
Sökresultat:
659 Uppsatser om Transportable buildings - Sida 38 av 44
Statuskontroll av Paradisskolans elektriska belastning
In this thesis is studied the electrical load of Paradisskolan with respect to power quality and energy consumption. The school's owner Trollhättans Tomt AB is also interested to know if they can reduce their costs by changing to smaller meter fuses. A recurring ground fault that?s been recorded from powerpanel A1A has been investigated. The school's equipped with an electrical bonding system, harmonic filters for the third harmonic currents, TN-S system from feeding transformer and groundfault monitoring.
Fördjupad miljöriskbedömning av förorenade markekologiska system. : Integrering av kemisk, toxikologisk och ekologisk information.
AbstractThe research project Liberation, supported by the European Commission under the Environment and Sustainable Development Programme (Fifth RTD Framework Programme) aimed at developing a decision support system for ecological risk assessment of contaminated sites has proposed a tiered system including the triad method. This method integrates contaminant chemistry and bioavailability analyses with observed ecotoxicological effects in soil and groundwater. In this study the triad method was used to perform a risk characterization of a former surface treatment and metal industry, now used for the student union buildings of the Mälardalen University in Eskilstuna, Sweden. On the site, high concentrations of copper, zinc and nickel have been detected in the soil in a preliminary investigation of contaminant levels with XRF. For performing the risk assessment of the site according to the triad method, contaminant bioavailability, soil metal concentrations and soil toxicity were determined and an ecological assessment was carried out on four selected soil samples (one reference soil and three samples with low (B), medium (C) and high (D) contaminant levels). Contaminant bioavailability was measured through leaching (ISO TC 190/S7) and biouptake tests (DGT).
Att bo på Rådhusberget. Framtida potential ur befintliga hyresgästers perspektiv
Strömstad is a small city located on the Swedish west coast. Urbanization and development is acurrent issue for the municipally, as for many other in the current situation. The municipal housingcompany Strömstadsbyggen is one of the parties involved in the extensive development that mustbe implemented to meet the changes and developments which the issue holds.One area that is of interest in the discussion is Rådhusberget - this due to the existing infrastructureand unique qualities that the area holds. In order to achieve the best solutions possible for the area,Strömstadsbyggen wishes to listen to what the existing tenants at Rådhusberget thinks and feelsregarding the area and its future potential.This thesis has therefore been carried out in collaboration with Strömstadsbyggen and has beenaimed at identifying the current tenants' thoughts and opinions in the existing area of developmentand infill potential. The aim of this work was also to investigate how the tenants value their homeand local environment in its current state, and what their wishes are for the possible futuredevelopment of Rådhusberget.To achieve analyzable results concerning how the tenants perceive these aspects, an extensivesurvey have been carried out which were sent out to all tenants in the area.
Millesgården : vårdprogram samt förslag till förbättrad tillgänglighet
Millesgården is a museum on the island of Lidingö outside Stockholm. It contains the buildings which were the home and studios of the artist Carl Milles and his artist wife Olga. It also contains the grounds that originated as the garden of their home. Carl Milles later developed the garden into a sculpture park where a great part of the sculptors works are on display. In this report only the sculpture park is treated.
LCC-analys av FTX-system : En jämförelse av centralt- och lägenhetsplacerat
This report is the result of a thesis conducted at the consulting firm Bjerking AB andis the final part of the Bachelor Programme in Construction Engineering at Universityof Uppsala. The work aims to investigate the costs and how the choice of ventilationsystem affects building projects during a long-term period. This report covers costssuch as investment, maintenance and energy but also how they affect residents andbuilders. Building regulations for energy consumption are expected to be tougher;therefore a comparison of two different heat recovery ventilation systems(HRV-system) was made. One system is based on a centrally placed unit that coversthe whole buildings ventilation through vertical shafts.
Standardisering av brukarrelaterade indata för energiberäkningar på kommersiella lokaler
In this thesis, input data for energy performance calculations on commercialpremises have been studied. In energy performance calculations, where internal heat gain parameters are unknown, template values that, in a reasonable way represent the activity in the room, are necessary. These values can be used as input data for whole-year calculations, or for calculations on shorter periods of time.The purpose of the Sveby project is to create standardized work practice in energy issues for the construction industry. The work in this thesis is conducted to correlate with the purpose of the Sveby project, with aims of contributing with information and guidelines for the continuing work with commercial premises.In this report, suggestions for template values for internal gains parameters, based on research and calculations in the field are presented. Suggestions on how these can be implemented in a user-friendly way for two energy performance calculation software are also given, VIP Energy and IDA ICE.
KORTSIKTIG PRODUKTIONSPLANERING I MINDRE FJÄRRVÄRMESYSTEM : En studie vid Strängnäs Energi AB
District heating covers around 80 % of the heating demand in apartment buildings and 10 % in single-family homes in Sweden. In the year 2010 the total input of energy to the Swedish district heating grids was about 70 TWh, which corresponds to 11 % of the total energy input to the whole energy system in the country. Through the combined production of heat and power the CHP-plants often reaches an efficiency of 90 % from energy in the fuel to produced heat and power. In order to keep the efficiency high it is important for the owners of the plant to have good knowledge about the plants performance at different operation points. Strängnäs Energi AB initiated this diploma work together with FVB Sverige ab in order to come up with a program for short term planning of the production of heat and power at the company´s CHP-plant.The work consists of three main parts.
Slöserijakt i betongdjungeln : En tidseffektivisering av monteringsprocessen inom stål- och betongprefab
The different aspects of each individual construction project such as the general conditions, design and economic restrictions as well as many more factors mean it is difficult to standardize building processes or plan in detail based on past experiences. As a result operational efficiency is often reduced, and unnecessary waste is generated. To make an organization more efficient and therefore reduce waste production everybody involved needs to appreciate and understand the improvements that can increase the organization?s efficiency. To investigate these improvements a time study was performed on two different construction sites, both of which involved buildings being constructed of prefabricated steel and concrete elements.
Utredning av energieffektiviseringspotential i ett flerbostadshus : Avseende på injustering av värmedistributionssystemet och installation av värmepump
The different aspects of each individual construction project such as the general conditions, design and economic restrictions as well as many more factors mean it is difficult to standardize building processes or plan in detail based on past experiences. As a result operational efficiency is often reduced, and unnecessary waste is generated. To make an organization more efficient and therefore reduce waste production everybody involved needs to appreciate and understand the improvements that can increase the organization?s efficiency. To investigate these improvements a time study was performed on two different construction sites, both of which involved buildings being constructed of prefabricated steel and concrete elements.
Vårdprogram för Österby bruks köksträdgård :
Svenska (engelska se nedan)
Detta examensarbete är ett vårdprogram över Österby bruks köksträdgård. Österby bruk är beläget i norra Uppland cirka fem mil norr om Uppsala. Redan på 1500-talet började järnindustri växa fram på Österby. Österbys järnindustri kom att pågå fram till nedläggningen av Österbyverkan 1983. Dagens köksträdgård tillkom i och med den omgestaltning av hela herrgårdsanläggningen som startade på mitten av 1700-talet.
Internationell Upphandling av Byggmaterial : En studie över materialimportens potentiella tillämpning hos medelstora och stora byggentreprenörer
High housing- and construction costs is a fact in Sweden today. Prices on building materials more rapidly than producer price index for industrial goods. Prices tend to rise during market boom but does not adapt during diminishing demand. The effects of fading demand can rather be deduced through discounts and quotations. During 1992-1998 when the Swedish construction sector found it self in severe crisis the prices of construction materials kept rising more rapidly than PPI for industrial merchandise.
Utvärdering av VAV i nybyggt kontorshus
VAV (Variable Air Volume) system has been studied in a newly constructed office-building. The goal for the study has been to evaluate how the ventilations system work in practice, if adjustments can be made to achieve an more energy efficient system and to evaluate if other alternative ventilation systems is to be preferred in the further.The degree project has been executed at Helenius Engineering Firm who is working with the environment, media systems, HVAC and energy in buildings. The building that has been studied is owned and operated by Akademiska hus.Literature studies, visits at site, inventory, review of system documentation, energy analyses, interviews, key figures, LCC, sand energy- and indoor climate simulations has been made to study the building. Where appropriate some tools from Six Sigma have also been used.How to achieve an energy efficient system and a pleasant indoor climate is studied with human health and well-being as base for the indoor climate requirements. Technical support systems such as ventilation systems have to be designed so that an acceptable indoor climate can be achieved.
Metod för användning av Geografiska Informations System vid långsiktig vägplanering : en studie genomförd på Sveaskogs marker i Norrbotten
The forest industry is one of the most important industry branches in Sweden. Since the demand of high precision wood deliveries has increased, the demand on a well constructed forest road net also has increased. A good road net gives the wood-supplier competition advantages and also increases its service level towards its customers, lumber-mills and pulp-mills. In some parts of Norrbotten, the road net is still insufficient and not yet built out enough, and that is why it is important to know how to act and where to improve the road net in these areas.
The purpose of this thesis was to create a work-model for long term road planning in areas with no road net or a not yet complete road net. The model has been created in an ArcGis environment, where a long chain of tools has been tied together with the program ?Model builder?.
Energiberäkningar för passivhus
AbstractClimate and environmental issues are of paramount importance. Researchers agreethat we must all contribute to a reduction of gases that contribute to climatechange. Energy consumption must decrease within all sectors and the promotionof renewable sources of energy must be introduced.Each sector should aspire to decrease its energy consumption. Energyconsumption is strongly linked to waste gases that contribute to climate change.Passive houses are a part of the construction industry's methods to attain energyconservation.Passive houses are derived from low energy houses and super insulated houses. Apassive house is intended to obtain heat from the inhabitants and through theiractivities.
Hållbar stadsutveckling : En utopisk vision eller realistisk framtid?
The aim of this study is to make clear the conception ?Sustainable Urban Development? through an investigation dealing with how the sustainable goals are attained in today?s Swedish urban planning. And also try to clarify where and why sustainable development is failing or lacking. Besides that I have investigated how actors take position towards urban sustainability. The essay is based on a literature study about sustainable urban development and it?s changes through the time and place.