Sökresultat:
8829 Uppsatser om Recommendation system - Sida 5 av 589
Studie av Karlskogas fjärrvärmenät för att sänka returtemperaturen
A district heating plant has the advantage that it can take advantage of the waste heat from industries and use of cheap fuels to produce heat. But for the long term is competitive requires that energy is also saved in district heating plants. One way to save energy in a district heating system is to increasing cooling to the return temperature. This leads to less power needed to drive the distribution pumps, and that more energy could be extracted from the same amount of fuel by an improved flue gas condensation.In Karlskoga the return temperature into the district heating plant is high. They would therefore reduce the return temperature in order to extract more energy from the flue gases.
Användning av dietfoder till hundar och katter på Smådjurskliniken vid SLU :
During one week (9-13 May, 2005) the use of veterinary diets for the hospitalised patients att the University clinic was registered. The animal owners were interviewed by telephone six months later about the feeding after coming home.
Four out of ten animal owners answered yes to the question if the veterinarian had asked what food their animal normally consumed.
Out of 35 animals, 15 (43%) were prescribed to a veterinary diet. Among cats it was 8 out of 14 (57%) and among dogs it was 7 out of 21 (33%).
Four animals out of ten were recommended a veterinary diet when going home, but 20% did not follow the recommendation all the way through and stopped feeding their animal the veterinary diet. Reasons that were given was that the diet didn't last the entire period, that the animal didn't need the diet anymore according to the owner and one dog that became to lean when fed the diet. The diagnosis for these three dogs was vomiting, foreign body in the digestive system and bloody diarrhoea.
Sju heuristiker för utvärdering av webb-API:er
The amount of web APIs that are open to the public is increasing fast. Both the free web APIs as well as the ones that cost money to access. Both bigger and smaller organizations, professional and non-professional developers use these web APIs to add value to their systems or use it to create new applications. This is an area study where alot of research has been done in the last few years. In spite of this there are still no user-centered evaluation methods for web APIs.
IT-system och organisationsutveckling
This report describes work on the thesis ?IT systems and organizational development?. The work is carried out on Stocksbro Energi AB, during spring 2009. The company wanted better flow in their production but also review if the inventory management function located in Visma SPCS Administration 2000, could be used in the organization. Under the first part of this report the system were tested to ensure if the system would work together with the organization.
Vilken funktion har belöningssystemet i en organisations ekonomistyrsystem? : en jämförelse mellan två storbanker
Two of Swedens´s major banks, SEB and Handelsbanken, which appears in the same industry and have similar strategy. Both banks can achieve a similar result despite the fact that their reward system looks quite different. An issue that arises from this observation is the relative reward system to the rest of the economy control system.Our purpose of this paper is therefore to examine the reward system in the organization's financial management systems. We wonder if the reward system may be a function of economic control system, or part of the system, or perhaps made independent of the system and then gradually adapted?In our study, we choose to assume a reward system has three functions to manage, motivate and compose the employee group.
Utveckling av Scania Buss projektöverlämningsprocess : - En studie för effektivare produktutveckling
Scania is constantly trying to improve their product development process, the PD-process.The company, along with others, is optimizing their development process in order to gainadvantage in terms of shorter lead times and larger market shares. For this to happen, a wellorganized process is required.The PD-process is divided into three different phases that are linked together by a hand-overprocedure. Scania Bus has experienced problems that stem from a lack of hand-over routines,and as a result the product development process has been slowed down. This has a number ofconsequences, one of them being the complication of new project initiations.The main purpose of this master thesis was to review the hand-over procedure. Within thestudy the project directive was also to be examined, and a recommendation of how the start ofa new project could be made easier was included.To begin with, a detailed literature study was conducted with the intention of obtaining thebasic theoretical knowledge needed for this study.
Eldistribution på offshoreenheter -Jämförelse av AC- och DC-anläggningar
Den här rapporten har som syfte att utreda vilket eldistributionssystem för offshoreenheter som sparar mest vikt och utrymme. De två elsystem som jämförs är GVAs standard system och Siemens Blue Drive System. Rapporten innehåller en teoretisk bakgrund för båda systemen och dimensionering av systemens kraftkablar samt beräkning av kabelvikter och komponentvikten för systemen. För att uppskatta kabel- rutter och längder kommer ritningsunderlag för GVAs offshoreenhet 7500 att användas.Resultatet visar att GVAs standard system är det eldistributionssystem som har den lägsta totalvikten med 168 ton, GVAs standard system har en vikt som är 101 ton lägre än Siemens Blue Drive System som har en vikt på är 269 ton. GVAs standard system har en lägre ström vilket gör att ledararean blir mindre och i med det blir kabelvikten mindre.
Släpslangspridning av gödsel, kan det löna sig? :
I have chosen to work with drag hose system and try to find an alternative to spread manure with a usually tank system, see if you can make a profit and what advantage and disadvantage the system has.
The purpose whith the project has been to try to make a system that can spread manure at better occasions than farmers do today and above everything make a financial addition. Today it is just a heavy work and takes a lot of time.
I have counted on investment costs and carefully examined what equipment you need. I have not the technical details in my project, I have just tried to understand how it is to spread manure with drag hose system today.
What is drag hose system?
You put a hose in your manuretank, connect it to a pump that is driven by a traktor or stationary engine. You place a hose that reach the field were you are going to spread.
Optimering av ett färdigvarulager
Den här rapporten har som syfte att utreda vilket eldistributionssystem för offshoreenheter som sparar mest vikt och utrymme. De två elsystem som jämförs är GVAs standard system och Siemens Blue Drive System. Rapporten innehåller en teoretisk bakgrund för båda systemen och dimensionering av systemens kraftkablar samt beräkning av kabelvikter och komponentvikten för systemen. För att uppskatta kabel- rutter och längder kommer ritningsunderlag för GVAs offshoreenhet 7500 att användas.Resultatet visar att GVAs standard system är det eldistributionssystem som har den lägsta totalvikten med 168 ton, GVAs standard system har en vikt som är 101 ton lägre än Siemens Blue Drive System som har en vikt på är 269 ton. GVAs standard system har en lägre ström vilket gör att ledararean blir mindre och i med det blir kabelvikten mindre.
Kvalitetssäkring vid implementering av ERP-system
När företag ska implementera ERP-system är det viktigt att företaget ser till att få kvalitet på implementeringen. Ett ERP-system är ett informationssystem som ska hantera alla funktioner inom ett företag på ett integrerat sätt. För att få kvalitet på implementeringen krävs att budgeten hålls, att implementeringen blir klar i tid, att processerna i företaget optimeras, att kraven tillfredsställs och att integreringen med andra system klaras av på ett bra sätt.Examensarbetet har undersökt om Business Blueprints kan vara en hjälp för företag när det gäller att säkra kvaliteten på implementeringar av ERP-system. Business Blueprints är en modell som guidar företag genom hela systemutvecklingen. Undersökningen har genomförts med hjälp av intervjuer och en litteraturstudie.Resultatet av undersökningen som detta arbete omfattar kan sammanfattas med att Business Blueprints är en hjälp för företag när det gäller att kvalitetssäkra implementering av ERP-system..
Ger systematiskt kvalitetsarbete bättre resultat i årskurs 9? : En studie av två skolor som fått kvalitetsutmärkelsen Bättre Skola
The management of information is a significant competitiveness in companies. Companies stored and save information every day, and it is very common to save de information in different sources. This makes de management of information complex. To mange, monitor and analyze the information, companies can use a system called Business Intelligence. BI system is an analytical system that extracts and converts data into useful information that helps employees to make informed decisions.
Processkartläggning för ökad vårdkvalitet och tillgänglighet
Den här rapporten har som syfte att utreda vilket eldistributionssystem för offshoreenheter som sparar mest vikt och utrymme. De två elsystem som jämförs är GVAs standard system och Siemens Blue Drive System. Rapporten innehåller en teoretisk bakgrund för båda systemen och dimensionering av systemens kraftkablar samt beräkning av kabelvikter och komponentvikten för systemen. För att uppskatta kabel- rutter och längder kommer ritningsunderlag för GVAs offshoreenhet 7500 att användas.Resultatet visar att GVAs standard system är det eldistributionssystem som har den lägsta totalvikten med 168 ton, GVAs standard system har en vikt som är 101 ton lägre än Siemens Blue Drive System som har en vikt på är 269 ton. GVAs standard system har en lägre ström vilket gör att ledararean blir mindre och i med det blir kabelvikten mindre.
Integrering av pelletsfabrik med Rya kraftvärmeverk i Göteborg : en teknisk och ekonomisk utredning
Göteborg Energi has a surplus of district heating during spring, summer and fall. The heat surplus is due to a constant production of waste heat from oil refineries and heat from waste incineration over the year. It would be desirable to increase the demand for heat and the uptime for the newly built combined heat and power generation plant, Rya Kraftvärmeverk. One alternative could be to integrate Rya Kraftvärmeverk with a pellet production facility. By producing heat, electricity and pellet in a joint process the energy use can be decreased.
Utvärdering av ett större bergvärmesystem i en flerbostadsfastighet som har konverterats från fjärrvärme
This master thesis is an in-depth study of an existing heating system at a household cooperative in Uppsala that has been converted from district heating to a bedrock heat pump system. The study focuses on an economical system optimisation of the building?s complete heating system. The aim was to determine how well a heat pump system in large buildings actually work, find out possible ways to optimize the existing system and point out important system parameters for new heat pump installations in larger buildings.The project points out a possible energy cost reduction of 45 % without investment and further cost reductions with equipment investments. A reduction by 30 % is possible by improvements in the regulation system and 15 % is possible by maintaining the brine system.
Utbredning av akustiska vågor i elastisk platta
Den här rapporten har som syfte att utreda vilket eldistributionssystem för offshoreenheter som sparar mest vikt och utrymme. De två elsystem som jämförs är GVAs standard system och Siemens Blue Drive System. Rapporten innehåller en teoretisk bakgrund för båda systemen och dimensionering av systemens kraftkablar samt beräkning av kabelvikter och komponentvikten för systemen. För att uppskatta kabel- rutter och längder kommer ritningsunderlag för GVAs offshoreenhet 7500 att användas.Resultatet visar att GVAs standard system är det eldistributionssystem som har den lägsta totalvikten med 168 ton, GVAs standard system har en vikt som är 101 ton lägre än Siemens Blue Drive System som har en vikt på är 269 ton. GVAs standard system har en lägre ström vilket gör att ledararean blir mindre och i med det blir kabelvikten mindre.