Sökresultat:
9524 Uppsatser om VBX; Ventilation-system; Heat recovery - Sida 14 av 635
GNSS-Styrning : Information för platschefer
An investigation of the heat impact of laser cutting on the material properties when producing tensile and impact test specimens of different steel types of varying thickness has been performed. The purpose of the thesis project was to provide recommendations regarding how much material that needs to be milled from the laser cut edge before tensile and impact tests. The study has been performed partly by investigating the test specimens by heat camera when the specimens were cut in the laser cutting line and partly by performing hardness tests, investigation by microscopy, and tolerance and roughness measurements and tensile tests of the laser cut material and material produced in the traditional multi operation machine. The results show that the heat affected zone in the thicker materials is greater than previously thought of, and that the currently used recommendation has to be adjusted. The study clearly shows that the thicker the material, the greater the heat affected zone, independently of the steel type, since the thicker material takes longer time to cut.
Företags informationsförmedling i en bostadsköpprocess
Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.
Utformning av förfrågningsunderlag vid totalentreprenader
Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.
Fysikalisk modell av människans spinalkanal för demonstration av skademekaniken vid whiplash-skada, del 2
Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.
Småskalig biobränsleeldad kraftvärmeproduktion : teknik och investeringsutrymme
To achieve the requirements to decrease emissions of greenhouse gases by 20 % by 2020, Swedenneeds to increase its use of bioenergy. In doing so it seems natural that those who already haveaccess to large amounts of biofuels in the form of by-products such as straw, wood chips anddigestible materials take advantage of these assets locally. By combining production of heat withpower production at the farm it may be possible to not only reduce the direct use of fossil fuel forheating but also reduce energy costs.The purpose was to simulate different cases of using a small scale biofueled combined heat andpower plant for farm-based systems. A MatLab-model was developed and used to draw conclusionsabout the costs for production of heat and electricity with different conversion technologies.The model uses climate data to simulate the variations in heat energy demand on a day-to-day basis.The given heat demand is the base of the simulation and from this the possible electric output iscalculated. This study has focused on the impact of the following properties: electric-, heat- andtotal efficiency, fuel, fuel price and specific fuel requirements.
Elektromagnetisk och mekanisk design av en 20MW turbogenerator
At the Division of Electricity at UppsalaUniversitythere are ongoing researches, including a research concerning turbo generators.Turbo generators produce a large share of electricity in the world; however they are costly mainly due to the fact that the cooling and ventilation that are needed to eliminate the excess heat from the generators are expensive. Turbo generators work with high efficiency and in this project, the main task is to simulate a generator while taking into account that the generator must be designed against self-oscillation, centrifugal force, exhaustion and heat. The turbo generator must be simulated without being too expensive and complicated.In this project, the dimensions of the turbo generator depend on the efficiency of it, and where the losses are in the generator. Furthermore, the optimum values need to be chosen with the help of the ACE simulation program. The report begins with an introduction describing the project followed by a task description that is dealing with the project.
Sjuksköterskors kommunikation med patienter som vårdas i respirator : Nurses? communication with patients during mechanical ventilation
Aim: The aim of this study was to describe intensive care nurses? experiences communicating with patients during mechanical ventilation.Methods/design: A qualitative interview study. Interviews where analyzed using descriptive content analysisSetting: Nine intensive care nurses from two different intensive care units were interviewed using a semi structured interview guide.Background: Past research has shown that patients during mechanical ventilation in the intensive care unit, feel very vulnerable and the helplessness of being unable to speak. These patients feels that they are completely dependent on the nurses and their competence. It has been shown to be very important that the patient feels included, acknowledged and respected.Results: The analyzed data resulted in a theme; through communication strive to preserve patients´ dignity and three main categories; create relationship to the patient, minimize patients´ vulnerability and don´t give up.
Förutsättningarna för ett parallellt generation IV system vid svensk nybyggnation av kärnkraft.
A new build in the Swedish nuclear power system would entail increased re-quirements for the proposed repository, which is adapted after the reactors of today. With a fast reactor, capable of burning nuclear waste, operating in parallel with the light water reactors, the increased requirements on the repository could be reduced.In this thesis, simulations of a light water reactor and a fast reactor have been performed by using the Monte Carlo code Serpent to investigate the changes in the fuel inventory. The light water reactor in the study is a boiling water reactor and the fast reactor of the type sodium-cooled fast reactor and they have been used for three different operation scenarios.By studying the fuel composition and the results from the simulations of the three scenarios conclusions can be drawn. Conclusions regarding the change of the fuel inventory and decay heat in Clab as well as the interim storage facility and in the repository. Depending on the operation alternative the changes dif-fered significantly and especially regarding the mass of burned actinides for different fuels in the fast reactor.The lowest increase of fuel assemblies was meet when using 50 years old fuel with 20MWd/kg U burnout and 2,0 % enrichment for start up of the fast reactor and 30 years old fuel assemblies with 50MWd/kg U burnout and 4,7 % enrichment for the further operation of the reactor.The increase of the number of fuel assemblies was 3174, which is equivalent to 641tons of heavy metal.
Energianalys av luftbehandling
Elanvändningen till ventilation har ökat med 40 % sedan 1990 i Sverige. Ventilationen är en miljöbov enligt undersökningar som visar att elanvändningen till ventilationssystemens fläktar kan reduceras. Minskning av elförbrukningen kan t.ex. uppnås genom utbyte av fläktmotor till en EC-motor eller till en fläkt med bakåtböjda skovlar och direktdrift. Effektivieringsåtgärder kan ge en lägre elförbrukning på upptill 50 % i vissa applikationer.Ventilationsfläktarna i Sverige förbrukar 12,3 TWh per år.
Expansionsmaskiner istället för strypventiler - en effektivisering
In Uppsala CHP Plant, there are six pressure reducing valves to reduce the pressure from 15 to 3 bars, before six absorption heat pumps. During the process the energy is conserved but losses occur in form of exergy. The aim of this thesis is to reduce the losses of exergy. This can be done by letting turbines replace the pressure reducing valves.In this thesis an investigation has been done of the conditions today, the conditions after the change from pressure reducing valves to turbines and a comparison of three different types of turbine solutions. The three examined solutions are one turbine, several helical screw expanders and several small turbines in parallel with asynchronous generators.The six absorption heat pumps have been divided into two groups; one group of four and one group of two absorption heat pumps.
En jämförelse ur energisynpunkt mellan roterande värmeväxlare och frånluftsvärmepump i universitetsbyggnad
För att tillgodose den studerande KTH byggnadens framtida krav kommer det befintliga ventilationssystemet att bytas ut. Två olika möjliga värmeåtervinningssystem har jämförts ur fjärrvärmebehovssynpunkt. Det befintliga systemet med vattenburen batterivärmeväxlare har en låg värmeåtervinningsgrad och Akademiska Hus önskar system med högre värmeåtervinning. I byggnaden har roterande värmeväxlare och frånluftsvärmepump för uppvärmning av tilluften jämförts. Då värmeåtervinning från dessa system inte är tillräckligt kommer fjärrvärme att används.I beräkningarna jämförs fem roterande värmeväxlare mot varierande antal frånluftsvärmepumpen.
Skiftarbetets potential i byggbranschen
Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.
"Man måste vara egoistisk för att kunna hjälpa andra" : -En studie om hanteringen av service recovery på Icehotel och Björkliden
Service recovery innebär företags försök att uppväga kunders negativa reaktioner på ett misslyckande vid leverans av en tjänst. Det här är ett relativt välutforskat ämne, men fokus är nästan uteslutande på kunden och hur den ska hanteras. Kundperspektivet är dock bara en av tre delar som ingår i service recovery. Förutom att göra kunderna nöjda, behöver företag arbeta aktivt med att förbättra processerna samt ge medarbetarna rätt förutsättningar för att hantera misslyckanden och därefter återhämta sig. Det sistnämnda, kallat employee recovery, upplever vi ha blivit bortprioriterat och nonchalerat i en majoritet av tidigare forskning inom service recovery.
Varför blev det inte som planerat? En studie över platschefers prognosarbete i anläggningsprojekt
Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.
Produktionskostnader för flerbostadshus En jämförelse mellan JMs projekt i Region Väst och Region Öst
Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.