Sök:

Sökresultat:

491 Uppsatser om Road bridge - Sida 1 av 33

Jämförelse av beräknad och verklig grundvattensänkning vid vägportar

Present master of science thesis has been carried out at the Swedish Road Administration consulting services (Vägverket Konsult) in Karlstad. The purpose of the study is to investigate how well the calculated drawdown of the groundwater table predicts the actual drawdown when the road and railway gates at the studied sites are built. For this purpose the groundwater levels at the three bridges were measured during 6 months. The bridges in question are two railway bridges situated in Ölme and Ulvåker and one Road bridge crossing a pedestrian and cycling path in Lidköping.In Ölme the calculated area of influence was smaller than the measured one. It differed up to 30 meters, i.e.

Göta älvbron, övervakning med optisk fiber : Ekonomisk analys

The Göta älv-bridge is a welded steelbridge which is located in Gothenburg,it connects the inner city of Gothenburgwith the island Hisingen. Cracks wasdiscovered in the steel in 1999-2000which started an investigation of thebridge to clearify the condition of thebridge. The conclusion was a monitoringsystem based on laser light sent throughan optical fiber.This report describes the bridge, thedamages, the monitoring system and thetraffic on the bridge.Stefan Pup, at Vectura Borlänge was mysupervisor during this work. In myinvestigation the costs of themonitoring system and the costs ofclosing the bridge is compared andevaluated. The biggest investigatingpart is the costs of closing the bridge.The results of my investigations is thatclosing the Göta älv-bridge would cost 1107 300 SEK / day.

Förbättringsförslag pådaglig styrning

The Swedish Transport Administration manage nearly 4,000 railway bridges in different condition and age around the country. These bridges is in constant need of maintenance and requires continuous inspections. This thesis is designed as a damage investigation on a single-track railway bridge south of Solvarbo in Säter municipality. The railway bridge is in operation and serves over 10,000 trains a year, everything from speed trains to freight trains. The bridge is built as a beam bridge, simply supported over a road.

Utmattning av vägbroar i armerad betong enligt eurokoder

Since 1 January 2010 it is a requirement to use the European standards, Eurocodes, in Sweden when constructing bridges. One chapter that has caused an extra amount of problems for the engineers is the one about fatigue analysis, which resulted in us doing this thesis.To do this we had to read all of the Eurocodes that direct, or indirect deals with fatigue and calculating of such. We have read the background documents for the Eurocodes and master?s thesis in the subject. We also studied the calculations of bridges constructed by different construction firms.We have chosen to limit the thesis to discuss only Road bridges made of concrete due to the lack of method for verification of concrete in the national appendix.

Byggnation av ett tak i Lwengo Basilla : En fältstudie med fokus på infästningar, pelare och bärläkt på en skola i Demokratiska Republiken Kongo

The Swedish Transport Administration manage nearly 4,000 railway bridges in different condition and age around the country. These bridges is in constant need of maintenance and requires continuous inspections. This thesis is designed as a damage investigation on a single-track railway bridge south of Solvarbo in Säter municipality. The railway bridge is in operation and serves over 10,000 trains a year, everything from speed trains to freight trains. The bridge is built as a beam bridge, simply supported over a road.

Förebyggande Brounderhåll

AbstractThe Swedish Road Administration in the region of Mälardalen has since 2004 worked to in¬crease the efficiency of the maintance of bridges based on limited functional requirements and time demanded action.The maintenance of the bridges is contracted in the county of Uppsala since 2004, and Örebro since 2007. The county of Nyköping and Västerås is contracted by the traditional system. The contractor will perform a regular maintenance on all bridges. The bridges are inspected by the contractor at least once every year.The contractor registers the result of the inspection in a database called BaTMan. BaTMan is a Bridge and Tunnel Management system and is a strictly web solution were the user logs in via the internet.The Swedish Road Administration also inspects the bridges to se that the demands on the bridges are followed.My work is to compare these different inspections and to see any development..

Slitage på skogsbilvägar vid virkestransporter

This report discusses questions concerning wear on forest roads. The purpose of the work is to investigate if the wear on the roads will decrease when the speed limit gets lower for the trucks that transport the wood. A normal forest road, class B, was used in the study. In total 5000 m3f timber was transported on the road. Data about the road was measured with a profilograph car before and after the timber transport.

Operatörsoberoende SMS-leverans med designmönstret Bridge

When different type of programs are developed one wants to make these adjustable to future changes and requirements. It must be done a good design of the program from the beginning to make it possible to continue development of it without having to redo big parts of it to high costs. In the area of object orientation there are design pattern, which can be used to design systems that can be adjusted to new changes in an easier way. I have in this thesis chosen to take a closer look at how to design a program that sends SMS to cell phones through a system of an operator. One requirement on the program is that it has to be possible to change what operator to send though in an easy way.

Operatörsoberoende SMS-leverans med designmönstret Bridge

When different type of programs are developed one wants to make these adjustable to future changes and requirements. It must be done a good design of the program from the beginning to make it possible to continue development of it without having to redo big parts of it to high costs. In the area of object orientation there are design pattern, which can be used to design systems that can be adjusted to new changes in an easier way. I have in this thesis chosen to take a closer look at how to design a program that sends SMS to cell phones through a system of an operator. One requirement on the program is that it has to be possible to change what operator to send though in an easy way.

Uppdatering av båtnadskalkyl med hänsyn till nya faktorer :

Sweden have 419 000 km road in the country and about half of these roads is forestroads. The forest road net most important mission is to make it possible to deliver wood from the forest to the industries. With a raw material that is spread over a large area the road network is important. Each year has the forest road network been extended with about 1 700 km new roads. To decide if a new road is to be built different forest road cost estimation models has been used.

Utformning av vägen och dess omgivning : med fokus på bilförarens upplevelser

This thesis focuses on the driver?s experience of the road and its surroundings. ?The view from the road? takes place every day and a high-quality ?road experience? is therefore a question of importance. Since cars made their breakthrough in the 1920-30, the approach to ?the driver experience? has varied notably.

Förbättrad resistansmätning för grova aluminiumledare

The goal with this master thesis has been to evaluate and to examine the stationary resistance bridge. The resistance bridge uses a 4-point measuring to determinate the resistance, which is used in the manufacturing of the conductor. It is then used when the resistance is to be decided for coarser aluminium conductors. A conductor has to fulfil certain demands to be able to move forward in the process. One of these demands is the resistance in ohm/km, which has demands that the measure values of the resistance bridge are as true and precise as possible.

Förbättrad resistansmätning för grova aluminiumledare

The goal with this master thesis has been to evaluate and to examine the stationary resistance bridge. The resistance bridge uses a 4-point measuring to determinate the resistance, which is used in the manufacturing of the conductor. It is then used when the resistance is to be decided for coarser aluminium conductors. A conductor has to fulfil certain demands to be able to move forward in the process. One of these demands is the resistance in ohm/km, which has demands that the measure values of the resistance bridge are as true and precise as possible. The stationary resistance bridge had been examined through various kinds of measurements to be able to see how stable the system is and how to obtain a measure value as optimized as possible.

Jämförelse mellan en träbro och en betongbro : En LCA-analys med fokus på koldioxidutsläpp samt en LCC-analys

This report is a thesis for collegeengineering program in structuralengineering at Uppsala University andwas commissioned by the Swedishcontractor Svevia. The study aims toprovide an overview of the mostbeneficial bridge material from bothenvironmental and economic point ofview.The life-cycle analysis covers onlycarbon dioxide emissions, since it isthe most spoken of in today?s climateagenda. Furthermore, this study aims tohighlight which parts, of the systemboundary, that contributes to greatercarbon emissions for the wood- and theconcrete bridge.The life-cycle cost analysis wascalculated with a lifespan of 40 yearsand covers the basic cost of investment,operating and maintenance, anddecommissioning costs.The analyzed constructions in this studyare existing projects that are almostcompleted. Both bridges were designed tohandle loads up to 60 tons.

Gabioner - Ett alternativ vid vägbanksbygge i lösa leror

The use of gabions means a reduced amount of filling material in the road section and a more narrow construction. Also the use of limestone cement columns can be reduced. All together this results in lower costs. The columns stand for about 55% of the total costs for the road. If gabions are used you can reduce the total costs with over 10%..

1 Nästa sida ->