Sök:

Sökresultat:

374 Uppsatser om Solar thermal - Sida 7 av 25

Utformning av förfrågningsunderlag vid totalentreprenader

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with Solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Solenergi på Nordvästra Kungsholmen

The energy that the earth receives from the sun hourly has potential to cover a year?s energy demand in the world. Further, this type of energy is environmentally friendly, natural and free of cost. This report covers solar energy in an urban environment and consists of a case study of installations of photovoltaic cells in a part of the city of Stockholm. It is mainly the economic aspects that are covered but there is also a discussion about the practical consequences and the sustainability as a result of integration of solar energy in an urban environment. The aim of the study is to present results from economic calculations for utilization of solar energy in chosen buildings in Kungsholmen in Stockholm.

Fysikalisk modell av människans spinalkanal för demonstration av skademekaniken vid whiplash-skada, del 2

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with Solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Leanuppgift för industriprogrammet

The government regulations for energy use in buildings will be tightened in the future. At the same time the interest in environmental classifications and certifications of buildings is increasing. This has meant a new situation for solar energy. The designs of solar heating systems are often based on experience and/or rules of thumb, rather than calculations and simulations. This thesis examines whether simulation tools, in this case Polysun, are useful in this work.

Simuleringsprogram som verktyg vid projektering av solvärme

The government regulations for energy use in buildings will be tightened in the future. At the same time the interest in environmental classifications and certifications of buildings is increasing. This has meant a new situation for solar energy. The designs of solar heating systems are often based on experience and/or rules of thumb, rather than calculations and simulations. This thesis examines whether simulation tools, in this case Polysun, are useful in this work.

Skiftarbetets potential i byggbranschen

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with Solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Varför blev det inte som planerat? En studie över platschefers prognosarbete i anläggningsprojekt

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with Solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Produktionskostnader för flerbostadshus En jämförelse mellan JMs projekt i Region Väst och Region Öst

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with Solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Bergkyla och bergvärmeutredning för industrilokalen Rödbergsmyran 5 i Umeå, Västerbotten.

Grubbe Ventilation AB is a sheet metal and ventilation company who provides design, installation, service, and repair of ventilation. The company is expanding their business by building a new facility in Umeå, Västerbotten. The property is designed to be used for both office and industrial work.Grubbe Ventelation AB has not yet decided upon wish system which is to be established to provide the building with heating and cooling. The consulting firm Umeå Projekt Team has therefore been asked to investigate the possibilities to invest in geothermal- heating and cooling.If the investigation of a geothermal heating- and cooling system would provide favorable results it would be a very appropriate alternative that provides energy at low costs and are an environmentally friendly option as the energy comes from stored solar energy in the ground is provided by stored solar energy in the ground.The facility ´s heating and cooling consumptions are calculated in the program BV2 and the result indicate a heating demand of 185 000 kWh per year due to thermal transmittance, transmission losses, heating of warm water and a cooling requirement of 5500 kWh.Three different systems of geothermal heating and cooling were tested in the computer program Energy Earth Design. The results show no difference in the dimensioning of the drill hole if merely heating were to be used or both heating and cooling were to be established.

Hälsomässiga risker på vattenledningsnätet - En studie över samband mellan trycknedsatt ledningsnät och förhöjd risk för sjukdom i tre svenska kommuner

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with Solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Planering, förutsättningar ocheffekter av implementering avsolceller i stadsutvecklingsprojekt.

Today, buildings utilize 40 % of the total energy consumption. New energyrestrictions and directives have entered the construction industry. Photovoltaic is asustainable, clean and quiet solution that integrates well in the urban environment buthave not yet reached a breakthrough on the Swedish market. The conditions for solarenergy production are often set in the early planning stages where they rarely arebeing prioritized.This master of engineering project focuses on identifying problems regardingimplementation of photovoltaic in city development projects and giving suggestions topossible improvements in the planning- and construction process. It also givesrecommendations on how the conditions for energy production can be optimized inthe early zoning stage.By conducting simulations with PVsystV5.21, on three ongoing city developmentprojects in Umeå, Malmö and Stockholm and by carry out and analyzing interviewswith city planners, constructors and architects, some conclusions have been made.Several improvements, both politically, with changes in the subsidization systemand/or instatement of a new law with feed-in tariffs, and within the solar- andconstruction industry itself, with better communication between different parts of theprocess as well as better use of experience, can be made.

Energi - och ekonomipotential för solceller i Hållbara Järva

One of the city of Stockholm?s main objectives is to have a society completely free from fossil fuels. To achieve this, several investments regarding improvements in energy efficiency and renewable energy are currently being planned or implemented. One of these investments is a project called Hallbara Jarva which is located in the suburbs of Stockholm. The purpose of this thesis is to examine the prospects of an investment in photovoltaic cells from an energy-saving and economical point of view. The analysis is limited to three buildings within Hallbara Jarva and is intended for the property owner.  Solar energy is a type of renewable energy source and is commonly divided into solar heating and solar power.

Samband mellan lågt tryck i dricksvattenledningar och magbesvär - En utredning av hur lågt tryck på dricksvattenledningsnätet vid lagning av läckor påverkar sjukligheten hos Göteborg Vattens abonnenter.

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with Solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

Värmeförluster vid utvändigt placerade ventilationssystem

To be able to handle tomorrows need for limited energy consumption we need to reduce our use of energy. The building sector stands for around 40 % of all energy consumption in the society. The government has put up a goal to reduce the energy consumption in our buildings with 20 % by year 2020 and 50 % by year 2050 compared with year 1995. To be able to do reach that goal we need a more energy efficient building stock.The main part of the energy used in our buildings is used for space heating. By installing ventilation systems with heat recovery on the exhaust air it is possible to use the heat-energy in the exhaust air to warm up the incoming air.

Ljudisolering i prefabricerade betongstommar. En fältmätning av luft- och stegljudsisolering.

Two elementary schools are now being built in Gråbo (in the municipality of Lerum),Röselidsskolan and Ljungviksskolan, which are both designed with Solar thermalcollectors for the schools domestic water heating. During the summer while thelargest amount of solar heat can be generated, the activity hence the domestic wateruse in the schools are heavily reduced. Both schools are connected to the local districtheating system which makes it possible to use the solar collectors to deliver heat tothe district heating.The purpose of this thesis is to evaluate the two systems mentioned above and todetermine which system is more suitable to apply on a school. The building whichconditions were used for this evaluation is Röselidsskolan.A solar heating plant of each system type was dimensioned from the expected andknown conditions of the building. The purpose with the dimensioning was to makethe solar plants replace the ordinary energy source as much as possible.

<- Föregående sida 7 Nästa sida ->