Sök:

Sökresultat:

2685 Uppsatser om Road-side construction - Sida 5 av 179

Skattning av biverkningar : Sjuksköterske- och patientuppfattning om behandlingsrelaterade biverkningar vid stamcellstransplantation.

A possible treatment for patients with lymphoma and myeloma is stem cell transplantation (SCT). SCT is preceded with cytostatic treatment. There are several side effects related to this treatment, for example fatigue, nausea, constipation/diarrhoea, pain, mucositis and loss of appetite. Aim: Investigate which side effects related to the treatment where most troubling after SCT and if nurse assessment and patient assessment differ. Methods: A quantitative empirical study with repeated measuring.

Geosynteter för hållbara vägar : Modell för jämförelse av vägöverbyggnader med eller utan geotextiler och/eller geonät

The different material layers as part of a road construction fill all a function so theroad becomes durable, safe, comfortable and aesthetically pleasing. Recently, anew group of construction materials started to play an important role in roadconstruction ? geosynthetics.This thesis addresses the two most common types ofgeosynthetics used in modern road construction, namely geogrids and geotextiles.The most common use of geogrids is reinforcement of poor subgrade by usinggeogrid soil reinforcement, which occurs when road material particles wedge inthe geogrid?s mesh. Geotextiles act partly as a barrier that prevents the finermaterial in the below ground from being mixed with coarser upper material andalso act as a load spreader.Road contractors often face a choice of whether geogrids and/or geotextiles areappropriate in a particular road project and also how much profit the choice mightbring. This phase in the tender calculation process is the intended scope of thisthesis.The thesis deals with both the "hard" cost-function aspects and the "softer" values e.g.

"Det kan vara byta p-piller lösning, det kan vara ingen lösning alls... ingenting är svart eller vitt där" : En fokusgruppstudie om barnmorskors handläggning och uppfattningar av p-piller och biverkningar

Objective: To study midwives management, practice and reasoning regarding contraceptive counseling for women who are experiencing "mild" side effects of the pillMethods: Four focus groups, made up of three to five midwives per group, participated in focus group discussions. Qualitative design with the method ?Think-Aloud? has been used to collect data and the material was analyzed using content analysis.Results: The study identified three categories, the first "How midwives practice regarding the side effects of the pill," shows that midwives have a systematic approach when meeting with women who are experiencing side effects of the pill. The next category "Using a holistic and professional approach for women" highlights that the midwives take women's side effects seriously and that midwives respect individual woman?s autonomy.

Driftkostnadsanalys i väginvesteringsprojekt

During its lifetime, a road goes through a number of different stages; pre-study,inquiry of the road, work plan, documenting stage, building stage and operatingstage. The operating stage is the one that takes the longest time and costs themost. Those have a tendency of becoming unnecessarily high because the projectengineers don?t always take the management and maintenance prerequisites intoconditions.To decrease the management and maintenance costs, the Swedish RoadAdministration SouthEast has been in need of a work procedure that makes theroaddesign engineers take the management and maintenance of the road intoconsideration. This shall be achieved by a checklist where the most commondesigns that lead to increased management- and maintenance costs are compiledand listed.Through interviews with project leaders in management, the most commonproblems have been identified, analyzed and summarized under the headlineswinter-road, vegetation, road equipment and road designs.To elucidate the problem from several points of view, interviews wereimplemented with project leaders in investment and roaddesign engineers.

Att genom design effektivisera räddningsinsatsen för motorcyklister i trafikolycka

What if the emergency response directly knew exactly where to go and what to do if a road accident occured? During the last ten years the number of motorcyclists in Sweden has doubled. Every year, more than 300 riders are seriously injured and over 40 die in road accidents. Being found in time is critical to increase the chance of survival. The goal of this project is to use design methods to find a solution that enables a fast and adequate emergency response for motorcyclists and other unprotected road users..

Upphandling av vinterväghållning

This report was undertaken at the request of the Management and maintenance department of Swedish National Road Authority (Vägverket Region Sydöst) in Jönköping.In 1992, the management and maintenance of Swedish roads were laid out on external constructors. When putting out a tender for the work, the foundation is from a national set of rules which are in constant change. This report is limited to winter road upkeep.The trend in the invitation for tenders is that it is moving from the more conventional executional demands towards the less controlling demands. The downside of functional, less controlling demands is that it is difficult to articulate how to measure them. The order authority therefore has to find ways to make sure to get what has been paid for.In connection to the invitation for tender of winter road upkeep for 2005, the new set of rules, ATB Vinter 2003 was deployed.The main purpose of this thesis is to see which the big changes in the set of rules are and how these changes affect the organisation and activities of the constructor.It is also studied how the changes in execution is perceived by road users and how it affects the possibilities of the constructor to come as a newcomer to a new area of administration.Interviews and examination of sets of rules has led to a list of a number of changes that the constructors feel affect their work in any sense.Views from road users that have come in to the order authority have been scrutinized to see how they have experienced the change.

BYGGBRANSCHENS EGENKONTROLLER - DERAS BETYDELSE UR ENERGISYNPUNKT

In order to accomplish that a construction is correctly built, it is critical to obtain a well functioning control mechanism throughout the project. The way to enable this is not by having an independent inspector constantly at your side. Today it is praxis to use check lists and have people responsible of quality to make sure that these are followed. This is where discretionary inspections play their part. These among others are documents needed to com-plete the check list.

Åtgärder för att minimera trafikbullers påverkan på ett rekreationsområde

The aim of this inquiry was to investigate the most appropriate measures to reduce noise impacts from road traffic on the Nydala recreational area in Umeå municipality due to the planned re-routing of the E4 motorway to an existing road along this area. The sound environment is an important part in the experience when we are visiting recreational areas. Noise is not only disturbing; the liberty from unwanted sounds also allows us to perceive natural sounds that are a benefit for the cultural experience. Therefore it is important to take actions to protect this well used area from traffic noise. The reasonable options to avoid noise impact in this case are to lower the speed limit, using a noise reducing coating or use noise protection screens and walls.

Produktivitet och kvalitet vid stickvägs- respektive beståndsgående förstagallring :

Nowadays the majority of the thinnings made in Swedish forests are done by machines, harvesters and forwarders. The most common model in thinning with a harvester is strip-road operated thinning and stand-operated thinning with one intermediate passage between the strip-roads. This study is a time study with some quality follow ups on a strip-road operated thinning model, a stand-operated thinning model with one intermediate passage between the strip-roads and a stand-operated thinning model with two intermediate passages between the strip-roads. The machines in the study were a small harvester (Forestline MPM C90) and a medium sized forwarder (Timberjack 1110). The study was made in Litsnäset outside the city of Östersund in Sweden and was made during the autumn 2007. In a lodgepole pine stand six study units (0,6 ha) were thinned with the three different models, two study units per model.

Inredningskoncept för vägambulans : Ett examensarbete vid Industridesignprogrammet 2011

The subject of this bachelors degree project is an interior layout for road ambulances.Landstinget Västernorrland (LVN) wanted a layout concept that would be used to com- municate their design intentions to the ambulance producers during their purchase process.Designing ambulance interiors is an extremely complex process since there so many fac- tors to take into consideration. It ?s not just about taking the equipment and place it where there is space left in the cabin. You have to start with the user in focus and the tasks that are to be performed in the ambulance environment.It ishard to find design solutions that will fit 100% of the ambulance personnel?s working routines for 100% of the tasks.

?Bollen susade in i bortre gaveln? - En studie i rörelsekonstruktioner och produktivitet

This paper investigates the grammatical construction intransitive motionconstruction with GOAL as it is used in Swedish (Swe. intransitivrörelsekonstruktion med MÅL).I examine in which ways the construction is productive, i.e. thepossibility to use the construction with new verbs as well as withordinary motion verbs with new functions. The notion of productivity isbased on the construction?s type frequency and semantic openness(Goldberg 1995, 2006; Barðdal 2008; Bybee 2010).

Handlingsplan för rening av dagvatten från hårt trafikerade gator i Örebro

The main purpose with the project has been to approximate the magnitude of the pollution transport from the actual road surfaces and to get an approximation of the possibility to collect the pollutants to reduce the load to the water and improve the water quality.The quantity of pollution transport from the most trafficated roads areas in Örebro city has been calculated. Roads whith a traffic exceeding 10 000 vehicle/day. The study has been done with the calculation tool StormTac. Through analysis of traffic loads and road surface, which together with a different kinds of parameters gives an approximation of the pollutant transport.The calculation has included some metals and other substances in the stormwater and has also included the present of suspended solids. Included the overall study, some smaller areas has also been calculated for the possibility to remove pollutants.The work also includes calculation for three different areas for stormwater treatment.

Upphandling av vinterväghållning

AbstractThis report was undertaken at the request of the Management and maintenancedepartment of Swedish National Road Authority (Vägverket Region Sydöst) inJönköping.In 1992, the management and maintenance of Swedish roads were laid out onexternal contractors. When putting out a tender for the work, the foundation isfrom a national set of rules which are in constant change. This report is limited towinter road upkeep.The trend in the invitation for tenders is that it is moving from the moreconventional executional demands towards the less controlling demands. Thedownside of functional, less controlling demands is that it is difficult to articulatehow to measure them. The order authority therefore has to find ways to makesure to get what has been paid for.In connection to the invitation for tender of winter road upkeep for 2005, the newset of rules, ATB Vinter 2003 was deployed.The main purpose of this thesis is to see which the big changes in the set of rulesare and how these changes affect the organisation and activities of the contractor.It is also studied how the changes in execution is perceived by road users and howit affects the possibilities of the contractor to come as a newcomer to a new areaof administration.Interviews and examination of sets of rules has led to a list of a number ofchanges that the contractors feel affect their work in any sense.Views from road users that have come in to the order authority have beenscrutinized to see how they have experienced the change.

Visualisering av Flight Recorder-data i Saab 2000 avionikrigg

The main purpose of a Flight Data Recorder (FDR) is to facilitate the investigation of incidents. In order to interpret the data that has been recorded in the FDR the data has to be visualized in some way. This can be done with software on a computer or with hardware that is specific for the model of aircraft that the data originates from.The aim of this project is to visualize data for six parameters from the FDR of Saab 2000 in an avionics rig. The avionics rig resembles the cockpit of Saab 2000 and the displays in it are identical to the ones found in the plane. All six parameters are shown on the same display.Due to safety regulation vital systems in aircraft are doubled, with one system on the left side and one on the right.

Tillit inom illegal e-handel. En fallstudie av marknadsplatsen Silk Road

Since the beginning of the internet the criminal world has used the medium as a platform for operation.This dark web is a domain where illegal sites are flourishing due to the possibilities offered by newtechnology. Net-based criminal activity is a challenge for society as it uses hard proof technologicalsafety measures to avoid the law. Silk Road is the most prominent example, an online illicitmarketplace where drugs and illegal substances are being traded based on conventional e-commerceconcepts. This paper argues for trust as an important factor for the survival of illicit online trade andapplies existing theories on e-commerce and virtual communities. To identify patterns of trust andcommon trust-based issues among Silk Road users, a netnographic study was conducted on the site?sdiscussion forum.

<- Föregående sida 5 Nästa sida ->