Att planera ett storskaligt krishanteringsprojekt : En fallstudie om MSB:s ebolainsats i Västafrika 2014-2015
In 2014-2015 a large-scale Ebola epidemic occurred in West Africa. The Swedish Civil Contingencies Agency was given the order to conduct the Swedish response. The purpose of this case study was to investigate the impact on project planning of the three factors: the nature of the crisis, political initiative and developing countries. In this case study the crisis was an epidemic, and the project was initiated by the Swedish Government and conducted in two developing countries. The results were intended to contribute to developed understanding and recommendations for future project managers in similar projects.
Riksintressen för kulturmiljövården. Kritisk genomgång av fördjupade riksintressebeskrivningar
In Sweden, the main responsibility for urban planning lies with the municipalities. The county administrative boards are responsible for clarifying the governmental interests for the municipalities. The main purpose of this essay was to study documents with descriptions of national heritage areas in order to examine whether certain problems within these documents are still present in the most recent ones. This was done by comparing old documents with new ones. The problem with these kinds of documents has been the lack of clarification of cultural values in national heritage areas.
Idéträdgården Lucus : som koncept, arbetsprocess och fenomen
During the autumn of 2007 I attended a course in plantcomposition in Alnarp. The main task during the coursewas to make a proposal for a theme garden that was goingto represent the school at an exhibition in the GardenSociety in Göteborg, during the summer of 2008. Thetheme for the garden was set to ?sustainable development?and we had fully two weeks to work with the proposal.I won the competition and during the spring andsummer of 2008 I developed and realized my idea. Thegarden exhibition was inaugurated the 28th of June andwas open until the 28th of September.
Energieffektivisering av modern tillbyggnad till äldre skola : fallstudie från Österbyskolan i Österbybruk
The Swedish government has introduced a goal to reduce the energy intensity by 20% to the year 2020. To reach this goal actions need to be taken throughout the energy sector which includes residential and commercial buildings. This thesis considers the possibility to reduce the energy usage in a building located close to Uppsala. The analyzed building is a combined office, cafeteria and entrance and was completed about half a year before this project started. Therefore the measures presented for a more energy efficient building are presented as measures for future constructions.Simulations have been made in VIP-Energy, a dynamic energy calculation program.
Uppföljning av förstärkningsobjekt utfört med aktiv design
AbstractIn the fall of 2003 a project was started in the Swedish building sector that is called BASTA (the building sectors’ termination of especially harmful substances). The project is operated by the building companies NCC, Skanska, PEAB and JM, the Swedish Building Industry and the Swedish Environmental Institute IVL. The purpose of the project is to create a common environmental assessment system for the entire building industry and with the help of this system phase out the use of especially harmful properties from building products.In a large sense BASTA works like this; On the BASTA web site there is a database, to which a supplier can register the company and the company’s products. Only those products with a substance content that fulfil the demands of the BASTA system, is to be registered. As it is the supplier himself that carries out the registration of the company and the company’s products to the system, the BASTA-organisation annually controls that the companies that are registered in the database, fulfils BASTA’s demands.Since NCC is one of the companies that operates BASTA, BASTA is probably going to be the environmental assessment system that is recommended for the company in the future.
Kollaps av GC-bro S950 i Kil. En analys av brons verkningssätt
AbstractIn the fall of 2003 a project was started in the Swedish building sector that is called BASTA (the building sectors’ termination of especially harmful substances). The project is operated by the building companies NCC, Skanska, PEAB and JM, the Swedish Building Industry and the Swedish Environmental Institute IVL. The purpose of the project is to create a common environmental assessment system for the entire building industry and with the help of this system phase out the use of especially harmful properties from building products.In a large sense BASTA works like this; On the BASTA web site there is a database, to which a supplier can register the company and the company’s products. Only those products with a substance content that fulfil the demands of the BASTA system, is to be registered. As it is the supplier himself that carries out the registration of the company and the company’s products to the system, the BASTA-organisation annually controls that the companies that are registered in the database, fulfils BASTA’s demands.Since NCC is one of the companies that operates BASTA, BASTA is probably going to be the environmental assessment system that is recommended for the company in the future.
Dimensionering av en bågbro i limträ. Konstruktion och utformning
AbstractIn the fall of 2003 a project was started in the Swedish building sector that is called BASTA (the building sectors’ termination of especially harmful substances). The project is operated by the building companies NCC, Skanska, PEAB and JM, the Swedish Building Industry and the Swedish Environmental Institute IVL. The purpose of the project is to create a common environmental assessment system for the entire building industry and with the help of this system phase out the use of especially harmful properties from building products.In a large sense BASTA works like this; On the BASTA web site there is a database, to which a supplier can register the company and the company’s products. Only those products with a substance content that fulfil the demands of the BASTA system, is to be registered. As it is the supplier himself that carries out the registration of the company and the company’s products to the system, the BASTA-organisation annually controls that the companies that are registered in the database, fulfils BASTA’s demands.Since NCC is one of the companies that operates BASTA, BASTA is probably going to be the environmental assessment system that is recommended for the company in the future.
Ekologisk gestaltning : en utvärdering av hur landskapsarkitektur påverkas av ett ekologiskt förhållningssätt
This paper examines and compares several different sites in Sweden in addition to one in Mexico regarding whether the ecological requirements theses sites have had during planning and construction has affected the design in any way. Is it possible that, for different reasons, one thinks ?like nature? when one thinks of ecology and, if true, how does this reflect on the spatial and structural design? This paper tries to identify if some sort of general design expression is used in projects with requirements on ecological sustainability. In total, five projects have been compared in different areas such as choice of materials and their composition.
These projects have an ecologically sustainable processing of water in common, although most also have ecological consideration in other areas as well.
Fuktens påverkan på utegipsskivor under byggtiden
This thesis is a study of humidity at Knauf Danogips external plasterboard. The study is performed at the building project Kv. Maskinen in Jönköping in cooperation with NCC Construction AB and Knauf Danogips. The measuring was performed during five winter/spring months to see how the weather influenced the plasterboard.The measuring was performed at a small two-storied building and a larger fourstoried building. From the buildings` placement were a couple of measuring dots selected and to get a good result was the dots located in the four cardinal points.
Goal-Oriented Action Planning : Utvärdering av A* och IDA*
Goal-Oriented Action Planning (GOAP) är en AI-arkitektur som tillämpar ett måldrivet beteende åt agenter i spel. Mål uppnås genom att planer med åtgärder genereras med hjälp av en sökalgoritm. Syftet med denna rapport är att undersöka hur två sökalgoritmer, A* och IDA*, presterar under planering i GOAP.De experimenten som används är dels en miljö där agenter simuleras, samt ett test där planer genereras för samtliga implementerade mål utan rendering och simulering av agenter. Data som utvärderas är bl.a. planeringstiden, antal besökta noder under sökning och genererade planer.Utvärderingen visar en tydlig fördel till A*, som i snitt är 38 % snabbare än IDA* vid planering av åtgärder i GOAP.
En jämförelsestudie av koldioxidsläpp för en byggnad med trä- respektive betongstomme ur ett livscykelperspektiv
The goal with this examination thesis is to investigate the difference in carbon dioxide emissions between a building with a wooden versus concrete carcassing from a life cycle perspective. The huge amounts of carbon dioxide released into air from human activities must be reduced to prevent serious consequences. A way to limit this issue is through performing a comparative study where the result shows which of two products with the same function has the lowest emission of carbon dioxide, whereof the product with the lowest carbon dioxide pollution can be chosen.To be able to perform a study like this an object has been chosen and studies about life cycle analyses have been done. The rental square meter, the thermal conductivity value, the energy requirements and the placement of the building has been set equal in both framework types. There were solely dissimilarities of the two buildings taken into account when this comparison study was performed.The result of the study is that a building constructed with a wooden carcassing has the lowest amount of carbon dioxide emissions.
Energieffektivisering av fastighet från 1930-talet : Utredning av energianvändningen och energieffektiviseringsåtgärder för Tången 2
Tången 2 is a building situated in Stockholm, Sweden. It´s built in the 1930s and contains both residences and businesses. The property owner, Diligentia AB, wants to lower the energy use in Tången 2. This report consists of an energy audit which clarifies the specific circumstances linked to Tången 2. Collected knowledge is then used, together with the results from the literature study, to decide energy measures to proceed with.
Konceptgenerering - Lossningsmekanism för höjdjustering av nackstöd
Rapportens syfte är att arbeta fram förslag till en hållbar förnyelse av bostadsområdet Gulsparven i Trollhättan, på uppdrag av AB Eidar Trollhättans bostadsbolag. I dagsläget har området energirelaterade problem och är i behov av upprustning. För att komma fram till goda lösningar har litteratur- ochinformationsstudier, intervjuer med erfarna personer samt inventeringar av området gjorts. Förslagen åskådliggörs i form av ritningar samt 3D-vyer.Fyra förslag till förnyelse har tagits fram med olika grad av åtgärder, där två av dem kräver en omprövad detaljplan. Generella åtgärder, vilket gäller i samtliga förslag, är betydelsefulla lösningar för att växa mot rollen som ett hållbart bostadsområde.
Undersökning av Scilab för modellbaserad design
Rapportens syfte är att arbeta fram förslag till en hållbar förnyelse av bostadsområdet Gulsparven i Trollhättan, på uppdrag av AB Eidar Trollhättans bostadsbolag. I dagsläget har området energirelaterade problem och är i behov av upprustning. För att komma fram till goda lösningar har litteratur- ochinformationsstudier, intervjuer med erfarna personer samt inventeringar av området gjorts. Förslagen åskådliggörs i form av ritningar samt 3D-vyer.Fyra förslag till förnyelse har tagits fram med olika grad av åtgärder, där två av dem kräver en omprövad detaljplan. Generella åtgärder, vilket gäller i samtliga förslag, är betydelsefulla lösningar för att växa mot rollen som ett hållbart bostadsområde.
Att bygga varsamt i det bohuslänska bergslandskapet
Rapportens syfte är att arbeta fram förslag till en hållbar förnyelse av bostadsområdet Gulsparven i Trollhättan, på uppdrag av AB Eidar Trollhättans bostadsbolag. I dagsläget har området energirelaterade problem och är i behov av upprustning. För att komma fram till goda lösningar har litteratur- ochinformationsstudier, intervjuer med erfarna personer samt inventeringar av området gjorts. Förslagen åskådliggörs i form av ritningar samt 3D-vyer.Fyra förslag till förnyelse har tagits fram med olika grad av åtgärder, där två av dem kräver en omprövad detaljplan. Generella åtgärder, vilket gäller i samtliga förslag, är betydelsefulla lösningar för att växa mot rollen som ett hållbart bostadsområde.