Sök:

Sökresultat:

448 Uppsatser om Road accidents - Sida 3 av 30


Arbetsmiljöutredning av fallskydd på byggarbetsplatser

Fall accidents are a big problem in the construction industry today and stand forapproximately 23% of all accidents. Skanska is a construction company that has avision toachieve zero accidents. Eliminating fall accidents is one step on the way towards theirvision. The state of Skanskas fall safety has been analyzed in this thesis to show whichimprovements are possible in fall safety.A literature study has been performed in which Arbetsmiljöverkets (The Swedishwork environment authority?s) laws and rules, together with Skanskas own rules havebeen studied.

SCA Skogs arbetsmetoder för att fastställa nyttan av en väginvestering

The basis of road investments is to minimize the transportation cost. The forest industry wants roundwood to be available during the whole year. One way of determine which road to invest in is to do a cost/benefit calculation. SCA Forest lacks a uniform approach to determine the utility of a road investment. The goal of this report is to describe how the organization works today and find areas of improvement. The data collection was done through interviews.

ITS under byggtid - utvärdering med dynameq : Fallstudie: Intunnling av E4/E20 Tomteboda - Haga södra

Essingeleden in Stockholm is the most heavily congested road segment in Scandinavia and it is ofgreat importance for as well traffic within the city as for transit traffic. The capacity of Essingeledenand Norra Länken is not enough to accommodate all traffic. At times it is not moving at all, whichresults in long queues and an augmented risk of accidents. Consequently measures for increasing thecapacity on E4/E20, which will reduce congestion and the risk of accidents, are implemented byTrafikverket. In fall 2012 one lane of three at Pampas will be closed and so will the exit fromEssingeleden to Norra Stationsgatan, called Parkeringsbron.

Fysiologiska kvaliteter hos manliga tävlingscyklister och effekten av högintensiv intervallträning

Abstract Road cycling is well established and has always been described as a highly endurance sport. To be able to compete in such a demanding sport the physiology of the athletes needs to be greatly developed. This review will focus on high intensity interval training and its impact on the physiological characteristics of competitive road cyclists. The main difference between different levels of competitive road cyclists seems to be the capacity to maintain a high sub maximal power output over a long period of time in order to succeed. High intensity interval training, from 30 seconds to 5 minutes, leads to improved VO2peak, aerobic peak power and time trial performance.

Klimatpåverkan vid vägbyggnad -beroende av vald konstruktion

It?s a fact that the climate is affected by the vehicle that runs on the worlds roads. But theconstruction of the road itself is rarely thought of as a climate threat. Svevia and the Swedish roadadministration have opposite views of how the construction of roads should be carried thru. It?sthe difference between those two construction methods that is the base in our thesis.The amount of energy use or the emissions are not analyzed for neither the Swedish roadadministrations nor Svevias construction models.

Hastighetsreduktion på genomfartsleder, genom icke-tvingande åtgärder i vägmiljön

The study was conducted with an landscape approach with an subject related approach in the field of environmental psychology to investigate how road design affects drivers' choice of speed. The purpose was to portray road environments on thoroughfares in urban areas to motivate motorists to keep the speed limit and thus increase road safety for vulnerable road users. The task question was formulated, how can thoroughfares in suburban settings be portrayed to motivate motorists to reduce speed? The study was conducted throughout a literature review of motivational speed measures along with interviews with road design experts at the Swedish Transport Administration. Case studies were conducted on three thoroughfares in the Stockholm suburbs Vallentuna, Upplands Väsby and Danderyd.

Sveplaserns användning till inventering/befästning/kontroll av vägmarkering

The thesis mission is to investigate whether the swiveling laser that Vectura (former Vägverket Konsult) has in use to measure the road areas and straddle measuring can be used to detect differences in the reflective road markings function. This is to increase use of the swiveling laser and get rid of the manual measurements performed today.Currently, the measurement of road markings reflective function is performed with both mobile and handheld measuring instruments. The purpose of this thesis is to develop better methods for determination of road markings? reflective function, in order to facilitate the description and suggestions for improvements of the maintenance of road markings reflective function.The questions that the thesis has been to start with are:Can the swiveling laser detect differences in longitudinal and transverse road markings reflective function?The accuracy of measurement has been sweeping the laser over the reference instrument (LTL-2000)Is it necessary with a conversion factor for swiveling laser data against the reference instrument data?To answer the question 2 and 3, there has been a field work in Värnamo where a road stretch with longitudinal road markings and zebra crossing (transverse road markings) has been investigated with a swiveling laser and LTL-2000.The formulas and calculations contained in the thesis are drawn from scientific reports that are produced by VTI in Linköping. The same formula that was used to calculate the optical measurement data was also used for the swiveling laser data.

Värdering av föroreningsrisk - Ett förslag till angreppssätt för värdering av föroreningsrisk till följd av emission från en vägkonstruktion

When constructing a road the risk of emission of substances from the used materials to the surrounding environment has to be evaluated. The aim of this study is to present a proposal for how to evaluate the risk of contamination as a result of emission from the materials in a road construction. The study is based on literature studies, an inventory and a questionnaire that examines how experts in governmental agencies, industries and universities evaluate the risk of contamination. The inventory indicates that guidelines for evaluating the risk of emission from secondary materials in a road construction do not exist. The conclusions from the questionnaire are: that there is no common way to evaluate the risk of contamination as a result of emission from materials in the road construction, there is no uniform interpretation of the terms "minor" and "significant" risk of contamination and that the evaluation is subjective.

Utvärdering av Skvallertorget i Norrköping

This thesis is an evaluation of the new traffic solution at ?Skvallertorget?. The innovative theory behind it is to increase traffic-safety by introducing insecurity feelings for road-users. The conclusion of the evaluation is that the newtraffic solution is well adjusted according to guidelines for municipal traffic planning. The evaluation also illustrates the conflict between traffic planners deliberate attempt to avoid clear information and the road users wish to get it.

Giraffens blodtrycksreglering

Through previous studies during my education, I have experienced that chemical deicing road salt is a known problem, mainly in southern Sweden. Road salt causes damage to the environment and also damage to vehicles and structures such as bridges, etc. Road salt causes vehicles and steel constructions to rust, leading to increased costs for repairs of damage to structures. Road salt also causes damage to the plants and the economy to suffer, when plant material and soil needs to be replaced. In order to get closer to a solution, I put up three questions.

Säkerheten på en byggarbetsplats : Förhåller sig Skanska och dess underentreprenörer olika till arbetsmiljösäkerhet?

Approximately ten people die every year at building sites in Sweden. Every year TheWork Environment Authority (Arbetsmiljöverket) receives 3200 accident reportsfrom the construction sector. The Swedish building contractor Skanska has the vision:?Zero accidents?. Only at Skanska Sweden, where this diploma work is preformed,350-520 accidents and mishaps are reported every year for the last 5 years.

Cross-Laminated Timber? En fallstudie av Hyttkammaren samt en jämförelse med prefabricerat betongelement ur platsomkostnadsperspektiv

Approximately ten people die every year at building sites in Sweden. Every year TheWork Environment Authority (Arbetsmiljöverket) receives 3200 accident reportsfrom the construction sector. The Swedish building contractor Skanska has the vision:?Zero accidents?. Only at Skanska Sweden, where this diploma work is preformed,350-520 accidents and mishaps are reported every year for the last 5 years.

Planering av väginvesteringar :

The problems around and the planning of wood flow is some of the most complex issues in the forest-sector. The experience and overview of the single employees is crucial for the possibility of correct tactical and economical decision-making. The increasing demand of savings and shorter reaction-times with greater flexibility in the wood-supply-chain, makes solutions and aids for improved effectiveness in the work and processes according to wood-flow urgent. Holmen Skog is starting to develop a new forest-road-management-system. The system will facilitate the work according to construction, improvements and updating the standard of roads.

Styrning och nödbroms av ModuLith

The purpose of this project is to get a fully functional, automatic steering system and a variable breaking system with an emergency breaking function to an off road vehicle. This off road vehicle is supposed to work as an aid in military situations. A team of two, Sebastian Attervall and Nichlas Gustafsson, got an order from Jonas Nyårds and the PreeRunners Project to construct a steering system that could manoeuvre an off road vehicle without any human involvement. To make this possible the vehicle would be guided by onboard sensors, cameras and computers. The team where also assigned to construct an automatic breaking system, there also no human would be involved.

<- Föregående sida 3 Nästa sida ->