Sök:

Sökresultat:

1 Uppsatser om Tillverkningslayout - Sida 1 av 1

Utveckling av en ny tillverkningslina

This report contains results of our study at CTC in Ljungby. CTC produces heating products such as boilers, heat pumps and additional products to their heating systems.The purpose of the report is to make a proposal how CTC will supply their new production line for heat pumps with materials. The proposal includes a production layout and a scheme for how to place the material in the production storage.The new production line will produce two different products and both of them have several variants. The line will also have a mixed flow, so the products can be produced in a random order. These conditions demand that the production line has great flexibility and that the material to all the variants can be stored in the production storage.With these conditions as input we made a layout proposal to the company.