Sök:

Sökresultat:

256 Uppsatser om Railway stations - Sida 6 av 18

Marktäckande, lågväxt vegetation på ställverksmark : en biologisk bekämpningsmetod mot ogräs

Unwanted vegetation on the land of electric transforming stations is a problem, in the sense that it contributes to higher fire risks and also constitutes an obstacle for people performing maintenance operations at the station. Such unwanted vegetation is controlled using herbicides and mechanical measures. Since the use of herbicides implies environmental hazards, there is a need to find alternative ways of fighting the unwanted vegetation. Investigation into suitable plants for ground cover, trials in the greenhouse, trials in the field, soil analyses and compilation of experiences from similar trials are parts of this work. The paper also contains analyses of possible environmental benefits and economical gains. There is also a final discussion of some proposals regarding alternative weed controlling methods.

Bil- och järnvägstrafikens inverkan på inomhusmiljön med avseende på ljud och luft : - I planerade bostäder på Haga

NCC has given us a commission to investigate a planned housing area in Haga, Karlstad, situated close to the traffic route Hagaleden and the railway. The housing area consists of one hundred apartments in five different houses. The houses are linked to each other by balconies with glass panels. A long carport is situated between Hagaleden and the housing area to absorb part of the noise from the road. The design of the housing area is creating a silent backyard.

Tågtrafikledare i praktiken : Informationshantering och systemanvändning vid Gävle driftledningscentral

In Sweden whenever trains or maintenance workers want access to the railway system, their requests of usage and movements are being supervised, granted and handled by train dispatchers. The profession holds a key role in making the complex railway system work in terms of efficiency, safety and delivering on-time arrivals. This master thesis, delegated by the Swedish Transport Administration, has been carried out at the Division of Human Computer Interaction at Uppsala University and at the train traffic control center in Gävle. The aim has been to map what information the train dispatchers use in order to make safety-related decisions concerning their working goals. And further to describe and analyze how the train dispatchers, visavi their tools and systems in the work domain, gather necessary information.The result indicates a complex, diverse and spread out setting of different programs, procedures and tools that make satisfactory fulfilment of efficiency, safety and punctuality in relation to the time table hard.

Förbättringsförslag pådaglig styrning

The Swedish Transport Administration manage nearly 4,000 railway bridges in different condition and age around the country. These bridges is in constant need of maintenance and requires continuous inspections. This thesis is designed as a damage investigation on a single-track railway bridge south of Solvarbo in Säter municipality. The railway bridge is in operation and serves over 10,000 trains a year, everything from speed trains to freight trains. The bridge is built as a beam bridge, simply supported over a road.

STAD MÖTER HAV - Planförslag för Varbergs stations- och södra hamnområde

Centralt belägna hamnområden världen över blir idag föremål för stadsutveckling till följd av att kustnära verksamhetsområden omlokaliseras eller avregleras och vars frigjorda markarealer ger utrymme för ny bebyggelse. Varbergs stad står idag inför ovan nämnda förändring mot bakgrund av beslut att förlägga Västkustbanan i tunnel under stadens centrala delar likväl beslut att omlokalisera Grenåfärjans tilläggsplats och Handelshamnens centralt belägna verksamheter till mer perifera hamndelar i staden. Barriärer försvinner och markarealer frigörs vilket skapar förutsättningar att etablera ny bebyggelse inom Varbergs stations- och södra hamnområde och åter låta staden möta havet längs denna kuststräcka.Föreliggande magisteruppsats resulterar i ett planförslag för ny bebyggelse inom Varbergs stations- och södra hamnområde. Syftet med uppsatsen är att, utifrån teoretisk och praktisk kunskap om dagens stadsutveckling, skapa en bebyggelse som harmonierar med omgivningens småskaliga stadsstruktur och samtidigt möter stadens och regionens tillväxt och medföljande behov av centralt belägna bostäder och lokaler för verksamheter och service. Planområdets lokalisering medför goda förutsättningar för en blandad bebyggelse och planförslaget tar utgångspunkt i integrerade funktioner så som bostäder, kontor, handel och service.

Utsikt från höghastighetståg : om reseupplevelsens krav på landskapet

As we travel more and more by train it becomes increasingly important that the time we spend traveling, is of great quality. This has been the foundation of this master thesis and has shaped the outcome of it. The traveling experience, that is, the experience of the landscape that flashes by outside the train window, is an important aspect in railway planning and an aspect that should be taken into greater consideration. The purpose of this master thesis has been to examine how to compose or improve the travel experience for an already planned high speed railway and how the travel experience can be combined with other aspects, which have claims on the landscape. This thesis is based on a literature study and a case study of Ostlänken. The work describes Ostlänken, a planned high speed railway in Sweden between Järna and Linköping, with top speeds at 300-320 kilometers per hour.

Skogs- och energibolagens attityd till förnybara drivmedel vid upphandling av transporttjänster i norra Sverige

Sweden's government is dedicated to the goal of having a vehicle fleet that is independent of fossil fuels by 2030. Achieving these goals requires, among other things, new types of fuel that give lower net emissions of carbon dioxide. The present market includes stations offering lowlevel blends of renewable fuels in conventional diesel as well as some stations offering renewable fuels only. The purpose of this study is to survey purchasers? attitudes to the use renewable fuels in roundwood and bioenergy transport in forest- and energy companies. The study was based on qualitative interviews through a combination of face-to-face meetings and telephone interviews with each sample group. The total number of respondents was ten (10), consisting of five (5) from forest companies and five (5) from energy companies. Transport service purchasers were generally positive to renewable fuels and considered these necessary in the future.

Tidssynkroniserade mätningar i vattenkraftstationer

Vattenfall and Svenska Kraftnät perform start-up tests, where hydropower generators are used to power up the electrical grid in case of a blackout. To monitor the electrical grid, Phasor Measurement Units (PMU) are used. Each PMU is individually equipped with a GPS-receiver to precisely timestamp the data relative to the official time UTC. During the test, it is also of interest to timestamp the measurement signals from individual hydropower generators to later compare with PMU-data, and thus study the power grids impact on the generator. The aim is to work out an appropriate method to make these measurements and to build a data acquisition system, capable of timestamp data relative to UTC, from a generator in one of Vattenfalls hydroelectric power stations. The problem is that the generator is located in an underground station which hampers the reception of GPS-signals and wiring should be avoided if possible. Time synchronization has been solved by using Vattenfalls network, which is synchronized by the network protocol NTP.

Beteende inför lek hos odlad respektive vild lax (Salmo salar L.) i Klarälven

In many regulated rivers, authorities have stocked hatchery salmon to compensate for loss of wild populations. However, hatchery fish have not always behaved as wild fish do, and stocking them has not always fully compensated for the loss of wild fish. The purpose of this study was to compare swimming behaviour in the river before spawning, the choice of spawning areas and body size between wild and hatchery-reared salmon in the river Klarälven. Salmon behaviour in the river before spawning was analyzed using radio telemetry. The salmon were caught at Forshaga power plant, radio-tagged and returned to Klarälven at Ekshärad, 107 km from the river?s mouth.

Problematik kring spårväxlar : Framtida åtgärdsförslag

Sveriges järnvägsnät är gammalt och utsätts för en allt högre belastning varje år i takt med att trafiken på spåren ökar. Detta medför att slitaget på järnvägarna ökar och en väldigt känslig del är spårväxlar. Då ca 20 % av alla fel beror på problem med spårväxlar läggs fokus i rapporten på att utreda denna problematik. Syftet med arbetet är att kartlägga vilka spårväxelfel som uppstår och orsaken till dessa, samt att komma med åtgärdsförslag för att minska problemen med spårväxlar som leder till förseningar och stopp i trafiken. Rapportens inledande del består av ett teoriavsnitt som beskriver hur en växel är uppbyggd och hur den fungerar.Tre bandelar i Sverige har studerats, en i norr, en i söder och en i Stockholm.

Byggnation av ett tak i Lwengo Basilla : En fältstudie med fokus på infästningar, pelare och bärläkt på en skola i Demokratiska Republiken Kongo

The Swedish Transport Administration manage nearly 4,000 railway bridges in different condition and age around the country. These bridges is in constant need of maintenance and requires continuous inspections. This thesis is designed as a damage investigation on a single-track railway bridge south of Solvarbo in Säter municipality. The railway bridge is in operation and serves over 10,000 trains a year, everything from speed trains to freight trains. The bridge is built as a beam bridge, simply supported over a road.

Ständiga förbättringar i lagerverksamhet på Nedis AB

The thesis has been carried out at Nedis AB in Jönköping. The aim was to develop proposals on approaches that could help the company to continually improve their warehouse operations by eliminating unnecessary operations, making the warehouse more structured and how they better could use the staff's suggestions for improve-ment. The collection of data consists of observations, interviews with a total of nine people from the staff of Nedis AB and a benchmarking conducted at Husqvarna AB. A number of shortcomings and weaknesses in procedures at the warehouse were iden-tified. Packing stations were not standardized and they were seen as poorly structured and messy.

Modeller för utvärdering av set-up för återvinning av lastlister inom IKEA

Reverse logistics is getting more and more attention both from companies and the public. It is an area with the possibility for companies to do good in the eyes of the public. This work focus on the return system of a one-way handling material called the loading ledge. The loading ledge is developed by IKEA as a substitute for the EUR-pallet in transports from suppliers with a long distance and even flow and in transports from suppliers with short distance and uneven flow. The loading ledge is made out of 100 % recyclable plastic.The purpose of this work is to find the most efficient set-up for recycling of loading ledges within IKEA on a European level from a transport and handling point of view considering aspects like cost, environment, time and, from an administrative point of view, user-friendliness.Who will the participants of the set-up be, where will they be located, which transports are needed and which income and costs does the set-up generate, are questions that will be answered.

Konkurrensutsa?ttningen av den svenska ja?rnva?gen och New Public Management : En problemrepresentationsanalys

The aim of this study is to investigate the problematisation of the swedish railwaysector during the early 1990?s from a New public management-perspective. The method of approach is a ?What is the problem represented to be?-analysis as advocated by Carol Bacchi. By applying this method to the official investigation aimed at providing suggestions for increasing competition in the railway sector it has been shown that the process of deregulation has strong connections to the ideas and models suggested by the New public management-ideology of organisational theory. .

Järnvägens banutnyttjandeplanering : nuläge och förbättringsförslag

The Swedish National Rail Administration has changed in the past decade, from its origin after a less dramatic separation from the Swedish State Railways to becoming an authority with its own identity. Today the National Rail Administration is a large organisation with several different departments, each with its own unique function. To operate train services the railway needs to be ?in shape?, leading to a need for maintenance, reinvestments and new investments. For this purpose, the National Rail Administration carries out public procurement where contractors, who are able to perform maintenance and new construction, submit tenders.

<- Föregående sida 6 Nästa sida ->