Sök:

Sökresultat:

906 Uppsatser om Pump capacity - Sida 4 av 61

En validitetsstudie på beeptestet : avseende maximal aerob kapacitet för elitishockeyspelare

Introduction: This study aimed to investigate the validity and reliability of the 20m multistage shuttle run test (MST) for elite ice hockey players as a predictor of the maximal aerobic capacity and the how the result is affected by the players age, aerobic and anaerobic capacity, body composition and test surface. The purpose of this was to find out the potential of the 20-m shuttle run test as a measuringtool for the maximal aerobic capacity in frequent testing periods during the season. It is very interesting to be able to administer this easily because the competative phase of the season is very long compared to the pre-seasonal phase and earlier studies have shown that the aerobic capacity is being lowered during this competative phase of the season for elite icehockey players.Methods: 34 elite ice hockey players participated in this study (20.0±3.6 yrs, BMI 24.2±1.6 and VO2-max 58.0±4.8 ml O2?kg-1?min-1). During 3-5 days they underwent 2 MST tests (wood and rubber surface), treadmill running with VO2-max assessed with open-circuit technique, Wingate10% and FFM-assessment with underwater-technique.

Kartläggning av utredningsprocessen vid Arbetsförmedlingen Rehabilitering i Sverige : en pilotstudie

The Swedish National Labour Market Administration wishes to acquire further knowledge about how the evaluation process of vocational rehabilitation at the employment service operates as a part of the quality assurance of this activity. The primary task for vocational rehabilitation at the employment service is to investigate the work capacity of unemployed people, to give them increased knowledge and better understanding of their own capacity concerning work or education. The aim of this study was to survey the evaluation process of vocational rehabilitation at the employment service in Sweden. Data were collected through telephone interviews with 15 occupational therapists employed at the employment service, who were working with vocational rehabilitation. The result shows that the investigation of work capacity can take place in different environments and that the space of time for an investigation can vary.

Fällning av kisel från avloppsvatten vid Hellisheidarvirkjun - experimentell studie

This report is about the experiments with mixing of the separated water and the vacuum pump seal water at Hellisheiði power plant. This is done to prevent silica scaling and clogging in pipes and reinjection wells as well as eliminating vacuum pump seal water from the plant. The experiments were done in four stages: the first stage comprised of tests with different flows of separated water at 70°C, the second stage was carried out by mixing the separated water at 70°C and the seal water with different amounts of the seal water, the third and the fourth stages were like the first and second but with the separated water at 120°C. The results show that this method is good if the mixture is around 50/50 separated water and seal water, to control the silica scaling in the separated water and to be able to reinject the seal water with the separated water. This does not eliminate the silica scaling in all of the separated water because the amount of separated water is much more than the amount of seal water that comes from the plant. .

Avbördningskapacitet för Traryd kraftverk: en modellstudie vid dimensionerande flöde

Sydkraft Vattenkraft AB owns and operates the Traryd hydropower plant, located in the river Lagan in the southern part of Sweden. The gravity dam is classed according to RIDAS guidelines (Hydropower Industry Dam Safety Guidelines) as a class 1B dam. This means that the dam must discharge a class 1-flow which has a return period of 10 000 years. The inflow into the dam has been calculated in an earlier report to 495 m3/s, with a waterline at an elevation of 126, 3 meters above sea level. The gravity dam has a discharge system with two rectangular weirs, which results in a smaller discharge than the necessary 495 m3/s.

En kombinerad Organisk Rankinecykel och värmepump integrerat med ett fjärrvärmesystem : Där värme- och elproduktion samt lönsamhet studeras och avfall är huvudbränslet

The demand for district heating is expected to decrease in the future, due to competition from heat pumps and energy efficiency measures in buildings. Development of existing district heating systems is therefore necessary for district heating companies to maintain market shares. This Master?s thesis describes and investigates the heat and electricity production and profitability of a combined Organic Rankine Cycle (ORC) and heat pump that is integrated with an existing district heating system. The studied district heating system is utilizing heat from waste incineration. In Sweden waste constitute 20 % of the fuel mix used in district heating systems, and this share is expected to increase in the future.

Kapacitetsberäkningsmodell för materialhanteringsflödet på Ericsson i Kumla

Ericsson?s factory in Kumla, Modules Kumla, became a hub for radio modules and micro base stations, which enables mobile communication through radio base stations, in 2004. Because of this the factory focuses more on the logistics operations. This has led to a need to be able to plan the capacity for the materials handling system. This master thesis has therefore been performed at Modules Kumla to develop a capacity calculation model for the material handling flow during the autumn of 2005.The work has contained a mapping of the material handling flow regarding to which activities was performed and how much time they consumed.

Friidrottsungdomars fysiska kapacitet över tid : En retrospektiv studie av intagningstesterna vid friidrottsgymnasiet i Växjö mellan åren 1982 ? 2009

Background: Today when leisure time is spent, spontaneous sports activities decrease, due to a more comfortable way of living and physical capacity among non active adolescents decreases. There for it´s interesting to see how the physical capacity level has changed over time among young people participating in organized leisure time sports.Studies around the world show that young people standing outside organized sport activities have tended to decrease their physical activity levels over the last few decades. Less leisure time is spent doing physical activity and sometimes gets put into context with increased time spent behind the computer or inactivity.Design: A retrospective study of the test results on physical capacity between 1982 and 2009 for students applying to Växjö track and field high school. A total of 635 students (15 years old) have done 11 physical tests during the years. Five of these tests, with enough participants (at least 100) and documentation over at least 10 years, were used in this study.Results: This study shows that young track and field athletes have maintained the same physical capacity from 1982 to 2009.

Vidhäftning mellan prefabelement och pågjutningsbetong : Undersökning hur skrovligheten påverkar vidhäftningskapaciteten vid skjuvning

Self-compacting concrete has soon been around for a decade. Recently the prefabrication industry has started to use this fairly new concrete type in larger scales, mainly because of its distinctive properties.  There are still certain areas that need to be thoroughly examined, such as bond capacity. There have been very few studies regarding shear capacity due to the fact that the procedure is complicated.This report will highlight a method to examine the shear capacity of different surfaces that have been prewetted as well as non-prewetted surfaces. The surface areas follow BBK 04?s and Eurocode 2?s demand for surface roughness.  A smooth surface will be completed in order to confirm if the different shapes influence the bond strength by shear stress or not.                       The purpose of this essay is to measure the bond strength within the shear capacity as well as examine the impact it has on surface roughness and treatment for shear bond.The method used to identify the shear capacity is called L-shaped Push-Off Test.

Underlag för övergång från ventilstyrt till frekvensstyrt rörsystem

Sedan 2000-talet har Sveriges största kraftvärmeverk MälarEnergi, har övergått från ventilstyrda rörsystem till frekvensstyrda i sina stora pumpsystem. På detta sätt har över 30 miljoner kronor samt över tusen ton CO2 sparats. Idag har MälarEnergi tillsatts en utredning i syfte till att se över möjligheten att genomdriva en liknande energieffektivisering för sina mindre pump- och rörsystem. Dessvärre saknas det korrekta data över tryckfallen i dessa mindre system, eftersom många av dessa är byggda under slutet av 1970-talet. Detta examensarbete handlar om att ta fram ett underlag för val av nya pumpar till ett valt pump- och rörsystem, AMP41-42.

Arbetsminneskapacitet: relation till verbalt flöde och indirekt minne för inhiberat material

Processing information in complex everyday life recruites different abilities than limited storage capacity. Working memory, the central executive and inhibition are constructs that have been used to describe this ability of adaptation. This paper investigates the connection between working memory capacity and performances in tasks closely associated to real life situations, i. e. verbal fluency tasks.

Jämförelsestudie för tre olika metoder att beräkna genomstansning i betong : Skillnader i genomstansningskapacitet för metoderna i BBK04, EK2 och BHB

Before the European construction standards were introduced in January 2011, it was mainly themethod in BBK04 that was used for calculating punching capacity in concrete structures, and in lesscommon cases the method in BHB. The method of BBK04 is easy to use and have had the samestructure since the first was published in 1979. The Concrete handbook method (BHB) where usuallyonly used when a higher punching capacity was needed and the cross-sectional height where fixed,calculations using this method entails more work, but will in return usually give a higher capacity. Italso allows the use of shear reinforcement to increase the cross-section capacity. The method ofcalculating punching shear in EC2 differs largely from the methods of BBK04 and BHB.

Planseparerad spårtrafik i Göteborg

The City of Gothenburg has an urgent need to upgrade its public transport. The capacity of its light rail transit (LRT) has reached maximum capacity within the inner city limits years ago. The construction of an underground metro will be very expensive and time consuming due to the soft clay beneath the city. The apparent need of developing another type of mass rapid transit (MRT) is urgent. An elevated metro have turned out to be a success in Greater Vancouver, but is it possible for the system to operate well in Gothenburg with its narrow streets and current land use; will its route coexist with the current LRT or will the noise disturb people too much?.

Sörplingsdetektering i en Centrifugalpump med Vibrationer

Detta examensarbete är utfört på ITT W&WW i Sundbyberg, Sverige, i samarbete med KTH, Instutitionen för Maskinkonstruktion. Arbetet har gått ut på att finna parametrar som kan användas för att detektera sörpling i en pump. Arbetet har fokuserat på att undersöka om vibrationer och ljud kan ge information om när pumpen sörplar eller ej, samt att utveckla en algoritm baserat på dessa parametrar.När en pump pumpar en blandning av luft och vatten kallar man det att den sörplar. Detta innebär slitage på pumpen samt energiförluster, då verkningsgraden minskar betydligt. Detta är ett problem för bland annat dräneringspumpar inom gruv- och byggindustrin där permanenta installationer och externa sensorer för att undvika sörpling ofta saknas.

Planeringsverktyg för ABB Capacitors : Planering av körsekvens

ABB Capacitors is looking to introduce LEAN within their organization. The purpose of this research is to suggest ways to improve the production planning in order to facilitate the company?s production processes. This should be done in accordance with the LEAN concept.Today, ABB will produce two of the customers? orders at the same time.

En systemlösning för en framtida fjärrvärmeutbyggnad i Täby : ur Fortum Värmes perspektiv

At the moment in central Täby there are small district heating network operated by Fortum Heat. The distribution network has an annual heat demand of about 70 GWh, which is supported by the network's two plants, Galten and Farmen. Täby as a region is rapidly growing and there are grand plans to develop the area. Estimated market potential for a future district heating expansion in Täby is very high and as early as in 2007 Täby decided to invest in a large-scale expansion. In autumn 2009 Täby did a procurement process, known as the ?Täby initiative?, to find a partner that could implement those expansion plans. To secure a cheap basic production the partner also need to build a power plant at Hagby recycling center. Despite high interest during initial state of the process, only one procurement offer were received and Täby suspended the contract in March the following year.

<- Föregående sida 4 Nästa sida ->