Sök:

Sökresultat:

12640 Uppsatser om Project work - Sida 13 av 843

Robotiserad produktionsanpassad magnetmontering för vågkraftverk

This thesis work includes studies and simulation how magnetization of the translator in a linear generator for wave power can be automated. The translator is the moving component in the generator that is "dressed" with permanent magnets. The translator is magnetized with rectangle-shaped permanent magnets that are today's strongest permanent magnet type of neodymium-iron-boron (NdFeB).Eight equivalent metal sheets are mounted around the translator. The plates have milled tracks where 106 permanent magnets per sheet are mounted. Today the assembling of the magnets is done by hand, which is a very tedious and time-consuming work.  This project presents investigations about the automation of the translator magnetization theoretically and simulation results are preformed in ABB's robot simulation software RobotStudio. Even robot-held tool was designed that enables the robot to be able to magnetize the translator in a simple manner.  The investment cost is roughly 1.5 million SEK. With an economic life-time of five years, the investment costs are estimated to 24000 SEK / month.  According to the calculations, this project is very motivated to implement, as it provides savings up to 17 000 SEK per translator which is 10.2 million SEK assuming that the robot cell is operating at full speed the whole year.According to this thesis work the result is a 4x9 meter cell with two industrial robots of the type ABB IRB6650S.The cycle time to magnetize one translator was calculated to about 10 hours.This prototype of project can possibly be implemented in a full-scale production line and performed according to the calculations and simulations presented in the report. Further work is suggested to improve the tool.Lyssna .

Standardisering av funktionsblock for PLC

Automationscenter & Bråvalla Elteknik AB is a company that offers the market completed total solutions where the customer can operate and monitor their production from the terminal. In these total solutions they lack standard circuit which are developed by the company and which could manoeuvre/control/monitor controlled process objects. This report defines the work of developing the most common standard circuits.The report is initiated by a short theoretical part about PLC and the PLC system, with a connected terminal, which has been used. Thereafter, the turnout of the demands of specification is reported, after discussing with the supervisor in the course of the project. The report concludes with a disclosure of how the programming, the documentation and the testing have proceeded and a final discussion concerning the project and proposals on continuation.The result is a CD with the documentation of standard circuits and how they are implemented in a new project.

Frivilliga organisationers betydelse för välfärden : En studie av projektet God Livsmiljö i Uppsala kommun

In the beginning of the nineties there was a change in how the voluntary sector was perceived, and the significance of their work became reevaluated and more acknowledged. As a result, this sector gained a new and higher interest. The changes and downsizing in the welfare state with economic crises, due to political cutback, made the politicians look fore new solutions. One solution is to encourage cooperation between the public sector and the voluntary sector in order to handle the different needs of individuals.Uppsala community and the voluntary sector are working closely together within a project called ?God Livsmiljö?.

Skolbioprojektet i Kungsbacka - en etablerad verksamhet?

This thesis is an attempt to study if the school cinema project in Kungsbacka is an establishedactivity. Qualitative interviews have been performed with the cinema owner, the projectleader and a politician of the municipality, about their views on the project. Teachers andpupils have also been interviewed. In the case of an established activity, the thesis also attemptsto answer what causes have contributed to such an establishment.The study shows that the school cinema project is an established activity in Kungsbacka andthat all parties involved are satisfied with it. The project has guaranteed the cinema's existence.According to the thesis, the reasons for the establishment are that govemment funds enabiedthe project to initiate.

DIGITAL VISUALISERINGSTEKNIK : möjligheter, för- och nackdelar

Ever since the development of the pc and their software, in the early 80´s,architects way of work have changed a lot. Nowadays most of the architectspresent all their works digitally and not with hand drawn material, as they didbefore the pc boom.Digital visualisation technique pushes the limits, when it is about presentingarchitecture projects virtual reality.This report studies how digital visualization technique is used among thearchitects today.Together with architects from ABAKO architect firm in Gothenburg, Sweden,interviews has been made to give answers about what they think about digitalvisualization technique. What are the opportunities, advantages- anddisadvantage with this digital technique?The answers from the architects, together with work that has been done withdigital visualization technique in a project called Project Sofiedal, shows thatthis technique has big opportunities when it comes to create nice looking VRpresentations. The result in this report also shows that this digital technique ismore time demanding compared to hand drawn presentations.The investigation shows that digital visualization technique is a goodcompliment when it is about showing the citizens how future projects willaffect the surrounding.

Fundament för kompaktkran : En universell lösning

This thesis describes the universalization, improvement and further development of acompact crane support frame for flatbed trucks. The work has been conducted at Eloch Fordonsteknik AB (henceforth EFAB) in Uppsala.The aim of the work has been to shorten the assembly time of the product. By doingso, the product can be kept on shelf, which in turn results in shorter lead time. Thishas been done by universalizing the support frame to be compatible with most of thechassis EFAB works with. Additionally, the entire construction has been made lighter,which will make it a more attractive choice for customers.A pre-study was conducted and information was gathered internally, as well asexternally, in order to ascertain that no limitation or possibility was overlookedduring the course of the project.One such limitation has been the geometry of the truck bed that the support frameshall be compatible with.

Testrigg för glidlager

This report will detail the participator view of partnering in Kvarteret Frodeparken. Kvarteret Frodeparken is a new construction project being jointly delivered by Skanska Sverige AB and Uppsalahem AB. The report will focus on the comparison between the participators view of partnering with an emphasis on common partnering goals. The report will also focus on the economical benefits, the time benefits and the social environment benefits you can find in partnering.The principals of partnering are; participants together make the common goals for the projects, make ice breaking activities to improve stakeholder engagement and working with an open economy to find the profitable choice for the project. With a combination of the three principals the team together decide the best solution for the project.

The Lake

The purpose of ?The Lake? was to create an experience with music and visuals working with no budget.A personal purpose was that I wanted to explore new areas in design, like scenography, and combine them with my previous knowledge and skills. My method was to keep my hands busy at all times and use new materials. I also wanted to work with other creators and learn from their methods. Together with a musician I created the music and the concept for the project.

Driftkostnadsanalys i väginvesteringsprojekt

During its lifetime, a road goes through a number of different stages; pre-study,inquiry of the road, work plan, documenting stage, building stage and operatingstage. The operating stage is the one that takes the longest time and costs themost. Those have a tendency of becoming unnecessarily high because the projectengineers don?t always take the management and maintenance prerequisites intoconditions.To decrease the management and maintenance costs, the Swedish RoadAdministration SouthEast has been in need of a work procedure that makes theroaddesign engineers take the management and maintenance of the road intoconsideration. This shall be achieved by a checklist where the most commondesigns that lead to increased management- and maintenance costs are compiledand listed.Through interviews with project leaders in management, the most commonproblems have been identified, analyzed and summarized under the headlineswinter-road, vegetation, road equipment and road designs.To elucidate the problem from several points of view, interviews wereimplemented with project leaders in investment and roaddesign engineers.

Scandinavium : Sveriges största inomhusarena

Ever since the development of the pc and their software, in the early 80´s,architects way of work have changed a lot. Nowadays most of the architectspresent all their works digitally and not with hand drawn material, as they didbefore the pc boom.Digital visualisation technique pushes the limits, when it is about presentingarchitecture projects virtual reality.This report studies how digital visualization technique is used among thearchitects today.Together with architects from ABAKO architect firm in Gothenburg, Sweden,interviews has been made to give answers about what they think about digitalvisualization technique. What are the opportunities, advantages- anddisadvantage with this digital technique?The answers from the architects, together with work that has been done withdigital visualization technique in a project called Project Sofiedal, shows thatthis technique has big opportunities when it comes to create nice looking VRpresentations. The result in this report also shows that this digital technique ismore time demanding compared to hand drawn presentations.The investigation shows that digital visualization technique is a goodcompliment when it is about showing the citizens how future projects willaffect the surrounding.

Trolley Innovation Project - Serveringsvagn för flygindustrin

Bachelor thesis, Trolley Innovation Project, has been unique in the sense that it has been carried out over the borders of Sweden. Iacobucci S.p.A, located outside of Rome in Italy is one of the largest manufacturers of interior equipment for aircraft in the world. With approximately 30% of the market Iacobucci S.p.A is one of the world's largest manufacturers of catering trolleys.The aim has been to produce a new competitive catering trolley for the airline industry. With customers and users in focus, the project team found that weight, ease of use, ergonomics and design were important aspects. Having a low weight of all the interior is particularly important when there is lots of money for the airlines to save in reduced fuel costs.

Dubbel problematik : socialtjänstens, psykiatrins och beroendevårdens föreställningar om samverkan kring dubbeldiagnostiserade

The essay's aim was to see which attitudes county council's and municipality representatives had about themes like: collaboration and competence in the work around double diagnosed persons. Its objective was to zero in on the attitudes of the representatives regarding a coallocated collaboration project in Stockholm. Also, it sought to find out what attitudes the representatives had about the other representatives attitudes concerning the above mentioned themes. A number of attitudes were presented during the qualitative interviews with the representatives, highlighting which attitudes seemed strongest. Then the interviews were analyzed using meaning condensation and then set against the theory of social representations.The analysis showed that before work with the target group starts, there?s a need for synchronization of the different representatives involved in the collaboration project.

?Hyllan kan vara början till en stege!?: Sociokulturella aspekter på lärande i Demoteket

The aim of this master?s thesis is to explore what learning potentials there are in Demoteket. Demoteket is an on-going project that preserves and exhibits young people?s artistic creations. The idea is that public libraries receives and lends out the young people?s artistic creations.

Rullarmering - Ett rationellt sätt att armera

This is a degree project performed at Halmstad University in Sweden on the subject carpet ofreinforcement. This project is developed in association with Celsa Steel Service in Halmstad.The purpose of this report is to investigate how much time that can be saved if carpet ofreinforcement is used instead of the traditional way to work with reinforcement and seewhat kind of parameters that is important between the choices. We are also going to seehow this product affects the situation for reinforcement workers from an ergonomic point ofview.Carpet of reinforcement is made by straight reinforcement?s bars that are welded togetherwith steel bands. These rolls are made at a factory with a machine that welds together thebars in determined centre distance, with desired dimensions after the constructionengineers? blueprints.

Handledning vid framtagande av handlingar för Generalentreprenad

This term project addresses how to develop construction drawings for a general contract. The project contains supervision, including blue prints as support as needed.Apart from directions on how to carry out the actual work, the supervision also discusses regulations governing all construction drawings. The supervision is created as guide for similar projects.The construction drawings is a complete construction guide, hence it includes all construction drawings. In addition, a room description and a general description is included..

<- Föregående sida 13 Nästa sida ->