Sök:

Sökresultat:

1110 Uppsatser om Sucrose-solutions - Sida 11 av 74

Fruits of knowledge : a literature review of marketing strategies and mango production in Kenya

This report is a literature review that aims to describe marketing contexts for mango production in Kenya. The institutional conditions in the country are not well developed for marketing purposes, which causes many difficulties and problems for the society. In Kenya most mango producers are poor small-scale farmers with limited resources. Mango is a perishable commodity and to keep its value and quality it is essential to have the opportunity to sell the mangos in the right time. Inefficient and undeveloped infrastructure and marketing systems hinders the mangos to reach the market in time though, which causes large losses of produce.The Kenyan mango production has increased during the last decade but due to market losses for the producer, the small-scale farmers? profits have not improved.

Development of Liquid Cooling for PCs

In recent years, existing solutions for cooling personal computer CPUs have been supplemented by a new product category, factory sealed water cooling loops. These systems, consisting of a water block with an integrated pump, a fan and a radiator, perform well compared to the air cooling solutions but are less effective than larger, custom-built water cooling systems.This project aims to explore the most important aspects of a factory sealed system and to identify possible cost-effective enhancements of the performance.The most significant differences between the different groups of water cooling loops are the block design and the pumping power. The performance of both categories is also largely dependent on the fan power, but increasing fan power has a large negative impact on the noise level.Both radiator size and fan model choice appear, in tests, to be relatively unimportant, presuming that the noise level is kept constant. The position and direction of the fan, however, has significant impact on both the temperature and the sound level.Water blocks can be designed in several different ways, both regarding the heatsink design and the flow direction. In simulation, flow with the inlet centered above the heatsink result in considerably lower pressure drop and slightly higher temperatures than flow through the block, for heatsinks with fin arrays.Creating a competitive product in this product segment certainly seems possible, as there are performance-increasing changes to be made that seemingly has little impact on the production cost.

Information ochmaterialflödesförbättrings analys

This examination work is performed at the institution of industrial economy and production at Jonkoping technical university, for JELD-WEN Door Solutions plant in Forserum.Today the focus in the company is on to reduce their inventories binding of capitals as well as inventory of products and that includes to get a good control of the supply and handling of material which is of great importance.JELD-WEN Door Solutions is one of the worlds leading producers of windows and doors and the head-office is located in Oregon, USA.A great number of wooden doors are manufactured by the company in varying of constructions, classifications and performance.The production of the plant in Forserum has a project- and customer focus manufacturing where only internal doors are produced. The overall market they are concentrated on is to different institution such as schools, hospitals etc.The purpose of this work is to investigate possibilities to improvement of material- and production control at JELD-WEN. The report will handle the master production schedule to and from the production divisions within manufacturing industry. Focus will be on the way for information- and material flows from arrival, transport within the company and further on to customers.Further a map of the flow was performed which gave a clearer picture of the connection between the flow of information- and material for the manufacturing process. On the basis of the mapping of the flow, the group discovered that the flow of material had some improvement potential.

Low Temperature Waste Heat Solutions : with proposals for energy technological actions based on Scania?s building 64

The report comprises two separate parts:part 1:  Temperature needs for district heating in the paint shop for axles in building 210part 2:  Energy and low temperature waste heat solutions in heating and cooling systems for   building 64 with surroundingsThe paint shop for axles in part 1 has air quality requirements in places for coating of axles. Toachieve desired air properties there are different process ventilation systems, which consist ofventilation coils for heating and cooling, plus air humidifier. The ventilations coils for heating usedistrict heating. Today the ventilation coils use water of 100°C to achieve necessary air demands inthe coating boxes. This part of the report investigates whether the existing system would achievethe air requirements with a water temperature of 75°C instead of 100°C in the ventilation coilsduring the coldest parts of the year.

Energieffektivitet i datahallar

The number of data centers and their capacity is increasing throughout the world. Theenergy used in these data centers and the emissions from the use are increasing at thesame rate. The total use of energy will double from 2008 to 2011 based on the trends indata centers use. Research in this area says that the emissions from data centers willhave surpassed the level of airline traffic in 2020. The index used today to compare howefficient a data center is, called PUE, is lacking some information.

Byggnadsarbetarens syn på att bli involverad i projekteringen : En intervjustudie i byggprojekt

Title Becoming involved in the planning process - from the construction workers perspective.University/Institution Halmstad UniversityKeywordsEmpowerment through participation, construction workers involvement in decision making in the planning process, knowledge management and communication in the planning process, partnering, human resource managementAimThe aim of this bachelor thesis is to provide knowledge and examine how construction workers perceive involvement in the planning process of partnering projects, what they can contribute and what they get out of the planning process.Methodology The study was conducted with a qualitative approach in the form of semi-structured interviews.          The interview studie consist of 10 interviews with construction workers who are specially educated in participating in the planning process at the company ByggDialog AB.ConclusionAll respondents are positive to be involved in the planning process. The main advantages they can see is that they are able to influence technical solutions and methods that will be used later on in the production. Therefore it is important to consider when construction workers should be involved in the planning process so that they get the chance to influence in this decisions.When it comes to the decision making the construction workers should be involved in the decisions that are related to their tasks in the production such as technical solutions, choice of methods and materials. Their main duties and working hours should be in the production.Involvement in planning does not automatically mean that the construction workers are involved in the decision making, it is up to them how much they participate.

Förslag till energieffektivisering och energideklarationsunderlag : Munkebergsskolan och Bredängens äldreboende i Luleå

This examination work is performed at the institution of industrial economy and production at Jonkoping technical university, for JELD-WEN Door Solutions plant in Forserum.Today the focus in the company is on to reduce their inventories binding of capitals as well as inventory of products and that includes to get a good control of the supply and handling of material which is of great importance.JELD-WEN Door Solutions is one of the worlds leading producers of windows and doors and the head-office is located in Oregon, USA.A great number of wooden doors are manufactured by the company in varying of constructions, classifications and performance.The production of the plant in Forserum has a project- and customer focus manufacturing where only internal doors are produced. The overall market they are concentrated on is to different institution such as schools, hospitals etc.The purpose of this work is to investigate possibilities to improvement of material- and production control at JELD-WEN. The report will handle the master production schedule to and from the production divisions within manufacturing industry. Focus will be on the way for information- and material flows from arrival, transport within the company and further on to customers.Further a map of the flow was performed which gave a clearer picture of the connection between the flow of information- and material for the manufacturing process. On the basis of the mapping of the flow, the group discovered that the flow of material had some improvement potential.

Adventsljusstake: Framtagning av ett produktkoncept till en adventsljusstake

Traditions are something that is very important to many people, Christmas is usually no exception. Christmas tree, Christmas ham, herring and candle lights are just as important as the advent candlestick. The advent candlestick help you get the Christmas feeling during the countdown. In this report the work with a new advent candlestick concept can be followed step by step.A lot of information was needed in the beginning. By doing some research, surveys and interviews the ground was established for further work.

Potentialen av värmebesparing i ett avlopps luftningsledning

This thesis aims at determining the heat losses in a property vent stack and its roof valve. Upon request of a company, the vent stack is analysed for possible heat recovering solutions to be implemented, while relining of the drain system is executed and with a suitable payback time for the economic investments. The heat loss calculations are based on data for properties that are located in the Stockholm region, but also easy to change depending on the situation. The calculations are done on pipes made out of cast iron, which still is the most common type of drain pipe in Sweden, and these are the pipes that relining is usually made on. The calculations that needed to take several variables into account have been done in MatlabR2014a and the thermos dynamical properties that were used in those calculations have been extracted from EES.Three different types of heat losses in the vent stack have been taken into consideration in this thesis.

Afrikanska Unionen som säkerhetsaktör- en (o)möjlighet? : en undersökning av Afrikanska Unionens strukturella och institutionella förutsättningar för att agera som säkerhetsaktör.

?African Solutions to African Problems? är en av Afrikanska Unionens nya ledord. Denna vilja om att ta mer ansvar för den afrikanska kontinenten och kunna agera som en säkerhetsaktör har resulterat i en ny säkerhetsdoktrin. För att kunna agera som aktör på den internationella arenan krävs att vissa förutsättningar existerar enligt en modell framtagen av Gunnar Sjöstedt. Dessa strukturella och institutionella förutsättningar kommer i denna studie att undersökas för att analysera huruvida AU kan agera som säkerhetsaktör.

Fo?rba?ttringsfo?rslag pa? automatisering av bagagehantering

This report will outline a proposal for the improvement of the baggage sorting facility at Arlanda airport. Swedavia is a state owned company group that operates, owns and develops airports in Sweden. One of their main roles is to create accessibility needed to facilitate and streamline the work at the airport.Swedavia is constantly working to develop new solutions and enhancements that will help to standardize and automate the work at airports without major impact on climate and above all adapt these solutions to work.The project has been aimed to identify and isolate the problem at the check-in counter, investigate the possibility of setting a speed control on the DC motor driving the luggage conveyer belt at the check-in desk so that the luggage does not lose tracking already there, as well as evaluate the new sorting systems planned to be introduce in the upcoming refurbishment of the sorting area.To determine the parameters that are used to regulate the speed of the baggage conveyor belt, information about the inputs and outputs that participated in the process was gathered. Information was collected both practically and theoretically. Process was followed and monitored by the supervisor of the company, and a theoretical study was done separately on my own.

Samverkanspelare i icke bärande fasadelement

AbstractThe tests work is about the subject "synergism of steel and concrete."The construction sector is in a strong competition and the different companies in the PrefabMarket has ever tried to develop new design solutions that are efficient and environmentallyfriendly.The purpose of this report is to highlight different aspects of interaction and size up a columndimension and to examine its efficiency and load capacity as Eurocode 3 and Eurocode 4. A sizing chart that describes the relationship between the torque and normal force shouldalso be made of the interaction . .

Energianalys mellan programmen IES (Integrated Environmental Solutions) och Enorm

An increase interest of new methods and tools has begun to grow in the real estate business, this new trend causes an increase in new programs that aim to simplify processes of energy-efficiency and environmental issues.After consulting with Björn Alsmark from Bjerking AB, an architect and engineering company, we made a decision that the Degree Project is going to examine the program IES (Integrated Environmental Solutions) with some integrations from Revit Architecture application.To be able to examine IES, we got access to a completed project from Bjerking. The project is a nursery school in Uppsala. An application has been handed in from Bjerking to make this project to a Green Building-certificated project. According to Bjerking own calculations (with the energy-calculation program Enorm), the consumption of energy of the nursery school is 48 percent lesser than required by BBR.An evaluation of IES and Enorm has been made with an aim to compare these two programs and find out if IES is an appropriate program to replace Enorm. Does Enorm or IES come up to BBR´s recommendations?The Degree Project cover 15 ECT, that required several adjusting and delimitations, and the study sketch ended with a literature study.After finishing the study sketch the modeling of the nursery school began.

FRAMTAGNING AV INSTALLATIONSKIT FÖR PROJEKTILINMÄTNINGSYSTEM

The report presents a thesis carried out on behalf of the company SAAB Training and Simulation which is situated in Huskvarna. The authors of this report are going to graduate as mechanical engineers focusing on product development and design, and this thesis should reflect the knowledge obtained during the education. The assignment, given from the company was to develop a concept of a stand that will constitute as a part of a mobile system for target practice. The reader get to follow throughout the project and can hopefully learn from the smart solutions and approaches that have arisen during the process.Today SAAB doesn?t have a mobile application in their portfolio that utilizes the benefits of their sensor measuring system, also called the LOMAH-bar.

Husproduktion, kritiska skeden i produktion

As a newly graduated student in construction you rarely have as much knowledge as you wish you had. It is a complicated line of business that requires knowledge and understanding of both technical solutions and interaction between actors. It is impossible to be fully learned and with that much unknown it can be hard to know where to start. This report is one step in the right direction. It contains a planning that contains construction and installations for a one level house in Kiruna with its different choices motivated.

<- Föregående sida 11 Nästa sida ->