
Sökresultat:
7871 Uppsatser om Time schedule - Sida 33 av 525
Byte av kontaktdonsgränssnitt för Scania bromssystem
This master thesis was carried out at Scania in Södertälje, Sweden. It investigates the possibility of changing a connector interface that is used when there is a need for splicing the wheel speed sensor and thereby determine the consequences.The problems that exist with the current connector interface occur during assembly, as more time is required to complete a connection in a reliable manner. A complete connection requires joining the male and female connector, insert the connection into a protective retainer and then strap a cable tie on each end of the retainer. This process makes it more time consuming and it requires 20-30 seconds to complete the connection. Solving this problem would save time and enable easier assembly, therefore resulting in economical benefits.This thesis was accomplished through discussions with different sections at Scania, studying available documentations, observations during assembly, writing a requirement specification and contacting suppliers.The aforementioned methods resulted in four connector suggestions, the DT and DTMH connector from Deutsch, MCON connector from TE connectivity and MLK connector from Kostal, each of them compliant with the set demands of the surrounding environment.
Projektplanering inom konsultföretag : en modell för planering, budgetering och uppföljning
BackgroundToday a common approach to solve a complicated problem is to assemble a temporary workforce in order to solve the problem by working together within a project. One of the difficulties with working in projects is to maintain the planned budget. Working hours and costs are often exceeded. Many companies presume that any certain project will succeed, a presumption that leads companies not to anticipate risks involved in a project. In companies today there is seldom time for evaluation or moderation of a project, in order to have time for evaluation there is a great need for an adequate planning of the project.IntentThe intention with this study is to create a model for planning, budgeting and evaluation of projects within consultancy companies.MethodWith the help of interviews and discussions within the group Hamnar och Byggkonstruktioner at Sweco has evidence to present a proposal on planning, budgeting and monitoring been developed.ResultsA model has been developed to ease for consultancy companies to plan, budget, monitor and evaluate projects.
Optimizing amount of straw for growing-finishing pigs : considering time spent in manipulative behaviour
In support to a decision to be made by the Swedish central competent authority on a minimal amount of straw for conventional growing-finishing pigs, a study using 168 pigs provided 7 different amounts of straw (20, 40, 60, 80, 100, 200 or 300 grams/pig/day) was performed. The straw was provided either once or four times per day. Detailed behaviour observations were made using focal animal sampling and continuous recording for one hour between 9 and 10 am and again between 3 and 4 pm. The data analysis is presented in three ways: broken stick model, polynomial trend line and logarithmic trend line. No method was suitable on its own but the use of all the methods simultaneously was found to portray the data in the best way.No significant differences were found when comparing pens provided with straw once or four times per day.
Införande och systemanpassning av Process Engineer i målerifabriken, Saab Automobile AB
Real-time systems are required to answer to external stimuli within a specified time-period. For this to be possible, the systems behaviour must be predictable. The use of active databases in real-time systems introduces unpredictability in the system, e.g. due to their use of active rules. The behaviour in active databases is usually specified in ECA-rules.
Matvanor och attityder till mat och måltider hos lastbils- och långtradarförare.
The purpose of this study was to evaluate meals and eating in one day for at least ten truck or lorry drivers. Another aim was to investigate the attitudes by the drivers to food and meals and their expectations on the meals. This is a qualitative study conducted in ten interviews, seven of which were over the phone. The interviews were semi-structured and took about twenty minutes for each driver. Data relating to the food choices for one day were collected and questions asked about their attitudes to food and meals were collected simultaneously.
Vad är ett lyckat projekt ur ett intressentperspektiv? : En studie av Trainee in TIME
AbstractThe concept project is today used in several contexts and has different meaning in different contexts. Lately, projects have been seen as a form of organization and more companies convert from traditional organizing to organizing in a project form. The purpose and focus of today?s project is not only to increase quality and competence development for management but also to integrate different actors in order to e.g. increase customer value.LänsTeknikCentrum AB (LTC) in Jönköping is running different projects in order to support companies in Jönköping County.
Automatisk rengöring av Primary Charge Roller : Invegon Equip AB
Real-time systems are required to answer to external stimuli within a specified time-period. For this to be possible, the systems behaviour must be predictable. The use of active databases in real-time systems introduces unpredictability in the system, e.g. due to their use of active rules. The behaviour in active databases is usually specified in ECA-rules.
Nya regler i sjukförsäkringen - fler personer i utanförskap?
The purpose of this paper is to study the rules of the bill 2007/08: 136 "Areformed sick-leave process of increased return to work" as related to therehabilitation chain. In the interpretation of the material I have used the ?practicallegal method? and a minor empirical study has been conducted to find out howRegion Skåne and UMAS adjust their activities to the new regulations.The government aims to reduce sick leave and on March 19, 2008,the above mentioned bill was presented to the Riksdag. The bill is a part of thegovernment's package of measures and contains proposals for a revised sick-leaveprocess. The rehabilitation chain is a part of the package and includes actions witha tighter schedule.The employer is still after the new rules playing a central role in thesick-leave process and must through early and continuous contact with theworkers start the rehabilitation process.
INFORMATIONSSYSTEM FÖR PALLHANTERING : Pallet management software
BackgroundToday a common approach to solve a complicated problem is to assemble a temporary workforce in order to solve the problem by working together within a project. One of the difficulties with working in projects is to maintain the planned budget. Working hours and costs are often exceeded. Many companies presume that any certain project will succeed, a presumption that leads companies not to anticipate risks involved in a project. In companies today there is seldom time for evaluation or moderation of a project, in order to have time for evaluation there is a great need for an adequate planning of the project.IntentThe intention with this study is to create a model for planning, budgeting and evaluation of projects within consultancy companies.MethodWith the help of interviews and discussions within the group Hamnar och Byggkonstruktioner at Sweco has evidence to present a proposal on planning, budgeting and monitoring been developed.ResultsA model has been developed to ease for consultancy companies to plan, budget, monitor and evaluate projects.
Ständiga förbättringar hos Drive Sol Worldwide AB
The purpose with this report is to give structure to the storage area betweenproduction and packaging at Spaljisten AB in Åseda. The purpose is also to givesuggestions for improvements of work tasks and thereby simplify and improve thematerial handling at the packing process.The background of the task is that Spaljisten AB is going to increase theirproduction and thereby they also need to increase the packing rate of theirproducts. They will manage this by installing a new automated packing line andincrease the efficiency of the old manual one. The theoretical background ismostly obtained from literature which contains relevant facts for our report.The storage area has been studied visually in order to search for improvements oftoday?s layout.
Design och implementation av konfigurationsverktyg för funktionsblock
Abstract In high voltage substations there is an increasing demand for computerized equipment, and automation of operation and supervision. The future primary equipment will provide the possibility to collect more information and to provide better control for improved effectiveness. Since ABB has got a large customer target, each product must be custom made to fulfil the customers (often from different countries) demands. Later these products will be configured by engineers who may not be familiar with the tools used at ABB. This is a very expensive and time consuming.
RA Detect - Antikollisionsskydd förlantbrukssektorn
SecRePac is a household appliance that simplifies sorting of packaging such as milk, juice and yogurt containers. By shredding the packages SecRePac reduces its volume uptake both in the home and at the recycling station. This leads to minimization of both transports to the recycling stations and truck transport for emptying the containers at the recycling station.The greenhouse effect deteriorates and becomes worse and worse leading to extreme climate changes and natural disasters such as floods as an example. Carbon dioxide emissions are the major reason for this and at least 30 percent of all these emissions come directly from transports. In the EU carbon emissions has decreased in the past few years.
Internetanvändning och dess påverkan i våra liv : Hur man kan förbättra sin användarupplevelse
The usage of internet is growing significantly every year in today?s society and whether you like or not, the internet has an influence in your life. It is therefore important to find out how people are affected by its use. We have through our study interviewed a number of people that uses internet on a day to day basis, who have agreed to live without internet access for a period of time. We started out by interviewing these people about their internet usage and what it means to them, then proceeded with their non-internet access period.
Smart seed : fördröjd groning hos raps : försök med frö-coating samt litteraturgenomgång om frögroning, coating och praktisk tillämpning i reläodling
Oilseed rape constitutes a good break crop within a cereal dominated cropping system. The normal sowing time for winter rape in Sweden is August. It's a time in the cropping year characterized by a heavy work load, such as harvest and soil management. In addition, it is often a period with large precipitation. Thus, it is sometimes problematic for the farmer to do the sowing of winter rape at the optimal time.
Pamiro
This report describes the work with creating a CMS (Content Manager System). A CMS is a web tool so you easy can publish materials on your web page. With a CM Scan you can without any knowledge of programming web pages create and maintain a web page. This will result in that you and your organisation save time and money. You can also split the responsibility for the webpage in different roles, but still keep the control.