with regeneration of brake energy from the tramtype M31 in Gothenburg.In the act of braking, the tram M31 uses electrical braking where the electrical motors generates energy and if possible send it back to the overheadline, where other trams in the nearby can use this regenerated energy for its own driving force. In cases where no other energyconsumers are located in the same section, there is a resistance witch task is to convert this energy into heat. The regulation of this resistance appears to cause an increase in the voltagelevel into far too high levels.Investigations of the trams regulationequipment and its construction have been done. Further have measurements on the overheadline been performed in order to map the voltagevariations during a longer period of time.The result have been showing that the voltagelevel during regeneration often is as high as 880V-920V, more extreme values have not been observed in a large scale. The values are especially high compared to the nominal voltagelevel.

Metoder för kartläggning och analys av nätförluster i lågspänningsnät

An important process for grid companies in order to reduce power losses in electricity distribution grids is to figure out where and how they appear. This report describes the factors that cause power losses in low voltage distribution grids and methods for how they could be measured and analyzed. Measurement data for consumed and injected energy were collected for twelve low voltage distribution grids owned by Gävle Energi AB in order to analyze the size of the power losses and how the measurement uncertainty affects the collected data. Then models of three of the grids were created in MATLAB in order to analyze the data and the power losses were calculated to be compared to the collected data. Curve fitting were also used as a method in order to analyze the power losses from collected data.The results show that the losses in the studied grids are low.

Framtidens byggarbetsplats. Organisation och Kompetens

This report is a study in voltagelevel in connection with regeneration of brake energy from the tramtype M31 in Gothenburg.In the act of braking, the tram M31 uses electrical braking where the electrical motors generates energy and if possible send it back to the overheadline, where other trams in the nearby can use this regenerated energy for its own driving force. In cases where no other energyconsumers are located in the same section, there is a resistance witch task is to convert this energy into heat. The regulation of this resistance appears to cause an increase in the voltagelevel into far too high levels.Investigations of the trams regulationequipment and its construction have been done. Further have measurements on the overheadline been performed in order to map the voltagevariations during a longer period of time.The result have been showing that the voltagelevel during regeneration often is as high as 880V-920V, more extreme values have not been observed in a large scale. The values are especially high compared to the nominal voltagelevel.

Stålfiberarmerad betong - En ekonomisk jämförelse

This report is a study in voltagelevel in connection with regeneration of brake energy from the tramtype M31 in Gothenburg.In the act of braking, the tram M31 uses electrical braking where the electrical motors generates energy and if possible send it back to the overheadline, where other trams in the nearby can use this regenerated energy for its own driving force. In cases where no other energyconsumers are located in the same section, there is a resistance witch task is to convert this energy into heat. The regulation of this resistance appears to cause an increase in the voltagelevel into far too high levels.Investigations of the trams regulationequipment and its construction have been done. Further have measurements on the overheadline been performed in order to map the voltagevariations during a longer period of time.The result have been showing that the voltagelevel during regeneration often is as high as 880V-920V, more extreme values have not been observed in a large scale. The values are especially high compared to the nominal voltagelevel.

Att övervinna barriärer för kunskapsåterföring - En fallstudie av NCC

This report is a study in voltagelevel in connection with regeneration of brake energy from the tramtype M31 in Gothenburg.In the act of braking, the tram M31 uses electrical braking where the electrical motors generates energy and if possible send it back to the overheadline, where other trams in the nearby can use this regenerated energy for its own driving force. In cases where no other energyconsumers are located in the same section, there is a resistance witch task is to convert this energy into heat. The regulation of this resistance appears to cause an increase in the voltagelevel into far too high levels.Investigations of the trams regulationequipment and its construction have been done. Further have measurements on the overheadline been performed in order to map the voltagevariations during a longer period of time.The result have been showing that the voltagelevel during regeneration often is as high as 880V-920V, more extreme values have not been observed in a large scale. The values are especially high compared to the nominal voltagelevel.

<- Föregående sida 7 Nästa sida ->