Sökresultat:
1015 Uppsatser om Utilizing waste heat - Sida 15 av 68
Energieffektivisering av Åhlénshuset i Umeå : Utredning av åtgärder för ventilation, värme och kyla
Sweden is a country that has made some progress in developing energy efficient solutions. The problem in Sweden is that many houses and apartment buildings are old and have inefficient ventilation- and heating systems. This energy is lost when systems are inefficient, which then results in huge economic costs. Luckily, more and more people are becoming aware of this, which means that Sweden is on track to become even better within energy efficiency.Energy use for the housing- and service sector amounts to 166 TWh of total use at 616 TWh. Without distribution and conversion losses, these figures show that the housing- and service sector accounts for almost 40 % of the country's total energy consumption.
Anaerob nedbrytning av TNT : Ett bioreaktorförsök på Vingåkersverken
A bioslurry reactor was built for the bioremediation of TNT contaminated waste from the demilitarization industry. The field test was conducted at Vingåkersverken in Vingåker, Sweden, to see if results from laboratory studies could be repeated in a full scale reactor. The goal of the project was to optimize the reactor to such a degree that it could be used to handle the waste produced at Vingåkersverken and also that this technique could be applied for remediation of contaminated soils. Unfortunately the samples taken during the full scale field test were destroyed by the shipping company and no analysis was possible. A later attempt by the Biorex research group has also been unsuccessful to reduce the amount of TNT using the bioreactor.
Elproduktion med ORC-teknik ombord på fartygsserien MK II.
Given that the oil prices have risen and the environmental regulations has become more stringent, the interest in operating efficiency has increased. The project has investigated the possibility of producing electricity from waste heat generated in the diesel process. One technique to utilize and convert energy into electricity is the ORC (Organic Rankine Cycle). This process is based on the Rankine process (the steam process), the difference from the traditional Rankine process is that instead of water as a working medium, an organic substance is used. The main component used in the process is a evaporator, a turbine, a condenser and a pump.
Garbage to gardens : design proposals for two decentralised waste management units in Pune, India
The population growth and urbanisation in low-income countries bring issues of poor living standards and miserable sanitation conditions onto the agenda. If well-functioning waste management systems were developed, this could master some of the problems. The already existing local informal waste handling system that is common in many low-income countries, needs to be developed with proper sorting and composting solutions to decrease the environmental burden and improve the overall situation in the dense cities.
This master?s thesis project is performed with the intention of developing functional decentralised waste management units in the city of Pune, India.
Expansionsmaskiner istället för strypventiler - en effektivisering
In Uppsala CHP Plant, there are six pressure reducing valves to reduce the pressure from 15 to 3 bars, before six absorption heat pumps. During the process the energy is conserved but losses occur in form of exergy. The aim of this thesis is to reduce the losses of exergy. This can be done by letting turbines replace the pressure reducing valves.In this thesis an investigation has been done of the conditions today, the conditions after the change from pressure reducing valves to turbines and a comparison of three different types of turbine solutions. The three examined solutions are one turbine, several helical screw expanders and several small turbines in parallel with asynchronous generators.The six absorption heat pumps have been divided into two groups; one group of four and one group of two absorption heat pumps.
Uppvärmd konstgräsplan : Beräkning av utnyttjningstid för en uppvärmd konstgräplan med alternativa rörplaceringar
For Skattkärr IF a turf field with warming has been projected to increase field?s utilization hours and to have a longer period for athletes to perform their activities outdoors. The technique chosen to heat the plan is a type of a geothermal heating system without a heat pump. The brine, which is water with 30% ethanol, collects heat from the borehole and discharges it to a coil in the field. There is at position 11 boreholes but it is planned to increase the number to 31, which is the design for the facility.
Analys av monteringslinan för luftbehandlingsaggregat (EC)
The purpose of the work is to analyze and balance an assembly line at Fläkt Woods in Jönköping. The work is going to answer the questions about today?s throughput time, how much waste that occurs, number of staff at the assembly line, how the supply of material works and possible improvements that can be made at the work stations. The work is also going to give a proposal of improve-ments that can be made.The methods used to get the result include observations and measurements, con-versations with technicians and operators and also data from Fläkt Woods? data-base.Large variations in throughput time are measured during the measure period, from 3 hours up to 5 hours and 35 minutes.
Utredning av solenergi för drivning av sorptiv kylprocess för inomhusluften på Stockholmsarenan
Cooling down the indoor air can be done in several ways. One way is desiccantcooling which will be used at the Stockholm Arena. This method is used in airhandling units that use temperature changes and moisture fluctuations in the air. Oneof the steps is to add heat during the cooling process in order to reduce the relativehumidity of the exhaust air. The air passes thru an adsorptions rotor which thenabsorbs moisture from the supply air.
Utredning av potentiella hälsorisker i samband med slagg- och slaggvattenhantering vid Hedenverket, Karlstad
In this study potential health risks for employees in connection with handling of bottom ash and bottom ash water at a Municipal Waste Incineration (MWI) plant have been investigated. Air surrounding the bottom ash and the bottom ash water has been examined. MWI is one of the primary ways to manage solid household waste, and bottom ash is the main solid residue produced by the incineration process. Bottom ash constitutes about 15-20% of the original waste. The bottom ash is extinguished in a water bath (bottom ash water).The study was carried out in a MWI plant in Karlstad, Sweden.
Det energiproducerande huset
We are heading towards a huge switch of how energy is produced with fossil fuels being replaced by renewable energy sources. It is not difficult to replace the energy you use in the house and there is no need for futuristic technology. There are already many established products on the market such as high efficiency vacuum solar collectors, heat pumps & small wind power stations that can supply the energy being used in a house. The company Sol & Energiteknik SE AB in Huskvarna has many different products which can reduce the need for an outside energy distributor. An average house in Sweden uses 15 000 kWh for heating, 5000 kWh for tap water and 5000 kWh for electricity.
Produktutveckling och prestandatest av ett vattenvärmedrivet torkskåp : Jämförelse mellan tre utvecklade versioner av ett vattenvärmedrivet torkskåp
AbstractElectricity consumption is a globally increasing problem caused by the high share of electricity produced in coal power plants. These contribute to high carbon emissions when only about 1/3 of the heat generate electricity and the remaining 2/3 of the heat cools off. Combined heat and power plants (CHP) have high efficiency because they use the residual heat for domestic heating. The CHP plant often use fuels from renewable resources, giving them a lower carbon footprint, but are also depending on the heat demand. If electric powered products such as drying cabinets convert to heat powered products more environmentally friendly electricity will be produced by CHP plants, which can supplant electricity, produced from coal power plants and reduce carbon emissions.
Kan perfluorerade ämnen i kläder bidra till förhöjda halter i reningsverk?
Perfluorinated substances (PF) are environmental pollutants that are used to coat fibres of so called ?all weather clothes? to make them water resistant. PF are effectively spread through water. Waste water treatment plants (WWTPs) are a pollutant source of these substances. PF are poisonous to different kinds of organisms, and supposedly also to human beings, if concentrations are sufficiently high.Perfluorinated substances have been investigated at three waste water treatment plants in Stockholm during the 2000?s.
Optimerande av gasanläggning - genom värmeåtervinning och förlustreducering. Gässlösa Reningsverk
The municipality, of Gatukontoret in Local government of Borås has in the long run, a required need to look after the current heating devices (the gas production plant) in sewage treatment plant, called Gässlösa. The practical work of the examination is about, trying to find a better way to take care of the current heat recovery. That may be one way or another, rather easy to implement in the existent construction.Through the work to increase the efficiency of the gas engine, implement of some external cooling system by heating exchange device. That gives an opportunity to heat (primary) the digester, (but even all internal public areas) with its own superfluous heating.The report shows that if the management group may invest 422 704 crown to implement a heat exchanging device, it gives more space to reduce the need to buy expensive external energy. Gatukontoret´s pay off time, for buying machines, is 20 years, with reservation to calculate with 4 percent internal interest, leads to the yearly mount of 31103 crowns.If Gässlösa increases the gas engine time in (effective) duty approximately (correspondingly) 48 hours a month the entire investment will generate a profit in January in year seven after the implementations.
Delta X : Utveckling av värmeväxlare
Stockholms vattenskärning AB in Kungsängen has through the acquisition of a company begun to design and produce aircraft heaters whose origin is early 1970s which follows a high inefficiency in terms of energy consumption and size.The aircraft heater, which is sold worldwide, serves its purpose for customer satisfaction and has done so ever since it was developed in the 70s.Stockholms vattenskärning AB is now investigating the possibility in making the aircraft heaters more efficient, both in terms of energy consumption but also on a more efficient design with the belief that it would lead them to an edge in the market. The aircraft heater consists of several main components whose function altogether is to keep passenger aircrafts warm while they are on the ground.This project has been limited to the further development of the heat exchanger package which accounts for the conversion of the hot medium to the fresh air being carried in to the aircraft cabin. Work has been divided into different phases in order to create a better understanding of the project range and to make it easier to divide the various elements in the time available, 10 weeks. These phases are literature review, situation analysis, concept generation, CAD, concept comparison and writing reports.After the initial literature review was made, a fundamental theory was written which is essential in understanding the remaining parts of the project.With the theoretical part as support, measurements and calculations were made on the current heat exchange package in a situation analysis to ensure its operation and efficiency.In the concept generation phase, the collected facts from the literature review was used as the basis for creating a matrix. The purpose of the matrix was to indicate the two most suitable types of heat exchangers to develop four new concepts out of.In the CAD phase the four concepts was drawn up and then described with text and images.The last phase is the concept comparison where a concept selection matrix is used to function as a decision basis for further production at Stockholms vattenskärning AB. The four concepts have been developed based on the current heat exchanger and is gradually changed into a design of a cross-flow heat exchanger constructed out of stainless sections. The purpose of this is to have gradual upgrading of the heat exchanger as an option, in order not to saturate the market..
Konvertering från luft till vätskekylning av elektronik
A Swedish electronics company wants to make the cooling of one of their electronic components more efficient. They propose that a retrofit liquid cooler is the way to achieve this goal. The current air cooling has high energy cost due to the high amount of power needed to power fans and heat exchangers. Using high volumes of air for cooling also leads to noise pollution. The conversion from air to liquid cooling would possibly make the operation of the electronics more cost efficient and less noisy.The purpose of this project is to theoretically evaluate different concepts of drawing the heat generated by the electronic component in to a fluid, using numerical calculations in Matlab and FEM simulations in ANSYS.