Varför blev det inte som planerat? En studie över platschefers prognosarbete i anläggningsprojekt

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Produktionskostnader för flerbostadshus En jämförelse mellan JMs projekt i Region Väst och Region Öst

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Hälsomässiga risker på vattenledningsnätet - En studie över samband mellan trycknedsatt ledningsnät och förhöjd risk för sjukdom i tre svenska kommuner

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Effektivisering av energianvändningen i en förskola

This rapport contains an examination of the energy consumption of a kindergarten, which areas that have the largest impact on the energy consumption and what can be done to reduce those areas in ways that are relatively easy and profitable. It is also analyzed if it is possible to reduce the energy consumption from today?s consumption to a consumption that fulfils the demands placed on low energy houses by FEBY.The focus has been on reducing the energy consumption of the areas ventilation, heating system and hot water system, since those seemed to be the easiest ones to affect and since the building is quite recently built.There are different kinds of ventilation systems, at the moment the building have a CAV-system, which means that the ventilation is too high during large parts of the day. There are different ways to manage the ventilation system, for example presence detection, humidity sensors, CO2 sensors, temperature sensors and season adjustment. Many of those are in the end dependent on CO2 sensors to guarantee a good indoor climate, therefore the focus have been placed on this system.

Småskaligt vattenkraftverk i Nyköpingsån

Interest in alternative energies is high in Sweden today, particularly in the agricultural sector. According to the Swedish lantbruksbarometern (2009), almost all respondents consider the use of some form of alternative energy from the farm. While interest in alternative energies is large, attention to the alternative energy straw has fallen and is almost nowhere mentioned in the literature today. Three years ago, in the Lantbruksbarometern nearly 44% of the farmers would be willing to invest in straw as heating system on the farm. How do the farmers decide to invest in alternative energies? With this information a problem is presented for this paper.

Samband mellan lågt tryck i dricksvattenledningar och magbesvär - En utredning av hur lågt tryck på dricksvattenledningsnätet vid lagning av läckor påverkar sjukligheten hos Göteborg Vattens abonnenter.

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Utvärdering av en väggkonstruktion utan PE-folie : Med en undersökning av hårdvaxolja som diffusions-/konvektionsspärr

District heating covers around 80 % of the heating demand in apartment buildings and 10 % in single-family homes in Sweden. In the year 2010 the total input of energy to the Swedish district heating grids was about 70 TWh, which corresponds to 11 % of the total energy input to the whole energy system in the country. Through the combined production of heat and power the CHP-plants often reaches an efficiency of 90 % from energy in the fuel to produced heat and power. In order to keep the efficiency high it is important for the owners of the plant to have good knowledge about the plants performance at different operation points. Strängnäs Energi AB initiated this diploma work together with FVB Sverige ab in order to come up with a program for short term planning of the production of heat and power at the company´s CHP-plant.The work consists of three main parts.

Uttorkningsmöjligheter i ett fuktskadat badrum med hjälp av spaltmetoden

Buildings today are built to maintain a healthy indoor environment and an efficient energy usage which is probably why damages caused by dampness has increased since the 1960?s.A study between year 2008 and 2010 showed that 26 percent of the 110 000 examined houses had damages and flaws caused by dampness that could prove to be harmful later on. This means that one out of four bathrooms risk the chance to develop damages by dampness. Approximately 2 percent of the houses had already developed water damages. It is here where the problems appear.

Ljudisolering i prefabricerade betongstommar. En fältmätning av luft- och stegljudsisolering.

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

E-böcker och bibliotek. En diskussion kring den digitala beståndsutvecklingens möte med en gryende e-boksmarknad

In Scandinavia the general idea of the Bronze Age society is that it was organised as chiefdoms. The model for what they looked like is taken from the anthropological studies of the Polynesian chiefdoms. The aim of my study is to investigate a Scandinavian Bronze Age feature, known as cairns mainly containing fire-cracked stone. This is compared with how people in different Polynesian chiefdoms, looked at similar remain. This is done to get a background for new ways of interpretation of such remains.

Energimässig jämföelse med investeringskalkyl av två förskolor

This thesis includes an energy survey of the Herrgården pre-school, which has a modern heating- and ventilation system, and a comparison with Östers pre-school which has an older system. An energy survey of Östers pre-school has already been done by a group of three students and all the calculations and values have been collected from that survey. As of today, both pre-schools are heated thru district heating. It will be much easier to make smart and feasible energy-saving-measures by first conducting the energy survey.Herrgården pre-school in Gävle houses 81 children, therteen teachers, one cleaner and one cook. It was finished in the middle of 2009 and the staff has been very pleased with the in-door climate.

Optimerande av gasanläggning - genom värmeåtervinning och förlustreducering. Gässlösa Reningsverk

The municipality, of Gatukontoret in Local government of Borås has in the long run, a required need to look after the current heating devices (the gas production plant) in sewage treatment plant, called Gässlösa. The practical work of the examination is about, trying to find a better way to take care of the current heat recovery. That may be one way or another, rather easy to implement in the existent construction.Through the work to increase the efficiency of the gas engine, implement of some external cooling system by heating exchange device. That gives an opportunity to heat (primary) the digester, (but even all internal public areas) with its own superfluous heating.The report shows that if the management group may invest 422 704 crown to implement a heat exchanging device, it gives more space to reduce the need to buy expensive external energy. Gatukontoret´s pay off time, for buying machines, is 20 years, with reservation to calculate with 4 percent internal interest, leads to the yearly mount of 31103 crowns.If Gässlösa increases the gas engine time in (effective) duty approximately (correspondingly) 48 hours a month the entire investment will generate a profit in January in year seven after the implementations.

Förbättrad tillgång till referensmaterial vid röntgentolkning

This thesis includes an energy survey of the Herrgården pre-school, which has a modern heating- and ventilation system, and a comparison with Östers pre-school which has an older system. An energy survey of Östers pre-school has already been done by a group of three students and all the calculations and values have been collected from that survey. As of today, both pre-schools are heated thru district heating. It will be much easier to make smart and feasible energy-saving-measures by first conducting the energy survey.Herrgården pre-school in Gävle houses 81 children, therteen teachers, one cleaner and one cook. It was finished in the middle of 2009 and the staff has been very pleased with the in-door climate.

Robot-Assisterad Gradningscell med Force Control

This thesis includes an energy survey of the Herrgården pre-school, which has a modern heating- and ventilation system, and a comparison with Östers pre-school which has an older system. An energy survey of Östers pre-school has already been done by a group of three students and all the calculations and values have been collected from that survey. As of today, both pre-schools are heated thru district heating. It will be much easier to make smart and feasible energy-saving-measures by first conducting the energy survey.Herrgården pre-school in Gävle houses 81 children, therteen teachers, one cleaner and one cook. It was finished in the middle of 2009 and the staff has been very pleased with the in-door climate.

Värmeåtervinning ur spillvatten : En utredning av möjligheterna med spillvattenvärmeväxlare

The purpose of this report is to investigate the possibilities with drain water heat recovery (DWHR) in residential buildings. Information and relevant theory has been collected and summarized in this report. Calculations have been done for given scenarios to evaluate profits. DWHR heat exchangers use simple technology and have long life-time. The heat exchanger is connected to outgoing drainage pipe and incoming cold-water supply so countercurrent flow is accomplished.