Sökresultat:
779 Uppsatser om Recency-Frequency-Monetary - Sida 10 av 52
Platschefens ledaregenskaper. Sett ur medarbetarnas perspektiv
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Metod för beräkning och jämförelse av lönsamhet för trafiksäkerhetsåtgärder
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Bostadsbyggande i Skövde fram till år 2025
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Energianalys av lackeringsbox. Utredning av ventilationssystem med åtgärdsförslag
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Ventilationssystem med variabla luftflöden - Optimal dimensioneringsmetod för VAV
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Påverkar euron resultatet av stabiliseringspolitiken? : En studie av stabiliseringspolitikens utfall i de nordiska länderna sedan eurons tillkomst, och av betydelsen av en nationell penningpolitik.
This paper discusses whether the main argument for European countries to stay out of the euro, i.e. the loss in stability from not having a national monetary policy that can be used for stabilization purposes, is still valid ten years after the introduction of the single currency. We analyse the stabilization performances of four largely comparable Nordic countries that have all chosen different levels of European economic integration. In retrospect, the so-called ?stabilization policy argument? seems surprisingly weak.
Uppföljning av EcoDrivingutbildning
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.
Utvärdering av samverkansbjälklag. Stålbjälklagskassett jämförd mot plattbärlag och håldäcksbjälklag
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Studie av beräkningsmetoder för pålar i kohesionsjord med pågående marksättningar
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Underhåll av asfaltbeläggningar. Utvärdering med inriktning mot årskostnad och livslängd
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Solvärme för flerbostadshus. Utvärdering av EKSTA bostad ABs solvärmeanläggningar
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Strategier hos de stora svenska byggföretagen 1992-2006
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Projekteringshandbok i praktiken. En studie om hur en projekteringshandbok används och kan förbättras
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey was performed. The voltages and currents have continuously been sampled in the incoming 10 kV substation HSP01 from April-August 2008. Power quality measurements were also performed in Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of the induction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps to the plant. The reason for the latter measurement was due to registered negative transients each time the motor was connected to the grid. The cause of the transients could be explained by the coupling in the substation, the ageing of the motor which could result in damage of the bearings or resonance in the motor circuit which amplifies high frequency harmonics.
Faktorer som påverkar Vänerns öppna sandstränder och möjligheterna för hög biologisk mångfald ? med mossor som indikatorer på igenväxning
The sandy beaches of Vänern are threatened by overgrowth and thereby the biodiversity is at high risk to decline. This study is based on an inventory of vegetation of overgrowth character and mosses. The frequency and spread of mosses is perceived as an indication of initial or present overgrowth. External factors that have been taken into consideration are wind-, wave- and ice erosion, the slope of the beach, wear and grade of exposure. The purpose of the investigation is to control the beaches grade of overgrowth and find out which external factor is of most importance for the maintenance of the biotope. The results show that the beaches environment is affected by the slope of the beach, grade of exposure, size, wear and overgrowth.
Laddningens påverkan på sprängskadeutbredningen
On a request from the water sewage plant Gryaab in Gothenburg a power quality survey wasperformed. The voltages and currents have continuously been sampled in the incoming 10 kVsubstation HSP01 from April-August 2008. Power quality measurements were also performedin Gryaabs other 10 kV substation HSP04 fed from HSP01 and at the terminals of theinduction motor IN_PU4040 of 1.3 MW which controls one of the four large inflow pumps tothe plant. The reason for the latter measurement was due to registered negative transients eachtime the motor was connected to the grid. The cause of the transients could be explained by thecoupling in the substation, the ageing of the motor which could result in damage of thebearings or resonance in the motor circuit which amplifies high frequency harmonics.