Sök:

Sökresultat:

69 Uppsatser om Substation - Sida 1 av 5

Quartzene i gips : Densitet och hållfasthet

A Substation must be properly protected against lightning and other external effects to the equipment in the station or staff, for that we use relay protection. They should also protect against internal errors which may occur as ground faults. There are different types of protection relays, but most common are overcurrent-, distance-, residual current- and differential protection.The purpose of this thesis was to deepen our knowledge of relay protection and to use the theoretical knowledge we got from the university studies in the work process. In the process we discovered which parameters were the most essential and calculated these for all relay protections on the Substation. We also carry out a comparison between two brands of relay protection, ABB and Alstom.During our work we will test and simulate the over-current relays in a program called NEPLAN, the program will also calculate the fault currents.

Framtagning av reläskyddsinställningar för en transformatorstation

A Substation must be properly protected against lightning and other external effects to the equipment in the station or staff, for that we use relay protection. They should also protect against internal errors which may occur as ground faults. There are different types of protection relays, but most common are overcurrent-, distance-, residual current- and differential protection.The purpose of this thesis was to deepen our knowledge of relay protection and to use the theoretical knowledge we got from the university studies in the work process. In the process we discovered which parameters were the most essential and calculated these for all relay protections on the Substation. We also carry out a comparison between two brands of relay protection, ABB and Alstom.During our work we will test and simulate the over-current relays in a program called NEPLAN, the program will also calculate the fault currents.

Ny stamstation i Yttermalung för anslutning av vindkraft : Nätstudie av olika utföranden i normal- och reservdrift

Since 2004, wind power has had the largest installation of new capacity compared to other energy sources in Sweden. Accommodating new wind power may require strengthening or rebuilding of the existing grid in areas where the grid is already loaded to maximum capacity. This master thesis examine the possibility of a new 400/130 kV Substation in Yttermalung, Sweden, with a connection to the two neighboring regional grids in Dalarna and Värmland owned by Fortum. This Substation would provide a new connection point to the Swedish transmission system as well as an interconnection of the two, currently separated, regional grids. Different expansion scenarios where a Substation with and without series compensation or a phase shifting transformer (PST) to control active power flow were studied.

Effektivisering av mellanspänningsnät med enkla medel : Feldetektorer och sommardriftläge

Renewable energy and the charging of electrical vehicles will increase in the future. Therefore the risk of outages is also increasing, partly because renewable energy is intermittent and the production amount can change fast. Charging electrical vehicles is often demanding high effect in short time, which could make faults occur. It takes more advanced technology to short the outage time. Today Övik Energi has high reliability in the power grid, but in order to maintain the reliability, it is time to prevent problems that can occur in the future. This thesis has presented a suggestion for the placement of fault detectors Protrol IPS2, in which a total of four detectors is proposed.

Pilotinstallation av fast och fjärravläst nätstationsmätning : Identifiering av för- och nackdelar med nätstationsmätning, Mälarenergi Elnät AB

Today?s electrical grid companies understand that better knowledge of and information about their grid can help realize a smart grid network. One way to gain better knowledge and information about the low voltage network is to install measuring equipment on the Substation transformer´s secondary low voltage side that measures the low voltage network losses for that specific Substation. By doing so, grid companies can, due to the calculation of the low voltage network losses, identify and address issues such as illegal power dissipation, unmeasured power outtakes, and unsatisfied technical documentation for the Substations low voltage network.During 2012, Mälarenergi Elnät AB had a total electrical network loss (both medium and low voltage network losses included) of three to four percent of their total distributed electrical volume. Converting this energy volume into a monetary figure this accounts for a loss of around 30 million Swedish crowns.

En studie av sex ISA-system

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV Substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV Substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the Substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Dynamisk simulering av avfallskraftvärmeverk

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV Substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV Substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the Substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Energianalys av Vikan Kross och Asfalt

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV Substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV Substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the Substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Rationell plattläggning. Studie av ett arbetsmoment

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV Substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV Substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the Substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Prognostisering av höga grundvattennivåer med Chalmersmodellen

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV Substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV Substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the Substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Kvalitetssäkring av efterinjektering. En fältstudie i Nygårdstunneln

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV Substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV Substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the Substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Metod för beräkning och jämförelse av lönsamhet för trafiksäkerhetsåtgärder

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV Substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV Substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the Substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Platschefens ledaregenskaper. Sett ur medarbetarnas perspektiv

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV Substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV Substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the Substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Ventilationssystem med variabla luftflöden - Optimal dimensioneringsmetod för VAV

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV Substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV Substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the Substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

Bostadsbyggande i Skövde fram till år 2025

On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV Substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV Substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the Substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.

1 Nästa sida ->